REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO
Open — responses due 2 Nov 2026 (3 days left) · Unrestricted (full and open) · Department of the Army, DoD · Wright Patterson AFB, OH · NAICS 236220 · Solicitation W912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFB
Get the AI read before you spend a day on this package. FedSift pulls out the deal-breakers and key risks, each quoted from the document. Free, no account.
A newer version of this notice has been posted.
SAM.gov republished solicitation W912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFB on
21 October 2026. This page is kept because it is a real record, but the current
requirement, dates and attachments are on the latest version.
Read the latest version →
Before you spend a day on this package: FedSift reads every document and pulls out
what is being bought, the deal-breakers and the key risks — each quoted from the page
it came from. Free, no account needed. The result is shared, so the next reader gets
it instantly. With a free account it also builds the full compliance matrix.
Reading the solicitation package…
this usually takes a few minutes. You can keep reading — it will appear here.
Track this solicitation
We'll email you if the response deadline moves, an amendment posts, or new documents are added. It closes 02 November 2026. No account needed — one email, unsubscribe in a click.
Description
***21 October 2026 Update: The responses due date is being revised to 02 Novemeber at 12:00 P.M. Eastern Time. REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WPAFB, OHIO Notice: This is a Request for Information (RFI) for market research and informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm s ability to submit a proposal should a formal solicitation be issued in the future. NAICS Code: 236220 Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) 1. PROJECT OVERVIEWS The U.S. Army Corps of Engineers (USACE), in support of the United States Air Force (USAF), is conducting market research to identify interested and qualified industry partners for the design and construction of several upcoming construction projects at Wright-Patterson Air Force Base (WPAFB), Ohio. PROJECT 1: RENOVATE NASIC MAIN CAMPUS, PHASE 1, F/10853 - This project is renovation of 170,000 SF of Sensitive and/or Special Access Program spaces. The work consists of the full renovation of F/10853 through reconfiguration and interior renovation to create a network of administrative functions. The work shall be done in accordance with Intelligence Community Directive 705 (ICD 705) criteria and standards. The interior demolition consists of removal of all architectural and mechanical, electrical, and plumbing (MEP) elements including floor, wall, and ceiling finishes. Work includes replacement of building systems, reconfiguration of interior partitions, life safety systems, roof replacement, and envelope modification. The roofing system will be replaced with an energy-compliant system. Penetrations will be added to the building for daylighting, and the exterior envelope will be modified on first floor locations for mechanical rooms. All piping and sprinklers that are part of the current fire protection system are to be replaced. All domestic water, storm, and sanitary piping will be replaced. Additionally, this project includes cybersecurity measures. A corridor bridge connecting F/10828 and F/10856 over an existing loading dock is to be constructed. Personnel will require swing space during the renovation of F/10853. Swing space will be provided through existing available spaces throughout the NASIC IPC campus or via a temporary facility. It is critical that the sequencing of repair work be considered so that available spaces are not overwhelmed. Estimated Acquisition Magnitude: Approximately $160,000,000 PROJECT 2: Advanced Materials Research Laboratory C2A - Construction of an approximately ~90,000 SF three-story laboratory and research facility, as well as the potential construction of a central utility plant for the Air Force Reach Labor Material and Manufacturing Directorate. New facility will consist of concrete, foundation, structural steel frame, masonry etc. Onsite gas boilers for heat and chilled water generation for cooling and lab processes. The interior shall consist of open inter-disciplinary collaboration labs with clean utilities, vibration isolation, precision HVAC and humidity controls, as well as fire protection/suppression, intrusion detections systems and medium voltage switchgear (i.e. 12,470 volts). Site work consists of utilities, sidewalks, parking, communications The new facility shall connect to existing facilities and demolitions of facility 20654. is part of this project. Estimated Acquisition Magnitude: Approximately $122,000,000 PROJECT 3: Compressor Research Facility Systems Modernization This project will modernize the Air Force Research Lab s (AFRL) Compressor Research Facility (CRF) by replacing legacy drive and power equipment with a new 30,000-horsepower Variable Frequency Drive system to support engine component testing. The effort will deliver a fully integrated system that improves