Solicitations › Department of Defense › Department of the Navy
59--NRP,CCA,MOTHERBOARD, IN REPAIR/MODIFICATION OF
Open — responses due 19 Oct 2026 (14 days left) · Unrestricted (full and open) · Department of the Navy, DoD · NAICS 332710 · Solicitation N0038326QNA90
Solicitation details
| Solicitation number | N0038326QNA90 |
|---|
| Notice ID | 9463e9c8810549b5906cda5f7430aba3 |
|---|
| Agency | Department of Defense (DoD) |
|---|
| Sub-agency | Department of the Navy |
|---|
| Contracting office | NAVSUP WEAPON SYSTEMS SUPPORT |
|---|
| NAICS code | 332710 — Machine Shops |
|---|
| Product / service code (PSC) | 5975 |
|---|
| Set-aside | Unrestricted (full and open) |
|---|
| Notice type | Solicitation |
|---|
| Posted | 18 September 2026 |
|---|
| Response deadline | 19 October 2026 |
|---|
Track this solicitation
We'll email you if the response deadline moves, an amendment posts, or new
documents are added. It closes 19 October 2026. No account needed — one email, unsubscribe in a click.
Description
CONTACT INFORMATION|4|N731.39|M3H|2156972644|marisa.l.tetkowski.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORTS (COMBO)|INSPECTION SITE SOURCE FINAL ACCEPTANCE SITE SOURCE|N/A|N00383|N/A|N/A|N/A|N/A||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 YEAR AFTER DATE OF DELIVERY|45 DAYS AFTER DISCOVERY OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document. 1.3 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer. 1.5 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by IPC/EIAJ-STD-001C paragraph 5.1.4. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS GENERAL REQUIREMENTS: The Contractor shall provide at the contractors facility the necessary repair labor, new and serviceable reworked repair parts, materials and test equipmentand arrange for outside services as required to return the equipment to a serviceable condition within the calendar day shop time as specified in the delivery schedule of the contract. SCOPE OF WORK FOR REPAIR: The scope of the work in the following subparagraphs are applicable to the latest configuration of the Government equipment.There shall be a 100% repair rate on all CLIN carcasses. Any carcass that cannot be repaired must have Defense Contract Mnagement Command (DCMC) Quality Assurance Representative(QAR) approval for disposal. Upon receipt of Government equipment the contractor shall perform incoming inspections, recording any shipping damage, and inventory components for completeness. Units with missing parts will not be inducted until missing partsare received or unless specifically authorized by the Procurment Contracting Officer (PCO). The contractor shall advise the PCO if any portion of the required servicing is a result of the furnishing by the contractor of articles that were defective in material and/or workmanship or otherwise not in conformance with the requirements of the contract under which such government equipment were originally furnished. In the event that the failed assembly is found to be beyond economical repair (BER), as defined in the contract, or in the event that the Government equipment is received with one or more subassemblies missing (FOR EXAMPLE: AS ARESULT OF CANNABALIZATION BY AN AIRCRAFT OPERATING SITE),the contractor shall promptly obtain confirmation of such findings from the cognizant DCMC QAR. and upon confirmation promptly notify the PCO for authority to scrap if BER and,if missing subassemblies, proceed IAW Missing on Induction (MOI).Units with missing parts will not be inducted until missing parts are received or unless specifically authorized by the PCO. All disassembly, repair and assembly of the Government equipment shall be IAW current engineering drawings and configuration specifications. All detail parts shall be inspected IAW the applicable repair specification and repaired or replaced as indicated. Replaced hardware shall be in accordance with the latest drawing revisions.The contractor shall provide and may use new or repaired/reworked parts which meet the requirements of the repair specification to restore the Government equipment in the delivery time specified in the contract. Repaired/reworked parts shall be used in lieu of new whenever possible as allowed by the applicable repair specification.Any repair of lower assemblies and/or detail parts not authorized by the by the applicable repair specification shall be submitted to the QAR for Government review and approval.Requests for repair