5th Armored Brigade (5th AR BDE) Turf Replacement Fort Bliss, Texas.
Inactive on SAM.gov — responses were due 21 Aug 2026 · Small Business Set Aside - Total · Department of the Army, DoD · Fort Bliss, TX · NAICS 238990 · Solicitation W911SG26QA049
Following NAICS 238990? Get new solicitations in it by email as they post — no account needed.
A newer version of this notice has been posted. SAM.gov republished solicitation W911SG26QA049 on 14 August 2026. This page is kept because it is a real record, but the current requirement, dates and attachments are on the latest version. Read the latest version →
What happened next
SAM.gov marked this notice inactive — responses were due 21 August 2026.
No award notice on SAM.gov yet. Not every award is posted there, so this does not mean it went unawarded.
Email me when the award is announced. One email, when SAM.gov posts the award notice. Not every award is posted there; if none appears within six months we'll tell you and stop. No account needed.
This one has closed. We'll email you when new NAICS 238990 (All Other Specialty Trade Contractors) solicitations post — the first email lists what is open right now, then at most once a week, only when something new posts. No account needed; unsubscribe in a click.
Description
See attached PWS. The 5th AR BDE is seeking to replace the existing training area and worn turf at the Brigade Headquarters. The current facility is severely degraded and presents active safety hazards to Soldiers. This requirement will deliver a permanent, high-quality, and resilient artificial turf solution to eliminate these safety risks and provide a modernized physical training environment that directly supports Army readiness. The entire turf area forms a perfect rectangle with the following outer boundary dimensions: Length 84 ft., Width 102 ft. The 84-foot length of the field is divided into three distinct sections: a Western gap, a central lane area, and an Eastern gap. Starting from the Western edge, there is a 22 ft. (22') open green turf gap before the lane section begins. Adjacent to the Western gap is the main lane area, which spans a total of 50 ft. (50') across. Following the lane section, there is a 12 ft. (12') open green turf gap extending to the Eastern edge of the field. There will be exactly 6 white lines marked across the field. Each of these white lines measures approximately 82.5 feet (82' 6") long, running parallel to the width of the field. The 50-foot central section is divided evenly into 5 numbered lanes. Each of the 5 lanes is exactly 10 feet (10') wide. Each lane contains a number (1 through 5). The numbers are exactly 3 feet 6 inches (3' 6") tall/long and with a width of 1.5 feet. Each number is horizontally centered within its 10-foot-wide lane. The numbers are placed exactly 3 feet (3') away from the designated starting line. The 5th Armored Brigade Logo is positioned directly in the middle of the 5 lanes, perfectly centered within the 50 ft. lane section. It has a length of 15 ft. and a width of 7.5 ft. The primary, thick structural lines of the "A" shape are to be colored a deep Jet Black. The lower half of the "A" symbol must be filled with a Crimson Red; the remaining top half will be painted white. The borders of the symbol will be Hunter Green.
Version history
SAM.gov has posted 4 notices under solicitation W911SG26QA049, oldest first.
FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.
Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.