FedSift

Solicitations › Department of Veterans Affairs

4420--SPS Steam Water Heater (Equipment) - VAMC Chillicothe

Closed — responses were due 23 Sep 2026 · Small Business Set Aside - Total · Department of Veterans Affairs (VA) · Chillicothe, OH · NAICS 333415 · Solicitation 36C25026Q1040

Solicitation details

Solicitation number36C25026Q1040
Notice ID79b052a383134b7c8e3dc9c418e3bd13
AgencyDepartment of Veterans Affairs (VA)
Contracting office250-NETWORK CONTRACT OFFICE 10 (36C250)
NAICS code333415 — Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
Product / service code (PSC)4420
Set-asideSmall Business Set Aside - Total
Notice typeCombined Synopsis/Solicitation
Posted21 September 2026
Response deadline23 September 2026 (closed)
Place of performanceChillicothe, OH, USA

Description

The purpose of this amendment is to post questions received and provide the facilities responses. The response date and time remain unchanged. 1. DELIVERY / LEAD TIME SOW paragraph 4 requires all wetted parts to be 316 or 316L stainless steel on an ASME-stamped packaged unit. Manufacturers we have approached indicate this is a made-to-order build rather than a catalog item, with fabrication lead times that may exceed the 90-day period of performance stated in paragraph 11. Will the Government accept a quoted delivery beyond 90 days after receipt of order where the vendor identifies the lead time in its quotation, or should quoters plan to invoke the 14-day notification provision in paragraph 11 after award? The facility has indicated either is sufficient. Please submit the most accurate delivery schedule possible with your quote. 2. SCOPE OF "ALL WETTED PARTS" Please confirm whether the 316/316L stainless requirement extends to the heat exchanger tube bundle and circulating pump, or whether it applies to the vessel, connections and wetted piping with a copper-alloy tube bundle remaining acceptable. Several standard packaged units meet every other requirement in paragraph 4 but use a copper U-bend coil or bronze circulator. Tube-bundle must be stainless steel, as copper piping is not compatible with low conductivity water. 3. CONTROL VALVE CONFIGURATION Paragraph 4 requires 1/3-2/3 control valves. Please confirm whether the control valves are to be pneumatic, electronic, or vendor's choice, and whether any BAS/BMS interface or signal type is required at the control panel. Electronic controls. BAS interface functionality (integration is not within scope) would be preferable but not required. 4. SOLICITATION NUMBER IN THE DESCRIPTION The first paragraph of the attached OPPORTUNITIES-DESCRIPTION 02 document references "solicitation number 36C25026Q1034" and also refers to providing "a Reverse Osmosis system." The CLIN schedule, Statement of Work, title and submission instructions all reference 36C25026Q1040 and two packaged steam water heaters. Please confirm that 36C25026Q1040 is the correct solicitation number and that the Reverse Osmosis reference is not part of this requirement. Reverse Osmosis system is a different requirement and not associated with 36C25026Q1040, which is limited to the two packaged steam water heaters. Paragraph is hereby corrected to: The contractor shall include all labor, materials, equipment, and shipping to comply with all applicable federal, state, local laws and regulations, and VA regulations as required to provide two packaged steam water heaters as outline in the SOW/SCHEDULE.: 5. INSTALLATION SOW paragraph 3 states that equipment install and testing are not within the scope of this contract. Please confirm that the vendor's responsibility ends at delivery to the Building 23 Warehouse with cut sheets and O&M manuals furnished, and that no rigging, setting, startup or commissioning labor is to be priced. Correct, install and setup is not required. 6. PAST PERFORMANCE Please confirm the number of past performance references desired, the relevancy period, and whether commercial references are acceptable alongside federal references. Past performance can be reviewed via CPARS. There is no specific number of references required. 7. EXISTING EQUIPMENT If available, please provide the make and model of the existing end-of-life units being replaced, and any connection sizes or physical envelope constraints in the Sterile Processing mechanical space, so that quoted units can be confirmed as a fit. Current system is an electric tank-based water heater at end of life. New water heater is being installed parallel to existing prior to cut over. Physical constraints limited to passage through standard height (84 inch) double door.

Version history

SAM.gov has posted 2 notices under solicitation 36C25026Q1040, oldest first.

Documents in the solicitation package

4 files are attached to this notice.

Download them from SAM.gov, or open the solicitation in FedSift to read them with page-cited analysis.

Go deeper on this solicitation

FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.

Open the AI analysis in FedSift →

Free forever plan — no credit card. Browse solicitations without an account; sign in for AI analysis and matching.

Market context: VA and NAICS 333415

About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.

VA contracts under NAICS 333415 →

Other open solicitations in NAICS 333415

All NAICS 333415 solicitations →

More from Department of Veterans Affairs

All VA solicitations →

Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.