26Z5AR6 - REPLACE INTERIOR FINISH

Inactive on SAM.gov — responses were due 1 Sep 2026 · Small Business Set Aside - Total · Federal Prison System / Bureau of Prisons (BOP), DOJ · Bastrop, TX · NAICS 236220 · Solicitation 15B50126PR000152

Following NAICS 236220? Get new solicitations in it by email as they post — no account needed.

Email me new ones

A newer version of this notice has been posted. SAM.gov republished solicitation 15B50126PR000152 on 01 September 2026. This page is kept because it is a real record, but the current requirement, dates and attachments are on the latest version. Read the latest version →

What happened next

SAM.gov marked this notice inactive — responses were due 01 September 2026.

No award notice on SAM.gov yet. Not every award is posted there, so this does not mean it went unawarded.

Email me when the award is announced. One email, when SAM.gov posts the award notice. Not every award is posted there; if none appears within six months we'll tell you and stop. No account needed.

Solicitation details

Solicitation number15B50126PR000152
Notice ID5d8fcb65a3394516a9fe8af98b14cc48
AgencyDepartment of Justice (DOJ)
Sub-agencyFederal Prison System / Bureau of Prisons (BOP)
Contracting officeFCI BASTROP
NAICS code236220 — Commercial and Institutional Building Construction
Product / service code (PSC)Y1AZ
Set-asideSmall Business Set Aside - Total
Notice typeSolicitation
Posted18 August 2026
Response deadline01 September 2026 (closed)
Place of performanceBastrop, TX, USA

Get new NAICS 236220 solicitations by email

This one has closed. We'll email you when new NAICS 236220 (Commercial and Institutional Building Construction) solicitations post — the first email lists what is open right now, then at most once a week, only when something new posts. No account needed; unsubscribe in a click.

