FedSift Sign inSign up free

Solicitations › Department of Transportation › Federal Highway Administration

AZ BL COLO 7528(1) Burro Creek Road

Open — responses due 17 Nov 2026 (22 days left) · Small Business Set Aside - Total · Federal Highway Administration (FHWA), DOT · Kingman, AZ · NAICS 237310 · Solicitation 6982AF27B000002

Get the compliance matrix for this solicitation. Every requirement an offer must meet, each cited to the page it came from. Free, no account.

Build the compliance matrixor get the quick AI read of what is being bought and the deal-breakers

Solicitation details

Solicitation number6982AF27B000002
Notice ID07013cf162754b15ba4b0f1b7d02d803
AgencyDepartment of Transportation (DOT)
Sub-agencyFederal Highway Administration (FHWA)
Contracting office6982AF CENTRAL FEDERAL LANDS DIVISI
NAICS code237310 — Highway, Street, and Bridge Construction
Product / service code (PSC)Y1LB
Set-asideSmall Business Set Aside - Total
Notice typeSolicitation
Posted15 October 2026
Response deadline17 November 2026
Place of performanceKingman, AZ, USA
CompetitionCompetitive

Get the compliance matrix for this solicitation

FedSift reads every document in the package and lists every requirement an offer must meet — submission instructions, certifications, deadlines, hard gates — each cited to the page it came from. Free, no account.

Takes a few minutes for most packages — we can email it to you.

AI read of this solicitation

Before you spend a day on this package: FedSift reads every document and pulls out what is being bought, the deal-breakers and the key risks — each quoted from the page it came from. Free, no account needed. The result is shared, so the next reader gets it instantly. With a free account it also builds the full compliance matrix.

Description

PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles. SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats. Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project. Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement. PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement October 2026 Award-January - 2027 Construction January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000

Version history

SAM.gov has posted 3 notices under solicitation 6982AF27B000002, oldest first.

Documents in the solicitation package

7 files are attached to this notice.

Download all 7 files as one ZIP Free account, no credit card.

Build the compliance matrix from these 7 files

Every requirement, cited to the page it came from — free.

Or download them one at a time from SAM.gov.

Go deeper on this solicitation

FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.

Open the AI analysis in FedSift →

Free forever plan — no credit card. Browse solicitations without an account; sign in for AI analysis and matching.

Market context: DOT and NAICS 237310

About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.

DOT contracts under NAICS 237310 →

Other open solicitations in NAICS 237310

All NAICS 237310 solicitations →

More from Department of Transportation

All DOT solicitations →

Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.