Solicitations
› DEPT OF DEFENSE
› NAICS 238160
Mosquito Creek Lake Control Tower Roof Replacement
DEPT OF DEFENSE · Solicitation W911WN26Q1CBD · NAICS 238160 · Unrestricted (full and open) · Closed
This solicitation has closed.
Responses were due 12 August 2026.
The record stays published because closed procurements are what a recompete is
built from — the follow-on is typically solicited 6–18 months before the
incumbent contract ends. Open solicitations like this one are linked below.
Solicitation details
| Solicitation number | W911WN26Q1CBD |
|---|
| Notice ID | 31aae031120545cfb085cb7eeace2b6e |
|---|
| Agency | DEPT OF DEFENSE |
|---|
| Sub-tier | DEPT OF THE ARMY |
|---|
| Contracting office | W072 ENDIST PITTSBURGH |
|---|
| NAICS code | 238160 |
|---|
| Product / service code (PSC) | Y1QA |
|---|
| Set-aside | Unrestricted (full and open) |
|---|
| Notice type | Sources Sought |
|---|
| Posted | 06 August 2026 |
|---|
| Response deadline | 12 August 2026 (closed) |
|---|
| Place of performance | Cortland, OH, USA |
|---|
Description
SOURCES SOUGHT NOTICE Mosquito Creek Lake Structural Standing Seam Metal Roofing Replacement Agency: U.S. Army Corps of Engineers (USACE), Pittsburgh District Location: Mosquito Creek Lake, Cortland, OH NAICS Code: 238160 Roofing Contractors (Size Standard: $19.0 Million) Product Service Code (PSC): Y1QA Construction of Restoration of Real Property (Public or Private). Response Deadline: 12 August 2026, 5:00 P.M. E.T. Primary Point of Contact: Mario Taormina at Mario.Taormina@usace.army.mil and (412) 395-7256. 1. INTRODUCTION & DISCLAIMER This is a Sources Sought Notice for market research purposes only. This is not a solicitation, Request for Quote. No contract will be awarded from this announcement, and no reimbursement will be made for any costs associated with providing a response. The U.S. Army Corps of Engineers is seeking to identify qualified small businesses (including 8(a), HUBZone, Service-Disabled Veteran-Owned Small Businesses [SDVOSB], and Women-Owned Small Businesses [WOSB]) capable of performing the control tower roof replacement project described below. The results of this market research will be used to determine the appropriate acquisition strategy, including whether a small business set-aside is warranted. 2. PROJECT DESCRIPTION & SYNOPSIS This project consists of furnishing all necessary labor, materials, tools, supplies, and equipment for the complete replacement of the structural standing seam metal roofing system on the Control Tower Building (also known as the Operating House Building) located at Mosquito Creek Lake in Cortland, OH. The contractor will be required to complete all work within 365 calendar days after written Notice to Proceed (NTP). Major Technical Components of the Work: Demolition and Disposal: Complete removal and legal, off-site disposal of the existing standing seam metal roof panel system, box gutter, scuppers, and lightning protection system down to the original concrete roof slab. Structural Sub-Framing Refurbishment: Inspection of all existing light-gauge, cold-formed metal sub-framing. The contractor must replace up to 95 linear feet of framing members found to be rusted or deformed (defined as exhibiting visible deformation or corrosion resulting in a cross-sectional area loss of 25% or more). All remaining sub-framing must be cleaned of surface rust by wire-brushing and treated with an approved protective coating. Roof Deck Repair and Insulation: Repair, clean, and seal the existing concrete roof slab. The contractor must perform a 24-hour flood test to verify the watertightness of all repaired areas before insulation is applied. Following successful testing, a closed-cell spray polyurethane foam (ccSPF) insulation and moisture barrier system must be applied to the prepared roof deck to achieve a minimum thermal resistance value of R-30. The insulation must be protected from UV radiation and covered within 72 hours of application. New Standing Seam Metal Roof System: Design, furnish, and install a new, 22-gauge structural mechanically seamed, trapezoidal standing seam metal roof system with a high-performance 70% Polyvinylidene Fluoride (PVDF) finish. The new roof design will eliminate the existing box gutter, extending the roof area to cover the space previously occupied by it, and will incorporate new ridge and fascia ventilation, including a custom-fabricated, ventilated peak cap. Mechanical & Systems Rerouting: Rerouting the existing mechanical vent and exhaust pipes to penetrate through the masonry side wall of the tower instead of the roof deck. This includes core-drilling the masonry wall, complying with International Mechanical Code (IMC) clearances, repairing the masonry openings, and installing weatherproof vent hoods/wall caps with gravity backdraft dampers and insect/bird screens. It also includes installing a new gutter system along the bridge side of the building, and designing and installing a certified, UL-labeled Lightning Protection System (LPS) integrated with the new roof via non-penetrating attachments. 