Small Business Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP)
Open — no response deadline stated · Small Business Set Aside - Total · Department of the Army, DoD · NAICS 237990 · Solicitation PANNWD26P0000030936
Get the AI read before you spend a day on this package. FedSift pulls out the deal-breakers and key risks, each quoted from the document. Free, no account.
Before you spend a day on this package: FedSift reads every document and pulls out what is being bought, the deal-breakers and the key risks — each quoted from the page it came from. Free, no account needed. The result is shared, so the next reader gets it instantly. With a free account it also builds the full compliance matrix.
Track this solicitation
We'll email you if the response deadline moves, an amendment posts, or new documents are added. No account needed — one email, unsubscribe in a click.
Description
The U.S. Army Corps of Engineers, Kansas City District, anticipates issuing Request for Proposals No. W912DQ27RA004 for a total small-business set-aside Multiple Award Task Order Contract (MATOC) supporting the Missouri River Bank Stabilization and Navigation Project. The requirement includes the repair, modification, and construction of river-training structures, including dikes and revetments, through placement of quarry-run stone and excavation of notches. Work will be performed by floating plant along the Missouri River between River Miles 0-542. The scope of work includes, but is not limited to, the construction, modification, and repair of stone dikes and revetments; bank paving and hard points; revetment overlays; and excavation of notches. The work requires the capability of mobilizing, loading, and unloading barges from accessible quarries with graded stone along the Missouri River. Structures are located between the high banks of the Missouri River to include side channel chutes. All work to be performed will be completed by floating plant as no land access will be available. Stone is typically placed by way of track-hoe from a work barge. Contractor equipment shall be capable of accessing designated structures in water depths of four feet or greater.The Government anticipates awarding four (4) to five (5) firm-fixed-price indefinite-delivery, indefinite-quantity (IDIQ) contracts within the MATOC. The Government also anticipates awarding one concurrent seed task order within the MATOC pool. The MATOC will have a shared aggregate maximum capacity of $50,000,000 for all awards, consisting of a three-year base ordering period and two one-year option periods. The minimum guarantee is $2,500 for each awarded IDIQ contract.This acquisition is a total small-business set-aside under North American Industry Classification System (NAICS) code 237990, Other Heavy and Civil Engineering Construction. The applicable small-business size standard is $45 million.The solicitation is anticipated to be issued on or about January 2027. The solicitation will establish the proposal due date and time; the Government anticipates allowing approximately 30 calendar days for proposal submission. A bid guarantee is required with the seed task order proposal in an amount equal to 20 percent of the proposed seed task order price or $3,000,000, whichever is less. The successful seed task order awardee will be required to furnish performance and payment bonds, each in the amount of 100 percent of the seed task order award amount, before issuance of the Notice to Proceed. Currently, a Pre-Solicitation Conference is not scheduled. If the Government decides to hold a conference, this announcement will be amended accordingly.The solicitation will use a best-value tradeoff source-selection process. The Government intends to award without discussions but reserves the right to conduct discussions if determined necessary. The solicitation will identify the official posting location and the authorized electronic proposal-submission method. Electronic proposals will be submitted through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Portal. Offerors are responsible for establishing and maintaining the required PIEE access, including the Proposal Manager role, sufficiently in advance of the proposal due date.Notice is given that it has been determined a consolidation of contract requirements is necessary and justified for this action. The determination will be published with the solicitation.Offerors must maintain an active System for Award Management registration and current representations and certifications, as required by the solicitation and applicable regulations.Prospective offerors are responsible for monitoring the official posting location for amendments and other updates.Prospective offerors shall submit contracting and technical questions through ProjNet Bidder Inquiry. The solicitation will provide the Bidder Inquiry Key and establish the deadline for questions. The Government will address questions through formal solicitation procedures.
Version history
SAM.gov has posted 4 notices under solicitation PANNWD26P0000030936, oldest first.
FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.
Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.