Solicitations › Department of Defense › Department of the Navy
16--BLADE PROPELLER, AI, IN REPAIR/MODIFICATION OF
Closed — responses were due 5 Oct 2026 · Unrestricted (full and open) · Department of the Navy, DoD · NAICS 336413 · Solicitation N0038326RNB43
This solicitation has closed.
Responses were due 05 October 2026.
The record stays published because closed procurements are what a recompete is
built from — the follow-on is typically solicited 6–18 months before the
incumbent contract ends. Open solicitations like this one are linked below.
Solicitation details
Description
CONTACT INFORMATION|4|N731.47|N00383|771-229-0615|ARIANNA.G.PILLA.CIV@US.NAVY.MIL| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Reports (combo)|Inspection site source final acceptance site source|TBD|N00383|TBD|TBD|TBD|TBD||||||||| Terms and conditions of BOA N0038322GZ901 apply. This contract/delivery order/purchase order/modification is issued by the Government when deposited in the mail, transmitted by facsimile or sent by any electronic commerce method, including email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to issue this contract/delivery order/purchase order/modification. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.2.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: BLADE PROPELLER, AI ;BLADE PROPELLER, AI 1610-016145786; NSN , ;73030 R826444-3; Part Number, Shall be performed IAW: BLADE PROPELLER, AI ;N/A; Publication (s). 1.2.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 1.3 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;HAMILTON SUNSTRAND CORPORATION; drawing number ( ;73030; ) ;R826444-3; , Revision ;LATEST; and all details and specifications referenced therein. 1.4 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: BLADE PROPELLER, AI ;R826444-3; P/N, ;1610-016145786; NSN, ;ALL AVAILABLE REPAIR MANUALS, DRAWINGS, AND SPECIFICATIONS.; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such…
Version history
SAM.gov has posted 2 notices under solicitation N0038326RNB43, oldest first.
Documents in the solicitation package
1 file is attached to this notice.
- See Solicitation N0038326RNB43
Download them from SAM.gov, or open the solicitation in FedSift to read them with page-cited analysis.
Go deeper on this solicitation
FedSift reads the full solicitation package — every attachment — and pre-extracts
the compliance matrix, evaluation factors, key risks, win themes and
deal-breakers, each with a verbatim quote and the exact PDF page it came from. It
scores the opportunity against your company profile, tells you whether to bid as
prime or sub, and ranks teaming partners who could close your gaps.
Open the AI analysis in FedSift →
Free forever plan — no credit card.
Browse solicitations without an account; sign in for AI analysis and matching.
Market context: DoD and NAICS 336413
About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.
- In fiscal year 2026, DoD obligated $8.8B across 30,396 contract actions under NAICS 336413.
- 7,625 contracts worth $31.4B in this category end within the next 18 months.
DoD contracts under NAICS 336413 →
Other open solicitations in NAICS 336413
- NSN 1560-01-143-8041, AIRCRAFT STRUCTURAL SUPPORT COMPONENT, WSDC: 05F, AIRCRAFT, STRATOLIFTER C/KCDoD · Due 06 October 2026
- NOM: BULKHEAD,AIRCRAFT PR: 7013232963, NSN: 1560-017279075: IAW P/N: 68A332002-2063 RFP: SPE4A527R0009DoD · Due 06 October 2026
- Housing, TransmissionDHS · Due 06 October 2026
- 1630012903442, WHEEL,LANDING GEAR , WSC 05A, HELICOPTER, CHINOOK, CH-47DoD · Due 06 October 2026
- 1660014869710; P/N 10-2140; HEATER PACKAGE,AIRCDoD · Due 06 October 2026
- Servovale, HydraulicDoD · Due 06 October 2026
- F-16 Wheel Assembly (Sources Sought)DoD · Due 06 October 2026
- AUFMENTER FUEL CONTROL_End_Item_F101_NSN_2915011482108JF_PN_7113M62G01-2DoD · Due 06 October 2026
All NAICS 336413 solicitations →
More from Department of Defense
All DoD solicitations →
Source: this notice on SAM.gov.
FedSift republishes public federal procurement data and is not affiliated with
the U.S. Government. Always confirm dates and requirements against SAM.gov
before responding.