Solicitations › Department of Defense › Department of the Navy
59--MOUNTING BASE,ELECT, IN REPAIR/MODIFICATION OF
Closed — responses were due 8 May 2026 · Unrestricted (full and open) · Department of the Navy, DoD · NAICS 332710 · Solicitation N0038325QD175
A newer version of this notice has been posted.
SAM.gov republished solicitation N0038325QD175 on
23 September 2026. This page is kept because it is a real record, but the current
requirement, dates and attachments are on the latest version.
Read the latest version →
This solicitation has closed.
Responses were due 08 May 2026.
The record stays published because closed procurements are what a recompete is
built from — the follow-on is typically solicited 6–18 months before the
incumbent contract ends. Open solicitations like this one are linked below.
Solicitation details
| Solicitation number | N0038325QD175 |
|---|
| Notice ID | 8b20cfc7f376482885d10c2bc921e7d5 |
|---|
| Agency | Department of Defense (DoD) |
|---|
| Sub-agency | Department of the Navy |
|---|
| Contracting office | NAVSUP WEAPON SYSTEMS SUPPORT |
|---|
| NAICS code | 332710 — Machine Shops |
|---|
| Product / service code (PSC) | 5975 |
|---|
| Set-aside | Unrestricted (full and open) |
|---|
| Notice type | Solicitation |
|---|
| Posted | 05 May 2026 |
|---|
| Response deadline | 08 May 2026 (closed) |
|---|
Description
CONTACT INFORMATION|4|N721.15|B1Z|215-697-6278|svitlana.shvets.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19| | | | | | | | | | | | | | | | | | | | WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|tbd| |tbd|tbd|tbd|tbd|tbd|tbd| | | | | | | | | NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1| | EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2| | | BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11| | | | | | | | | | | | ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13| | | | | | | | | | | | | | BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5| | | | | | BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1| | ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|336413|1250| | | | | | | | | | | NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2|DO-A7 |DO-A7| The proposal due date has been extended until 08 May 2026. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: ## 235_ days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##0000 per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: MOUNTING BASE,ELECT ;013980446; NSN , ;3244as100; Part Number, Shall be performed IAW: MOUNTING BASE,ELECT ;IAW latest publications and repair processes/procedures; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: MOUNTING BASE,ELECT ;3244AS100; P/N, ;5975013980446; NSN, ;iaw latest publications and repair processes/procedures; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall…
Version history
SAM.gov has posted 8 notices under solicitation N0038325QD175, oldest first.
Go deeper on this solicitation
FedSift reads the full solicitation package — every attachment — and pre-extracts
the compliance matrix, evaluation factors, key risks, win themes and
deal-breakers, each with a verbatim quote and the exact PDF page it came from. It
scores the opportunity against your company profile, tells you whether to bid as
prime or sub, and ranks teaming partners who could close your gaps.
Open the AI analysis in FedSift →
Free forever plan — no credit card.
Browse solicitations without an account; sign in for AI analysis and matching.
Market context: DoD and NAICS 332710
About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.
- In fiscal year 2026, DoD obligated $37.2M across 479 contract actions under NAICS 332710.
- 68 contracts worth $41.7M in this category end within the next 18 months.
DoD contracts under NAICS 332710 →
Other open solicitations in NAICS 332710
- NSN 4920-01-156-0965, TEST SET,BLADE FOLD HARNESS, WSDC: Z9N, AIRCRAFT, FA-18, A-D, E/F, G (GROWLER).DoD · Due 06 October 2026
- Leg, Elevating, per Drawing # 11580032, Revision D, for 81MM Mortar, for the Watervliet ArsenalDoD · Due 06 October 2026
- Advanced Payload Module Strongbacks, Upender, All Up Round + Cannister Upender and Other HardwareDoD · Due 07 October 2026
- PANEL, CONTROL, ELEDoD · Due 07 October 2026
- Leg, Elevating, per Drawing # 11580032, Revision D, for 81MM Mortar, for the Watervliet ArsenalDoD · Due 08 October 2026
- 59--CHASSIS ASSEMBLYDoD · Due 08 October 2026
- 49--ADAPTER ASSEMBLY,INTERDoD · Due 13 October 2026
- 48--DISK ASSEMBLYDoD · Due 13 October 2026
All NAICS 332710 solicitations →
More from Department of Defense
All DoD solicitations →
Source: this notice on SAM.gov.
FedSift republishes public federal procurement data and is not affiliated with
the U.S. Government. Always confirm dates and requirements against SAM.gov
before responding.