3. SPECIAL SITE CONDITIONS & CONSTRAINTS Prospective contractors should be aware of the following unique logistical constraints: Access: The Control Tower Building is a circa 1945 cylindrical masonry structure located in the reservoir on the upstream face of the dam. It is accessed via a 130' long by 10' wide service bridge extending from Ohio S.R. 305. Weight Limit: The service bridge has a strict 10-ton weight limit. Vehicles exceeding this limit will not be permitted on the bridge. Elevation: The roof of the building is approximately 22'-3" above the service bridge deck. Access to the roof is via portable ladder, and all hoisting operations (metal framing, roof panels, and peak compression ring) must be performed using cranes in accordance with an approved Lift Plan and USACE EM 385-1-1 safety regulations. 4. REQUESTED INFORMATION (SUBMISSION REQUIREMENTS) Interested parties who possess the capabilities and capacity to perform this work are requested to submit a response package. Please respond with the following: Section A: Corporate Information Company Name and Address. Point of Contact (Name, Title, Phone Number, and Email Address). Unique Entity Identifier (UEI) and CAGE Code. Active registration status in SAM.gov. Section B: Business Size & Socio-Economic Status Confirm your business size under NAICS Code 238160 (Roofing Contractors). Indicate if your firm belongs to any of the following socio-economic categories: Small Business (SB) 8(a) Certified Small Business HUBZone Small Business Service-Disabled Veteran-Owned Small Business (SDVOSB) Woman-Owned Small Business (WOSB) Section C: Technical Capabilities & Experience Confirm your company's ability to provide a certified applicator with a minimum of five (5) years of experience licensed by the metal roof system manufacturer. Confirm your capability to comply with USACE Safety and Health Requirements (EM 385-1-1), including providing a full-time, on-site Site Safety and Health Officer (SSHO) and, but not limited to, an accepted Accident Prevention Plan (APP) and Quality Control Plan (QCP). This is for awareness only. Please do not submit an APP, QCP, or related documents, but please confirm you can, or have, met this requirement. Section D: Past Performance Identify up to three (3) projects completed within the last five (5) years that are similar in size, scope, and complexity to this requirement. For each project, provide: Project Name and Location. Contracting Agency / Private Client (including a point of contact). Contract Value and Date of Completion. Brief Description of the Scope of Work performed, detailing your role as Prime or Subcontractor. 5. SUBMISSION INSTRUCTIONS Please submit your completed response package via email to Mario Taormina at Mario.Taormina@usace.army.mil no later than 5:00 P.M. E.T., 12 August 2026. Email Subject Line: "W911WN26Q1CBD, Sources Sought Response: Mosquito Lake Control Tower Roof Replacement All submissions will be treated as confidential market research and will not be shared outside of the Government project team
Go deeper on this solicitation
FedSift reads the full solicitation package — every attachment — and pre-extracts
the compliance matrix, evaluation factors, key risks, win themes and
deal-breakers, each with a verbatim quote and the exact PDF page it came from. It
scores the opportunity against your company profile, tells you whether to bid as
prime or sub, and ranks teaming partners who could close your gaps.
Open the AI analysis in FedSift →
Free forever plan — no credit card.
Browse solicitations without an account; sign in for AI analysis and matching.
Other open solicitations in NAICS 238160
- Building 333 - Roof RepairDEPT OF DEFENSE · Due 14 September 2026
- L&D 14 Old CSS Roof ReplacementDEPT OF DEFENSE · Due 14 September 2026
- Z--BOISE DISTRICT EQUIPMENT SHED ROOF REPAIRINTERIOR, DEPARTMENT OF THE · Due 14 September 2026
- Z--REPLACE ROOF SURFACES ON DEWA LOCATIONSINTERIOR, DEPARTMENT OF THE · Due 14 September 2026
- Repair Sunshades, MultiDEPT OF DEFENSE · Due 14 September 2026
- Building 122 Metal Roof Replacement, Prosser, WashingtonAGRICULTURE, DEPARTMENT OF · Due 14 September 2026
- Metal Roof InstallationAGRICULTURE, DEPARTMENT OF · Due 14 September 2026
- Shelter Roof Replacement, Buffumville Lake, Charlton, MADEPT OF DEFENSE · Due 14 September 2026
All NAICS 238160 solicitations →
More from DEPT OF DEFENSE
All DEPT OF DEFENSE solicitations →
Source: this notice on SAM.gov.
FedSift republishes public federal procurement data and is not affiliated with
the U.S. Government. Always confirm dates and requirements against SAM.gov
before responding.