Solicitations
› TRANSPORTATION, DEPARTMENT OF
› NAICS 238320
Refurbish/Repaint Antenna Towers
TRANSPORTATION, DEPARTMENT OF · Solicitation 697DCK-26-R-00351 · NAICS 238320 · Total Small Business Set-Aside (FAR 19.5) · Closed
This solicitation has closed.
Responses were due 20 July 2026.
The record stays published because closed procurements are what a recompete is
built from — the follow-on is typically solicited 6–18 months before the
incumbent contract ends. Open solicitations like this one are linked below.
Solicitation details
| Solicitation number | 697DCK-26-R-00351 |
|---|
| Notice ID | 03ea0add4651447da9bae08c8ed6ea58 |
|---|
| Agency | TRANSPORTATION, DEPARTMENT OF |
|---|
| Sub-tier | FEDERAL AVIATION ADMINISTRATION |
|---|
| Contracting office | 697DCK REGIONAL ACQUISITIONS SVCS |
|---|
| NAICS code | 238320 |
|---|
| Product / service code (PSC) | Z1BG |
|---|
| Set-aside | Total Small Business Set-Aside (FAR 19.5) |
|---|
| Notice type | Solicitation |
|---|
| Posted | 16 July 2026 |
|---|
| Response deadline | 20 July 2026 (closed) |
|---|
| Place of performance | Shelton, CT, USA |
|---|
Description
Purpose of Amendment 01 is to release the official question and answer (Q&A) and provide clarification on bonding requirements as follows: FIRST: When it comes to bonding and if it is required with your proposal, the answer is yes if your proposal exceeds the threshold of $150,000.00. There was a discrepancy discovered between between pages 03 and 77 of the solicitation. Therefore, the amount found on page 77 is incorrect and should read as the following: L.2 REQUIRED DOCUMENTS The Offeror MUST return the following completed documents as part of its offer to be considered eligible for award. FACTOR 1: OFFER AND OTHER DOCUMENTS 1.Cover letter stating that no exceptions are taken to any specification requirements or contract terms and condition, or detailed summary of all exceptions taken. 2. Signed SOLICITATION, OFFER AND AWARD form and acknowledgement of any issued amendments. 3. Price proposal that includes all costs necessary to perform all work in accordance with each associated Statement of Work (SOW), and the Davis Bacon Wage Rates. All these attachments can be found in Section J. 4. Section K, Representations, Certifications, & Other Statements of Offerors. 5. Certificate of Liability from your insurance company that shows you can meet the requirements identified in this solicitation. 6. Performance bonding is required if your proposal exceeds $150,000.00. This has also been further explained in attachment J-3, Official Question and Answers for 697DCK-26-R-00351. ******************************** SECOND: Attachment J-3, Official Question and Answers for 697DCK-26-R-00351 is hereby released. ******************************** THIRD: The due date for proposals remains unchanged: Noon (Eastern Time) on July 20, 2026. ******************************** FOURTH: All other terms and conditions remain unchanged and in full effect. SCOPE OF WORK: 1. Surface preparation: i. Remove any visible oil, grease or salt contaminants. ii. All steel surfaces must be prepared in accordance with SSPC-SP 2 (Hand Tool Cleaning), SSPC-SP 3 (Power Tool Cleaning) and SSPC-SP 11 (Power-Tool Cleaning to Bare Metal) Standards. SP11 must only take place when necessary. Following hand and power tool cleaning, all surfaces must be brushed, blown clean with compressed air or vacuumed to remove all dust, and debris before the application of any coating. The Contractor must prevent the migration of debris, paint chips and dust to adjacent properties. All debris must be collected at the end of each workday. No debris must be left on-site overnight, and the premises must be returned to a clean condition upon completion of work. iii. Hazardous Materials Requirements: The FAA completed lead, heavy metal (chromium and cadmium) and polychlorinated biphenyl (PCB) sampling on the 75 towers which were found to be detected. The contractor must review the attached sampling report to ensure awareness of the presence of hazardous materials and must ensure that all surface preparation work must comply with all local, state and federal requirements. 1. Summarized Results: Tower A: Detected lead-based paint, polychlorinated biphenyls, chromium and cadmium. Tower B: Detected lead-based paint, chromium and cadmium. PCBs were found to be not detected but Contractor must assume PCBs are present. Tower C: Detected lead-based paint, polychlorinated biphenyls, chromium and cadmium. Tower references are shown in a diagram in the last page of the sampling report. a. Contractor must submit on a project specific Health and Safety Plan mitigating all hazard identified in the tower sampling report. All work must be completed in accordance with OSHA, EPA, SSPC/AMPP Standards and all other relevant standards. The Contractor must have a class 3P containment to prevent debris from spreading outside the worksite. See submittal section for all required submittals. b. All waste must be disposed according to Connecticut Department of Energy and Environmental Protection and EPA regulations and disposed at waste facilities that accept the associated hazardous materials. c. Contractor must provide a manifest in accordance with all federal, state and local standards. 