FedSift

SolicitationsVETERANS AFFAIRS, DEPARTMENT OFNAICS 236220

Y1DA--NRM-CONST 630A4-20-412 Repair Parking Lots and Roads SA

VETERANS AFFAIRS, DEPARTMENT OF · Solicitation 36C24226B0014 · NAICS 236220 · Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) · Closed

Solicitation details

Solicitation number36C24226B0014
Notice ID233fd60ee694431cb8032a4ba300743a
AgencyVETERANS AFFAIRS, DEPARTMENT OF
Sub-tierVETERANS AFFAIRS, DEPARTMENT OF
Contracting office242-NETWORK CONTRACT OFFICE 02 (36C242)
NAICS code236220
Product / service code (PSC)Y1DA
Set-asideService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice typeSolicitation
Posted27 February 2026
Response deadline20 March 2026 (closed)
Place of performanceJamaica, NY, USA

Description

THIS AMENDMENT IS TO PROVIDE ANSWERS TO THE RFIS RECEIVED - NO FURTHER RFIS WILL BE ACCEPTED. The Department of Veterans Affairs (VA), NCO 2 St. Albans VA Medical Center, is seeking highly qualified construction firms to: repair parking lots and roads at the St. Albans VA Medical Center, 179-00 Linden Boulevard, Queens, NY 11424-1468 in accordance with the provided drawings and specifications. Specific Requirement: The Contractor shall furnish all labor, materials, tools, supervision, equipment, and safety necessary to perform the Connection site preparation. At a minimum, the following shall be performed: 1. The general contractor (GC) shall follow the Architect/Engineer 100% Issue for Construction (IFC) documents to construct and repair the parking lots and roads at SA. 2. The Contractor shall schedule all work with VA COR 3. The contractor shall provide all necessary labor and materials to prepare construction documents during the construction phase of the project. 4. All work shall conform to VA criteria and regulation 5. For construction details, please refer to ATTACHMENT 100% Construction Documents NARRATIVE and 100% Issue for Construction (IFC) as reference General Requirement: The Contractor shall furnish all labor, materials, tools, hardware, supervision, equipment, safety, drawing, rigging, permit, labelling, commissioning, and site visits necessary to perform the site preparation. At minimum, the following shall be performed: Refer to the following attachment for detailed project information and requirement, additional information can be found in VA Technical Information Library (TIL) https://www.cfm.va.gov/til/spec.asp#26: The Contractor shall furnish all labor, materials, tools, hardware, supervision, equipment, safety, drawing, rigging, permit, commissioning, site visit necessary to perform the site preparation. At a minimum, the following shall be performed: The Contractor shall take all necessary precautions and safety measures to protect all patients and end users from all related activities. The Contractor, along with the facility, shall jointly lock out/tag out electrical power boxes that supply power to the unit. The Contract shall provide and install all electrical and piping connections by certified technicians in their trades. The Contractor shall test and verify all work to ensure proper operation. The Contractor must have OSHA training and specialized OSHA training. In the performance of all work, the workers must be incompliance with safety regulations governing worker safety (OSHA: 29 CFR 1926 Safety and Health Regulations for Construction; NFPA, Life Safety Codes, etc.). All work shall be done in accordance with NFPA, Life Safety, VA Standards and Regulations, VA Policy and requirements, OSHA regulations, and manufacturer specifications. The Contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation and repair will provide the capacities and characteristics specified. The contractor shall guarantee that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects shall be repaired by the contractor at his own cost. The Contractor shall, within that period, correct all defects in materials/workmanship within twenty-four (24) hours of being notified. The Contractor shall inform the government of any manufacturer s warranty that will exceed the one-year warranty the Contractor offers. A document shall have at least the company, phone number, and the address where the government can obtain the manufacturer's information for an extended warranty. It is the responsibility of the contractor to verify all quantities, field conditions, and measurements prior to starting work. The contractor shall notify the CO/COR and VA Engineering Team of any differing site conditions prior to starting. The Contractor shall always provide an English-Speaking working supervisor on-site when work is being performed and for the duration of this project. A supervisor must have a minimum of five (5) years of experience as a supervisor on five (5) projects like this. The Contractor shall provide his own storage for materials. The VA is not responsible for loss of tools, materials, equipment, etc. The Contractor shall post visible required warning signs and barriers prior to beginning any work. The Contractor shall be responsible for any damage caused by his employees. All damages shall be repaired and/or replaced at no additional cost to the government. The Contractor shall be responsible for the proper and safe removal and disposal of all debris. Contractors shall be required to provide tipping reports for the weights of construction waste recycled and landfilled. VA Directive 0063 requires 50% of waste to be prevented or recycled. The Contractor shall perform cleanup at any time when the work area becomes cluttered and/or restricts traffic. At a minimum, the Contractor shall clean the work area at the end of each work shift. The C&A requirements do not apply, and a Security Accreditation Package is not required. The Contractor is responsible for completing the VA Privacy and Information Security Awareness training. Project Management Platform Requirement A. Construction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize the VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through the project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning, and Retro-Commissioning contracts. There is no user, license, or subscription fee for the contractor to use this cloud-based platform. B. The contractor shall accomplish and complete the following tasks upon award of the contract: 1. Request access to the ACC platform and Productivity NOW eLearning Site to project VA COR NLT 14 days from contract award. 2. Only staff who shall utilize the platform shall be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc. 3. The access request shall be in writing and include a list of staff. The list shall include the following information: Full Name Company Name Email Address Role/Position on the project (i.e., Project manager, site super) 4. Upon granting access, staff shall complete the required ACC training through the Productivity NOW platform within 12 Calendar days. 5. Upon successful completion of the training, the contractor shall submit certificates of completion to COR NLT 2 business days. C. Access to Productivity NOW eLearning will expire after 12 Calendar days after online access is granted. The contractor shall complete ACC training within that period. D. Additional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above E. The contractor shall only use the ACC platform for contract-required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in the contract amount provided for the contractor s failure to utilize the ACC platform as the project s official communication and collaboration system. Any correspondence outside the platform shall not be the governing authority's responsibility and will be at the contractor s expense. Official project correspondence and collaboration include, but are not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys. F. The contractor must inform the COR of any staff changes NLT 2 business days from the change. Staff changes apply to employees granted access to the ACC platform. The contractor shall request termination of access, replacement of personnel, and/or any other action that might impact the contractor s ability to maintain the required utilization of the platform. G. Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing the required ACC Platform training. All work shall conform to VA criteria and regulations and shall be performed by OSHA-certified personnel. The Contractor shall take all necessary precautions and safety measures to protect patients, visitors, and staff during all phases of construction. The Contractor shall coordinate all work activities with the VA Contracting Officer s Representative (COR) to minimize impact on operations and access. The Contractor shall test and verify all work to ensure proper operation, quality, and…

Go deeper on this solicitation

FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.

Open the AI analysis in FedSift →

Free forever plan — no credit card. Browse solicitations without an account; sign in for AI analysis and matching.

Other open solicitations in NAICS 236220

All NAICS 236220 solicitations →

More from VETERANS AFFAIRS, DEPARTMENT OF

All VETERANS AFFAIRS, DEPARTMENT OF solicitations →

Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.