reliability, control, maintainability, and long-term test capability. Work includes replacement of the existing drive system with a new 30,000-horsepower VFD with active front end, a new 30,000-horsepower brushless synchronous motor, a new primary transformer, medium-voltage switchgear, protective relaying, and all associated interconnecting cables, bus work, grounding, and terminations. The project also includes the demolition and removal of legacy electrical and mechanical equipment; upgrades to controls, monitoring interfaces, cooling and ventilation systems, and supporting electrical infrastructure; and any required structural, foundation, enclosure, or fire/life-safety modifications needed to install and operate the new equipment. Additional work will include system integration, testing, commissioning, performance verification, operator and maintainer training, and delivery of technical data, recommended spare parts, and warranty support. Estimated Acquisition Magnitude: $25,000,000 PROJECT 4: Consolidate/Demo F/31240 This project will decentralize Area A heating by replacing the aging high-temperature hot water (HTHW) system fed from Building F/31240, Line A, and Line D with standalone boiler plants serving 49 facilities. The project supports administrative, warehouse, laboratory, hangar, and dormitory buildings that require year-round hot water for heating, reheating, humidity control, and climate management. Work includes facility surveys, evaluation of mechanical room capacity and code compliance, and determination of any needed interior renovations or limited additions to support the new equipment. The project also includes demolition of Building F/31240 and its boiler equipment, removal of above-ground HTHW piping and supports, and capping and abandonment of below-grade piping in place. New high-efficiency boiler systems, pumps, controls, and related accessories will be installed at affected facilities, with evaluation of both natural gas-fired and electric options. Additional work includes mechanical room modifications, make-up water assemblies where needed, upgrades to electrical, fire alarm, fire suppression, and direct digital control systems, and site restoration including pavement repair, grass restoration, and backfill and seeding at the demolished plant site. Estimated Acquisition Magnitude: $66,500,000 PROJECT 5: Consolidate/Demo West Ramp This project will decentralize heating for the West Ramp area at Wright-Patterson Air Force Base by replacing the existing high-temperature hot water (HTHW) system from Building F/34019 with standalone boiler plants serving 15 surrounding facilities. The effort addresses aging and degraded infrastructure supporting administrative, laboratory, and active hangar facilities that require year-round hot water for comfort heating, reheating, humidity control, and climate management. The project includes surveying each facility to determine boiler locations, evaluating mechanical room walls for code compliance, and assessing whether mechanical room expansions, electrical upgrades, or system improvements are needed to support the new equipment. Work includes demolition and removal of Building F/34019 and its internal boiler equipment, along with demolition of the exterior emergency generator, tank, piping, and all above-ground HTHW piping, supports, and foundations. Below-grade piping will be capped and abandoned in place. Each affected facility will receive new high-efficiency boiler systems, distribution pumps, controls, and related accessories, with evaluation of both natural gas-fired and electric boiler options. The project also includes interior renovations to create or enclose mechanical room space in select buildings, installation of new gas mains and make-up water assemblies where required, upgrades to fire alarm, fire suppression, and direct digital control systems as needed, and site restoration including pavement patching and sod replacement at disturbed areas. Estimated Acquisition Magnitude: $14,000,000 PROJECT 6: Repair Dormitory Multi-Facility F/31212 & F/31213 This project repairs and modernizes Dormitories F/31212 and F/31213 at Wright-Patterson Air Force Base to improve living conditions, address aging building systems, and extend the service life of the facilities. Each three-story dormitory includes 76 dorm rooms and common living spaces, and both require comprehensive renovation because many systems and materials are at or near the end of their useful life. The effort focuses on sustainment repairs and…
Version history
SAM.gov has posted 4 notices under solicitation W912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFB, oldest first.
FedSift reads the full solicitation package — every attachment — and pre-extracts
the compliance matrix, evaluation factors, key risks, win themes and
deal-breakers, each with a verbatim quote and the exact PDF page it came from. It
scores the opportunity against your company profile, tells you whether to bid as
prime or sub, and ranks teaming partners who could close your gaps.
Source: this notice on SAM.gov.
FedSift republishes public federal procurement data and is not affiliated with