Fuel Station Pump Repair

Closed — responses were due 30 Oct 2026 · SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15) · Department of the Air Force, DoD · Scott Air Force Base, IL · NAICS 237120 · Solicitation FA440727RC001

Following NAICS 237120? Get new solicitations in it by email as they post — no account needed.

Email me new ones

What happened next

This solicitation has closed — responses were due 30 October 2026.

No award notice on SAM.gov yet. Not every award is posted there, so this does not mean it went unawarded.

Email me when the award is announced. One email, when SAM.gov posts the award notice. Not every award is posted there; if none appears within six months we'll tell you and stop. No account needed.

Solicitation details

Solicitation numberFA440727RC001
Notice ID58b9833dddb4475ba818344330d68a5c
AgencyDepartment of Defense (DoD)
Sub-agencyDepartment of the Air Force
Contracting officeFA4407 375 CONS LGC
NAICS code237120 — Oil and Gas Pipeline and Related Structures Construction
Product / service code (PSC)Z2NA
Set-asideSBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
Notice typeSources Sought
Posted28 October 2026
Response deadline30 October 2026 (closed)
Place of performanceScott Air Force Base, IL, USA
CompetitionCompetitive

Get new NAICS 237120 solicitations by email

This one has closed. We'll email you when new NAICS 237120 (Oil and Gas Pipeline and Related Structures Construction) solicitations post — the first email lists what is open right now, then at most once a week, only when something new posts. No account needed; unsubscribe in a click.

