Solicitations
› TRANSPORTATION, DEPARTMENT OF
› NAICS 541380
Sources Sought-Manual for Assessing Safety Hardware (MASH) testing- Steel-Backed Timber Roadway Barrier
TRANSPORTATION, DEPARTMENT OF · Solicitation 693JJ3-26-SS-0019 · NAICS 541380 · No Set aside used · Closed
This solicitation has closed.
Responses were due 31 August 2026.
The record stays published because closed procurements are what a recompete is
built from — the follow-on is typically solicited 6–18 months before the
incumbent contract ends. Open solicitations like this one are linked below.
Solicitation details
| Solicitation number | 693JJ3-26-SS-0019 |
|---|
| Notice ID | 0fa42a573d3746648f24b579765c1a54 |
|---|
| Agency | TRANSPORTATION, DEPARTMENT OF |
|---|
| Sub-tier | FEDERAL HIGHWAY ADMINISTRATION |
|---|
| Contracting office | 693JJ3 ACQUISITION AND GRANTS MGT |
|---|
| NAICS code | 541380 |
|---|
| Product / service code (PSC) | AS12 |
|---|
| Set-aside | No Set aside used |
|---|
| Notice type | Sources Sought |
|---|
| Posted | 20 August 2026 |
|---|
| Response deadline | 31 August 2026 (closed) |
|---|
| Place of performance | Washington, DC, USA |
|---|
Description
Potential Sources Sought. This is NOT a solicitation for quotes/submissions/proposals. Federal Highway Administration (FHWA) is conducting market research to identify potential sources for an anticipated requirement. The purpose of this notice is to obtain information, for planning purposes, regarding (1) the availability and capability of qualified sources to perform all or some of the work described below; and (2) the size classification of the available and capable sources relative to the North American Industry Classification System (NAICS) code for the proposed acquisition. This notice does not solicit quotations/proposals. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Additionally, the FHWA will not provide reimbursement for any information that may be submitted in response to this RFI/SS notice. Companies/Firms/Respondents are solely responsible for all expenses associated with responding to this RFI/SS notice. Responding to this RFI/SS notice will neither increase nor decrease the likelihood of being awarded any contract in the future by FHWA for the requisite services. Pursuant to 48 C.F.R., Part 10, the Government is conducting market research to: Determine what sources exist that can satisfy the Government s requirements listed below, Determine the capabilities of potential sources, Determine the size and status of potential sources, and Determine the level of competition (i.e. 8(a), set-aside, or full and open). The results of this RFI/SS notice will assist in identifying potential quoters having an interest in, and the resources to accomplish the work and contribute to determining the method of procurement. The FHWA is seeking a qualified Contractor that demonstrates the capabilities, experience, and resources required to perform crash testing on safety hardware devices. FHWA is transitioning to the latest crash test criteria for road safety hardware. This means transitioning from the National Cooperative Highway Research Program (NCHRP) Report 350 Recommended Procedures for the Safety Performance Evaluation of Highway Features to the American Association of State Highway Transportation Officials (AASHTO) Manual for Assessing Safety Hardware (MASH) methods. The goal of this effort is to make off- National Highway System (NHS) roads and highways as safe as possible, in part by accelerating the move to newer crash test criteria for Steel-Backed Timber roadway safety hardware devices. This project proposes to follow AASHTO 2016 MASH to crash test and document a Steel-Backed Timber roadway barrier, transition, and terminal common to the off- NHS system. This MASH testing will provide additional crashworthy alternative systems for local, federal, and tribal agencies and decrease occupant risk if they impact a device that meets current crash test standards. Upon completion of successful crash testing of the three safety hardware devices the FHWA will share the MASH test results and the standard details with the transportation community. NOTE: Please review attached detailed RFI/SS notice which includes instructions on how to submit questions and capability statements and each respective deadline. PLEASE do not post, upload, or submit questions or capability statements in response to this notice on SAM.gov. Questions and responses posted or submitted via SAM.gov may not be answered or considered.
Go deeper on this solicitation
FedSift reads the full solicitation package — every attachment — and pre-extracts
the compliance matrix, evaluation factors, key risks, win themes and
deal-breakers, each with a verbatim quote and the exact PDF page it came from. It
scores the opportunity against your company profile, tells you whether to bid as
prime or sub, and ranks teaming partners who could close your gaps.
Open the AI analysis in FedSift →
Free forever plan — no credit card.
Browse solicitations without an account; sign in for AI analysis and matching.
Other open solicitations in NAICS 541380
All NAICS 541380 solicitations →
More from TRANSPORTATION, DEPARTMENT OF
- Sources Sought for MT NP GLAC 14(5), Many Glacier Road LandslidesTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- ID ERFO FS 2022-1(1), Nez Perce-Clearwater Repairs 2022-1TRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Jacksonville Air Route Traffic Control Center (ARTCC) Chiller Repair ProjectTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Building refurbishment in Hutchinson, KS at the HTI ARSRTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Reattach Electrical Conduit, Denver Air Traffic Control Tower (DEN ATCT), 9800 Pe a Blvd, Denver, COTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Laboratory Analysis - Phase II Environmental Site Assessment - Fort DuPont, Delaware City, DETRANSPORTATION, DEPARTMENT OF · Due 15 September 2026
- Multi-Phase Study to Examine Long-Term Applicability and Transferability of Crash Modification Factors - Phase I: Feasibility Study and…TRANSPORTATION, DEPARTMENT OF · Due 15 September 2026
- Post-Construction Environmental Compliance Monitoring Services in support of MT FLAP BOR 2980(1) Sun River Bridge ReplacementTRANSPORTATION, DEPARTMENT OF · Due 15 September 2026
All TRANSPORTATION, DEPARTMENT OF solicitations →
Source: this notice on SAM.gov.
FedSift republishes public federal procurement data and is not affiliated with
the U.S. Government. Always confirm dates and requirements against SAM.gov
before responding.