Inactive on SAM.gov — responses were due 15 Aug 2026 · Unrestricted (full and open) · Department of the Army, DoD · Natick, MA · NAICS 332311 · Solicitation W912CH26B0010
Following NAICS 332311? Get new solicitations in it by email as they post — no account needed.
A newer version of this notice has been posted. SAM.gov republished solicitation W912CH26B0010 on 05 August 2026. This page is kept because it is a real record, but the current requirement, dates and attachments are on the latest version. Read the latest version →
What happened next
SAM.gov marked this notice inactive — responses were due 15 August 2026.
No award notice on SAM.gov yet. Not every award is posted there, so this does not mean it went unawarded.
Email me when the award is announced. One email, when SAM.gov posts the award notice. Not every award is posted there; if none appears within six months we'll tell you and stop. No account needed.
This one has closed. We'll email you when new NAICS 332311 (Prefabricated Metal Building and Component Manufacturing) solicitations post — the first email lists what is open right now, then at most once a week, only when something new posts. No account needed; unsubscribe in a click.
Description
The intent of this 5- year Requirements contract is to provide for the design and fabrication of the Lightweight Multi-Purpose Shelter (LMS) Type I, Type III which are designed for transport on the M1152A1 and the M1152A1 with B2 Armor Kit High Mobility Multi- Purpose Wheeled Vehicle (HMMWV). These shelters are transported by rail, air, marine and highway when mounted or dismounted from their vehicles. These tactical rigid wall shelters are used to house battlefield electrical systems. The LMS Type I and Type III are Electromagnetic Interference (EMI) shielded. The contractor shall supply all necessary personnel, facilities, equipment and materials to accomplish the requirements set forth herein. Each LMS, both First Article and Production, shall be equipped with one (1) Shelter to HMMWV Mounting Kit and one (1) Pintle Extension Kit which are separately boxed and stored inside the shelter. For production LMS, one (1) Technical Manual shall also be over-packed in each shelter with each end item delivered to the Government. Vehicle drawings and the vehicles themselves (M1152A1 Expanded Capacity Enhanced Integrated Armor Package (IAP)/Armor Ready HMMWV and M1152A1 with B2 Armor Kit Expanded Capacity Enhanced Armored HMMWV) will not be provided as Government Furnished Equipment (GFE) under this contract. It shall be the responsibility of the contractor to secure the use of sufficient vehicles and to mount the First Article Test Units on them prior to test and during validation of Technical Manual.
Version history
SAM.gov has posted 3 notices under solicitation W912CH26B0010, oldest first.
FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.
Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.