Description

The 375th Contracting Squadron is performing Market Research to identify potential SBA-certified Women-Owned Small Businesses (WOSB) under NAICS 237120 (Oil and Gas Pipeline and Related Structures Construction) with the qualifications, licenses, and technical capabilities to perform electrical conduit repair, drop tube replacement, and overfill alarm installation across designated fueling facilities at Scott Air Force Base, IL. Please contact MSgt Nolan Strange, nolan.strange.1@us.af.mil or Mr. Jody Noram, jody.noram.1@us.af.mil if you have any questions or concerns. DISCLAIMER: This Sources Sought is issued solely for information and planning purposes. It does not constitute a Request for Proposal (RFP), Invitation for Bid (IFB), or Request for Quotation (RFQ), nor does it guarantee a future solicitation will be issued. The Government will not reimburse respondents for any costs associated with preparing or submitting information in response to this notice. 3. Capability Statement Submittal Requirements Interested vendors possessing the required expertise, equipment, and certified personnel are invited to submit a Capabilities Statement (maximum 5 pages) addressing the following: Company Information: Company name, address, SAM Unique Entity Identifier (UEI), CAGE Code, Point of Contact (name, email, phone), and Socioeconomic status (e.g., 8(a), SDVOSB, WOSB, HUBZone, Small Business). Technical Capabilities & Experience: Summary of relevant past performance completed within the last three (3) years on underground storage tank (UST) fueling systems, conduit breakout/pour-back, overfill drop tube replacements, and Veeder-Root or automatic tank gauge (ATG) sensor/alarm installations. Licensing & Certifications: Confirmation that personnel hold required state/local UST service technician certifications, Veeder-Root certified installer/technician credentials, and applicable electrical licensing. Rough Order of Magnitude (ROM): Optional feedback on typical lead times, mobilization timeframes, and commercial pricing structure for tasks of this nature. PART 2: STATEMENT OF WORK (SOW) 1.0 Objective & Overview The Contractor shall furnish all necessary labor, supervision, materials, tools, equipment, testing apparatus, and transportation (except for specified Government/Owner-Furnished Equipment) to perform concrete breakout and conduit correction, electrical re-wiring, drop tube replacement, and overfill alarm installation across designated fueling facilities. 2.0 Detailed Scope of Work by Facility and Task TASK AREA 1: Premium Tank Sump Conduit Repair & Electrical Remediation The Contractor shall repair incorrectly poured conduit serving the Premium tank sump, complete necessary electrical re-pulls, and restore the concrete pad to original structural grade. Demolition & Concrete Breakout: Precision sawcut and breakout existing concrete around the Premium tank sump to expose the buried conduit line. Protect adjacent sump structures, lid seats, and underground utilities from collateral damage during breakout operations. Conduit Clearing & Realignment: Cut apart the obstructed/incorrect conduit run and clear out concrete or foreign debris resulting from the prior incorrect pour. Reconnect the conduit run using code-compliant, liquid-tight, fuel-resistant fittings and conduit rated for Class I, Division 1/2 hazardous fuel environments. Ensure proper pitch, sealing, and alignment. Electrical Wiring & Terminations: Pull new electrical conductors/wiring from the main building panel/control area to the tank sub-unit junction box in accordance with the National Electrical Code (NEC/NFPA 70). Terminate all wiring connections, verify seal-offs, and conduct comprehensive continuity, insulation resistance (megger), and operational tests to ensure proper equipment operation. Civil Restoration: Backfill excavated trench using suitable aggregate, compacted in uniform lifts to match surrounding base compaction specifications. Form and pour back high-early-strength concrete to match the existing grade, thickness, and finish of the fueling apron. TASK AREA 2: Facility 6047806 – Tank 3 Drop Tube Replacement The Contractor shall remove obsolete fill hardware and install a compliant drop tube assembly on Tank 3. Hardware Removal & Disposal: Remove the existing fill adapter, fill cap, and drop tube assembly. Safely load, manifest (if required), transport, and legally dispose of all obsolete components off-site in compliance with all local, state, and federal environmental regulations. Furnish & Install New Hardware: Furnish and install one (1) new OPW overfill prevention drop tube (or Government-approved equal), one (1) new fill adapter, and one (1) new heavy-duty locking cap. Special Technical Condition: Work assumes the existing drop tube is removable without structural failure and the existing spill container (spill bucket) remains sound and reusable. If the drop tube is seized or the spill bucket is found to be compromised/damaged, the Contractor shall immediately notify the Contracting Officer Representative (COR). Any required replacement of seized components or spill containers shall be evaluated and authorized via a formal bilateral change order prior to proceeding. Regulatory Compliance Verification: Set and verify that the drop tube shutoff mechanism operates at the exact level mandated by 40 CFR Part 280 / state UST regulations (e.g., 95% tank capacity shutoff or 90% flow restriction). Deliverables & Documentation: Document pre-work conditions, intermediate installation stages, and final configuration with high-resolution digital photographs. Submit photos and completed compliance checklist with the final job completion paperwork. TASK AREA 3: Facility 6047801 – Overfill Alarm Installation The Contractor shall remove the existing overfill alarm and install owner-provided Veeder-Root monitoring hardware. Demolition: Disconnect and remove the existing overfill alarm unit; transport and dispose of all removed scrap components off-site. Installation of Government/Owner-Furnished Equipment (GFE/OFE): The Government/Owner will provide: One (1) Veeder-Root Overfill Alarm (Part # 790091-001 / SKU: 790091-001) One (1) Veeder-Root Universal Sensor Mounting Kit (Part # 330020-012 / SKU: 330020-012) The Contractor shall furnish all certified labor, wiring, hardware, seals, and incidental consumables to properly mount, wire, and integrate the alarm with the existing automatic tank gauge (ATG) system. Testing & Commissioning: Perform functional operational checkout of the Veeder-Root alarm and sensor assembly to verify positive alarm annunciation and correct signal communication to the console. Deliverables & Documentation: Take detailed digital photographs of the completed installation, wiring junction, and console status screen indicating an operational, alarm-free condition. Submit completion paperwork and test verification logs to the COR. 3.0 Site Cleanup, Waste Management & Housekeeping Debris Haul-Off: The Contractor shall continuously maintain a clean and safe work zone. Upon completion of each task, the Contractor shall collect, load, haul off, and legally dispose of all concrete rubble, excavated soils, cut conduit, old wiring, discarded drop tubes, and packaging debris. Hazardous Materials: Any fuel-wetted materials or petroleum rags generated during servicing shall be managed and disposed of in accordance with applicable RCRA and local environmental standards. 4.0 Submittals and Deliverables Deliverable Site Safety Plan & AHAs Activity Hazard Analysis for sawcutting, confined spaces, and hazardous fuel zones Technician Certifications Veeder-Root certified technician & state UST licenses With quote / proposal submittal Drop Tube Compliance Verification Documented drop tube shutoff height calculation and verification sheet Photo Documentation Package Clear digital photos showing before, during, and after conditions for all tasks Disposal Manifests/Receipts Proof of lawful disposal for concrete and metallic/fuel-wetted scrap 5.0 Safety, Code Compliance & Working Conditions Safety Regulations: All work shall comply with OSHA 29 CFR 1910 and 1926 standards, NFPA 30 (Flammable and Combustible Liquids Code), NFPA 30A (Motor Fuel Dispensing Facilities), and NFPA 70 (National Electrical Code). Hot Work & Hazardous Locations: Sump areas represent Class I, Division 1/2 environments. The Contractor shall implement atmospheric monitoring (LEL meters) and obtain all required hot work permits before operating saws, cutting tools, or electrical equipment near open sumps.

Go deeper on this solicitation

FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.

Open the AI analysis in FedSift →

Free forever plan — no credit card. Browse solicitations without an account; sign in for AI analysis and matching.

Market context: DoD and NAICS 237120

About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.

  • In fiscal year 2026, DoD obligated $170.0M across 67 contract actions under NAICS 237120.
  • 67 contracts worth $846.3M in this category end within the next 18 months.

DoD contracts under NAICS 237120 →

Other open solicitations in NAICS 237120

All NAICS 237120 solicitations →

More from Department of Defense

All DoD solicitations →

Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.

FedSift turns SAM.gov and USASpending data into federal BD intelligence — smart matches, recompete radar, cited AI solicitation analysis and compliance matrices.

Source data: SAM.gov (solicitations) and USASpending.gov (awards), refreshed nightly. FedSift is not affiliated with the U.S. Government.

Pricing · Privacy · Terms · support@fedsift.app