Description

Statement of Work Federal Bureau of Prisons Federal Correctional Institution (FCI) Bastrop, Texas Project # 26Z5AR6 Replace Interior Finish 1. SPECIFICATIONS: A. INTRODUCTION The Federal Correctional Institution at Bastrop, located at 1341 Highway 95 North, Bastrop, TX 78602, has identified four (4) buildings with severe interior damage resulting from prolonged water intrusion caused by long-term roof leaks. The continued moisture exposure has resulted in deterioration of gypsum wall systems, ceiling assemblies, suspended ceiling systems, and wood paneling. These conditions may present unsanitary and potentially hazardous conditions, including the possible presence of microbial growth and other hazardous materials. Abatement is required to protect occupant health and prepare the spaces for future restoration. The Contractor is strongly encouraged to attend the pre-bid site visit identified in the solicitation, to assess existing conditions that may affect performance of contract work. *8/18/2026 - WAGE DETERMINATION FOR BASTROP COUNTY, TX HAS BEEN ADDED IN THE ATTACHMENTS SECTION. **There will be a site visit at FCI Bastrop, 1341 Highway 95 N, Bastrop, TX 77868 on Wednesday, August 26th at 1:00 PM CST. If you wish to attend, please email the points of contact in the solicitation and include background check paperwork for everyone wishing to enter available in the attachments section. Please do not digitally sign your name on the background check form, a physical wet signature is required. Background check paperwork is due on Thursday, August 20th at 1:00 PM CST. Please have a valid state of federal ID. B. SCOPE OF WORK Awarded Contractor shall furnish all labor, materials, equipment, supervision, and disposal necessary to abate, remove, and properly dispose of water-damaged interior finishes, including materials that may be impacted by hazardous or regulated substances, in accordance with this Statement of Work. C. CONTRACTOR S REQUIREMENTS 1. The Contractor will be required to comply with all applicable federal, state, and local laws and regulations, including OSHA, EPA, and BOP safety, health, and security requirements. 2. The Contractor shall coordinate work activities with FCI Bastrop staff and or Contracting Officer s Representative (COR). 3. The Contractor shall assume responsibility for identifying, controlling and properly handling hazardous materials encountered during the performance of this work, as specified herein. 4. Work shall be conducted in a manner that protects staff, inmates, visitors, and adjacent occupied spaces. C.1 Hazardous Material and Environmental Compliance C.1.1 General 1. Due to the age of the buildings and the duration of water intrusion, hazardous materials may be present, including but not limited to: - Mold or microbial contamination -Lead-based paint -Asbestos-Containing Materials (ACM) -Other regulated building materials. 2. The Contractor shall comply with all applicable requirements of OSHA, EPA and any other government regulatory agencies. C.1.2 Mold and Microbial Contamination 1. The contractor shall implement appropriate engineering controls, including containment and negative air pressure with HEPA filtration, when removing materials impacted by mold or suspected microbial growth. 2. Removal shall be performed to a point of clean, sound, and dry substrate. 3. Remaining surfaces shall be HEPA-vacuumed and cleaned in accordance with industry-recognized remediation practices. 4. The Contractor shall take reasonable measures to prevent cross-contamination during abatement. C.1.3 Lead-Based Paint 1. Due to the age of the buildings, painted surfaces disturbed during demolition may contain lead-based paint. 2. The Contractor shall perform work in accordance with applicable OSHA and EPA lead safety standards. 3. The Contractor shall implement appropriate worker protection and dust control measures. C.1.4 Asbestos-Containing Materials 1. The Government has conducted asbestos surveys of suspected building materials within the identified work areas. Testing was performed on materials reasonably suspected to contain asbestos, and the Government maintains documentation of all sampling results. 2. Based on testing performed to date, materials identified for removal under this Statement of Work are not known to contain asbestos. 3. If the Contractor encounters any material that differs from identified building material to be removed, the Contractor shall immediately stop work in the affected area and notify the COR prior to disturbing the material. 4. No material suspected of containing asbestos shall be disturbed, removed, or handled until the COR and FCI Bastrop Occupational Health & Safety Department staff have been consulted. 5. Failure to consult with the COR prior to disturbing questionable material may result in liability for unauthorized disturbance of regulated materials. C.2 CONTAINMENT AND PROTECTION 1. The Contractor shall provide dust, debris, and hazard containment using polyethylene barriers, negative air machines, and HEPA filtration as required. 2. Adjacent occupied spaces, mechanical systems, and finishes shall be protected from contamination. 3. The contractor shall always maintain safe and secure egress routes. C.3 ABATEMENT AND DEMOLIITION REQUIREMENTS 1. Gypsum Wallboard a. Remove and dispose of approximately 23,500 square feet of -inch wallboard damaged by water intrusion and potential microbial contamination. 2. Gypsum Ceilings a. Remove and dispose of approximately 5,500 square feet of gypsum ceiling systems, including associated framing and insulation where damaged. 3. Suspended Ceilings a. Remove and dispose of approximately 1,100 square feet of suspended ceiling systems, including tiles, grid, hangers, and supports impacted by moisture. 4. Wood Paneling a. Remove and dispose of approximately 1,200 square feet of water-damaged wood paneling, including furring strips and fasteners. C.3.1 REFERENCE DRAWINGS Attached reference drawings are provided for work requirements and the Contractor s benefit. The Contractor is encouraged to visit the project work site prior to submitting a bid to confirm existing conditions and measurements of the demolition areas. ATTACHMENT A - LOCATION PLAN ATTACHMENT B CHAPEL BUILDING 400 ATTACHMENT C PYSCHOLOGY BUILDING 500 ATTACHMENT D EDUCATION BUILDING 600 ATTACHMENT E LAUNDRY BUILDING 900 C.4 WASTE HANDLING AND DISPOSAL 1. All waste materials, including potentially contaminated debris, shall be bagged, sealed, labeled, and transported in accordance with applicable regulations. 2. Disposal shall be performed at approved facilities. 3. Waste disposal manifest shall be provided to the COR upon request. C.2 FINAL CLEANING 1. Perform final HEPA cleaning of all work areas. 2. Remove containment systems only after COR approval. 3. Leave all spaces clean and ready for restoration work. D. UTILITIES The FBOP will provide water and minimal electricity service (120V) but may not be in close proximity to the work site for small hand power tools including battery chargers. The contractor will provide all other equipment, supplies and materials needed to complete this project. E. ACCEPTANCE AND CLOSEOUT The Contractor shall notify the Contracting Officers Representative (COR) two (2) working days prior to the final testing and/or certification so that arrangements can be made to have BOP required staff available to observe inspection. A complete plan detailing any required testing procedures must be submitted in advance for final check out and testing of work. F. WARRANTY The Contractor warrants that work performed under this contact conforms to workmanship performed by the contractor or any subcontractor or supplier at any time. F. HOUSEKEEPING AND MATERIAL DISPOSAL The Contractor will be responsible for ensuring the premises are always kept clean and free from accumulations of waste materials and rubbish. The contractor will remove all debris, scrap, and rubbish from the work area daily. Surplus materials and all equipment shall be promptly removed from the site upon completion of the work. The Contractor shall be responsible to remove all debris and waste materials from the job site at FCI Bastrop site upon conclusion and acceptance of the project. These items must be disposed of in accordance with all Federal, State, and local laws. G. SUBMITTALS 1. The contractor shall provide written submittals to the COR describing recommended equipment within (15) days from receiving the notice to proceed, for approval. 2. All security clearance paperwork/documentation shall be submitted to the COR a minimum of (14) working days prior to the start of work. 3. The Contractor shall prepare and provide to the COR for approval, PDF file specifications of all material and products prior to their use. Submittals will be prepared as PDF package and transmit to Government by sending via email. Contractor should also provide three (3) copies of the Safety Data Sheets (SDS) on…

Version history

SAM.gov has posted 11 notices under solicitation 15B50126PR000152, oldest first.

Documents in the solicitation package

4 files are attached to this notice.

  • Wage Determinations Bastrop County TX.pdf
  • 15B50126Q00000014 Replace Interior Finish.pdf
  • BAS SOW 26Z5AR6 Replace Interior Finish.pdf
  • Criminal History Check Form.pdf

Download all 4 files as one ZIPFree account, no credit card.

Reading them for requirements? FedSift turns the package into a compliance matrix — every requirement with the page it came from, exportable to Excel.

Or download them one at a time from SAM.gov.

Go deeper on this solicitation

FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.

Open the AI analysis in FedSift →

Free forever plan — no credit card. Browse solicitations without an account; sign in for AI analysis and matching.

Market context: DOJ and NAICS 236220

About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.

  • In fiscal year 2026, DOJ obligated $132.1M across 92 contract actions under NAICS 236220.
  • 48 contracts worth $761.8M in this category end within the next 18 months.

DOJ contracts under NAICS 236220 →

Other open solicitations in NAICS 236220

All NAICS 236220 solicitations →

More from Department of Justice

All DOJ solicitations →

Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.

FedSift turns SAM.gov and USASpending data into federal BD intelligence — smart matches, recompete radar, cited AI solicitation analysis and compliance matrices.

Source data: SAM.gov (solicitations) and USASpending.gov (awards), refreshed nightly. FedSift is not affiliated with the U.S. Government.

Pricing · Privacy · Terms · support@fedsift.app