approvals shall be accompanied by details of the repair and other applicable data such as tests which have been performed to validate the repair. Repaired Government equipment shall meet the inspection and acceptance test requirements of the applicable repair specifications. A contractor QA representative shall be required, in accordance with MIL-I-45208A, or ISO Quality standard equivalent, to witness repair,inspection, and acceptance tests Government representatives shall be notified of, and permitted to witnesssuch inspections at their discretion. The contractor shall submit repair procedures for Government approval prior to repair if those procedures deviate from the repair procedures detailed in the applicable repair specifications. Where the test specifications are found to be missing,inadequate,or behind in revision for a CLIN,the contractor shall develop and submit its own acceptance test procedures for Government approval to submission of the CLIN for Government acceptance. During the repair effort the contractor shall make no modifications to the CLIN that would prohibit future repair or require additional repair steps by other qualified sources. REPAIR PARTS: The contractor shall be responsible for identification, selection, ordering, and stocking of required piece parts to support all repairs. By definition," piece part" shall be any part or material listed in the applicable repair specification. TEST EQUIPMENT: The contractor will provide a laboratory facility equipped with instrumentation and testing capability for comprehensive functional testing of the equipment and detailed inspections of subassemblies and detailed parts. The contractor test equipment shall be designed to ensure repaired Government equipment function in full compliance with the requirementsof the applicable repair specification. All Government equipment's electrical performance and mechanical parameters shall be measured in accordance with the requirements of the applicable repair specification,with hard copy reports of all measurements available to the Government upon request. PUBLICATIONS: Navair manuals will not be provided to the contractor. DRAWINGS: Drawings will not be provided by the Government. The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The…
Version history
SAM.gov has posted 2 notices under solicitation N0038326QNA90, oldest first.
Documents in the solicitation package
1 file is attached to this notice.
- See Solicitation N0038326QNA90
Download them from SAM.gov, or open the solicitation in FedSift to read them with page-cited analysis.
Go deeper on this solicitation
FedSift reads the full solicitation package — every attachment — and pre-extracts
the compliance matrix, evaluation factors, key risks, win themes and
deal-breakers, each with a verbatim quote and the exact PDF page it came from. It
scores the opportunity against your company profile, tells you whether to bid as
prime or sub, and ranks teaming partners who could close your gaps.
Open the AI analysis in FedSift →
Free forever plan — no credit card.
Browse solicitations without an account; sign in for AI analysis and matching.
Market context: DoD and NAICS 332710
About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.
- In fiscal year 2026, DoD obligated $37.2M across 479 contract actions under NAICS 332710.
- 68 contracts worth $41.7M in this category end within the next 18 months.
DoD contracts under NAICS 332710 →
Other open solicitations in NAICS 332710
- NSN 4920-01-156-0965, TEST SET,BLADE FOLD HARNESS, WSDC: Z9N, AIRCRAFT, FA-18, A-D, E/F, G (GROWLER).DoD · Due 06 October 2026
- Leg, Elevating, per Drawing # 11580032, Revision D, for 81MM Mortar, for the Watervliet ArsenalDoD · Due 06 October 2026
- Advanced Payload Module Strongbacks, Upender, All Up Round + Cannister Upender and Other HardwareDoD · Due 07 October 2026
- PANEL, CONTROL, ELEDoD · Due 07 October 2026
- Leg, Elevating, per Drawing # 11580032, Revision D, for 81MM Mortar, for the Watervliet ArsenalDoD · Due 08 October 2026
- 59--CHASSIS ASSEMBLYDoD · Due 08 October 2026
- 49--ADAPTER ASSEMBLY,INTERDoD · Due 13 October 2026
- 48--DISK ASSEMBLYDoD · Due 13 October 2026
All NAICS 332710 solicitations →
More from Department of Defense
All DoD solicitations →
Source: this notice on SAM.gov.
FedSift republishes public federal procurement data and is not affiliated with
the U.S. Government. Always confirm dates and requirements against SAM.gov
before responding.