Solicitations
› TRANSPORTATION, DEPARTMENT OF
› NAICS 238910
Demolition, Remediation and Restoration
TRANSPORTATION, DEPARTMENT OF · Solicitation 6913G626Q300035 · NAICS 238910 · Total Small Business Set-Aside (FAR 19.5) · Closed
This solicitation has closed.
Responses were due 25 June 2026.
The record stays published because closed procurements are what a recompete is
built from — the follow-on is typically solicited 6–18 months before the
incumbent contract ends. Open solicitations like this one are linked below.
Solicitation details
| Solicitation number | 6913G626Q300035 |
|---|
| Notice ID | 69d122b086664e2bbe71a5f9a6e6a6d4 |
|---|
| Agency | TRANSPORTATION, DEPARTMENT OF |
|---|
| Sub-tier | OFFICE OF THE SECRETARY |
|---|
| Contracting office | 6913G6 VOLPE NATL. TRANS. SYS CNTR |
|---|
| NAICS code | 238910 |
|---|
| Product / service code (PSC) | F999 |
|---|
| Set-aside | Total Small Business Set-Aside (FAR 19.5) |
|---|
| Notice type | Combined Synopsis/Solicitation |
|---|
| Posted | 23 June 2026 |
|---|
| Response deadline | 25 June 2026 (closed) |
|---|
| Place of performance | Chantilly, VA, USA |
|---|
Description
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at three facilities in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The sites requiring remediation for lead- and total petroleum hydrocarbon (TPH) -contaminated soils are listed below: BHM ASR Birmingham, AL (33.57378 , -86.75671 ) CXY LOM New Cumberland, PA (40.178196 , -77.005692 ) IADN NASEB Chantilly, VA (38.958736 , -77.43499 ) The FAA's ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facilities above based on prior research, known historic operations and practices, and required cleanup actions or previously identified sites.The Contractor shall conduct all work in accordance with Federal, State and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. Please note that the GFI Site Survey Report provided for the CXY site is for demolition activities. This document is provided because it contains soil sampling results for this site. There will be NO demolition or asbestos abatement required as part of this project. The removal quantities and depths in the Preliminary Assessment and/or Site Investigation and Site Survey reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for all sites including the identification of all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. The government will perform ALL confirmatory sampling required at the sites. Additionally, the work plan shall also identify any required permits needed to perform the work. Additional components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is shown below: Technical Approach Method and procedures for soil remediation, removal, disposal (all as required above in section 1.1), and restoration Identification of required work permits Site Safety Health Plan (SSHP) Risk Management Plan Identification of major risks Risk mitigation plan The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Preliminary Assessment/Site Investigation (PA/SI), Site Investigation (SI) and Site Survey activities completed in 2024 found the below sites showing contamination above either FAA action levels or EPA/State regulatory limits. Examples include lead-in-soil concentrations above the FAA s cleanup standard of 200 mg/kg (ppm) or the applicable state standard, or TPHs in soil above EPA or State regulatory limits. For each site, prior to mobilizing to the site for the remedial activities, waste characterization samples shall be collected. Once these samples are analyzed, the proper landfill and disposal approvals shall be obtained. For each site, contaminated soil and/or equipment shall not be left at the site overnight unless previous permission is obtained by the contractor. Any equipment or material left at the site must be secured by the contractor and is not the responsibility of the government. Adidtional details for requirement are found in the SOW.
Go deeper on this solicitation
FedSift reads the full solicitation package — every attachment — and pre-extracts
the compliance matrix, evaluation factors, key risks, win themes and
deal-breakers, each with a verbatim quote and the exact PDF page it came from. It
scores the opportunity against your company profile, tells you whether to bid as
prime or sub, and ranks teaming partners who could close your gaps.
Open the AI analysis in FedSift →
Free forever plan — no credit card.
Browse solicitations without an account; sign in for AI analysis and matching.
Other open solicitations in NAICS 238910
All NAICS 238910 solicitations →
More from TRANSPORTATION, DEPARTMENT OF
- Sources Sought for MT NP GLAC 14(5), Many Glacier Road LandslidesTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- ID ERFO FS 2022-1(1), Nez Perce-Clearwater Repairs 2022-1TRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Jacksonville Air Route Traffic Control Center (ARTCC) Chiller Repair ProjectTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Building refurbishment in Hutchinson, KS at the HTI ARSRTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Reattach Electrical Conduit, Denver Air Traffic Control Tower (DEN ATCT), 9800 Pe a Blvd, Denver, COTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Laboratory Analysis - Phase II Environmental Site Assessment - Fort DuPont, Delaware City, DETRANSPORTATION, DEPARTMENT OF · Due 15 September 2026
- Multi-Phase Study to Examine Long-Term Applicability and Transferability of Crash Modification Factors - Phase I: Feasibility Study and…TRANSPORTATION, DEPARTMENT OF · Due 15 September 2026
- Post-Construction Environmental Compliance Monitoring Services in support of MT FLAP BOR 2980(1) Sun River Bridge ReplacementTRANSPORTATION, DEPARTMENT OF · Due 15 September 2026
All TRANSPORTATION, DEPARTMENT OF solicitations →
Source: this notice on SAM.gov.
FedSift republishes public federal procurement data and is not affiliated with
the U.S. Government. Always confirm dates and requirements against SAM.gov
before responding.