2. Spot Prime Coat: All bare steel surfaces must receive one spot prime coat of Tnemec Series 135 Chembuild epoxy, or approved equal, in color 1243 Metallic Aluminum at 4-6 mil Dry Film Thickness (DFT). Follow all manufacturer requirements. 3. Full coat: Apply full coat of Tnemec Series 135 Chembuild epoxy, or approved equal, in color DC74 Off-White at 4-6 mil DFT on all exterior surfaces. Follow all manufacturer requirements. 4. Full Finish Coat: Apply one full finish coat of Tnemec Series 1095 Endura-Shield polyurethane, or approved equal, at 2.5-3.5 mils DFT on all exterior surfaces. Follow all manufacturer requirements. 5. The towers are equipped with a ladder and rail combination MSA dynaglide ladder safety system. The ladder safety system is hot dip galvanized, approximately 15 years old and in good condition. The contractor must only prepare and coat the ladder where it mounts to the tower. The Contractor must remove any paint that is mistakenly placed inside the fall arrestor channel, so it does not affect the performance of the system. 6. Remove rust at the conduit threads at the base of each tower. Coat with above coating system. 7. Measure thickness of coatings according to SSPC-PA 2. Take 4 sets of 3 individual readings per tower for each coat. Provide to the FAA copies of these results. 8. Apply new silane concrete sealer to existing exposed concrete foundation surfaces. 9. At the base of each tower is a bare #6 ground, partially in rigid conduit, that is clamped to a tower leg with a washer and structural bolt. Remove the #6 and associated rigid conduit to 1.5 below grade. Remove the existing bolt that was used to clamp the #6 and replace with an ASTM A325 bolted connection to include bolt, hardened washer, nut and palnut. Bolted connection must be hot dip galvanized. Contractor to verify dimensions on site. 10. Contractor must install a new hot dip galvanized 1/4 thick A36 steel plate in the middle of the platform on each tower. Plate dimension is approximately 2.5 x2.5 . The purpose of the steel plate is to cover an existing hole in the platform where a piece of equipment was removed. Redrill the existing six 3/8 bolt holes to and install new ASTM A325 bolted connection. Contractor must verify and review all dimensions with the FAA. Contractor must remove the existing 3 metal strips and six bolts that currently cover the platform opening. 11. The Contractor must review the provided as builts to ensure construction operations do not impact any existing equipment. The Contractor must protect the underground communication cables that travel from each tower to the stub ups at the building from heavy equipment. 12. The Contractor must be aware and plan for project phasing requirements that are listed below in the SOW. 13. Potential Additional Work (Contract Option #1): The Contractor must provide separate line-item pricing as part of their base bid proposal to coat the 200 hot dip galvanized steel lattice tower. Based on funding, this option may or may not be added to the contract.
Go deeper on this solicitation
FedSift reads the full solicitation package — every attachment — and pre-extracts
the compliance matrix, evaluation factors, key risks, win themes and
deal-breakers, each with a verbatim quote and the exact PDF page it came from. It
scores the opportunity against your company profile, tells you whether to bid as
prime or sub, and ranks teaming partners who could close your gaps.
Open the AI analysis in FedSift →
Free forever plan — no credit card.
Browse solicitations without an account; sign in for AI analysis and matching.
Other open solicitations in NAICS 238320
All NAICS 238320 solicitations →
More from TRANSPORTATION, DEPARTMENT OF
- Sources Sought for MT NP GLAC 14(5), Many Glacier Road LandslidesTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- ID ERFO FS 2022-1(1), Nez Perce-Clearwater Repairs 2022-1TRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Jacksonville Air Route Traffic Control Center (ARTCC) Chiller Repair ProjectTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Building refurbishment in Hutchinson, KS at the HTI ARSRTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Reattach Electrical Conduit, Denver Air Traffic Control Tower (DEN ATCT), 9800 Pe a Blvd, Denver, COTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Laboratory Analysis - Phase II Environmental Site Assessment - Fort DuPont, Delaware City, DETRANSPORTATION, DEPARTMENT OF · Due 15 September 2026
- Multi-Phase Study to Examine Long-Term Applicability and Transferability of Crash Modification Factors - Phase I: Feasibility Study and…TRANSPORTATION, DEPARTMENT OF · Due 15 September 2026
- Post-Construction Environmental Compliance Monitoring Services in support of MT FLAP BOR 2980(1) Sun River Bridge ReplacementTRANSPORTATION, DEPARTMENT OF · Due 15 September 2026
All TRANSPORTATION, DEPARTMENT OF solicitations →
Source: this notice on SAM.gov.
FedSift republishes public federal procurement data and is not affiliated with
the U.S. Government. Always confirm dates and requirements against SAM.gov
before responding.