Solicitations
› ENERGY, DEPARTMENT OF
RPC Power Factor Correction Work Package 1 - Demolition
ENERGY, DEPARTMENT OF · Solicitation SLAC_RFP_367094 · No Set aside used · Closed
This solicitation has closed.
Responses were due 24 July 2026.
The record stays published because closed procurements are what a recompete is
built from — the follow-on is typically solicited 6–18 months before the
incumbent contract ends. Open solicitations like this one are linked below.
Solicitation details
| Solicitation number | SLAC_RFP_367094 |
|---|
| Notice ID | 99bbf7310e21477c91b960e33506e947 |
|---|
| Agency | ENERGY, DEPARTMENT OF |
|---|
| Sub-tier | ENERGY, DEPARTMENT OF |
|---|
| Contracting office | SLAC Natl Accel Lab -DOE Contractor |
|---|
| Set-aside | No Set aside used |
|---|
| Notice type | Sources Sought |
|---|
| Posted | 17 July 2026 |
|---|
| Response deadline | 24 July 2026 (closed) |
|---|
| Place of performance | Menlo Park, CA, USA |
|---|
Description
Introduction and Overview: The subcontractor must provide all labor, oversight, tools, materials, equipment, and services necessary to complete the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards. SLAC receives power at its Master Substation (MSS) from a PG&E 230kV transmission line via two 230kV/12.47kV stepdown transformers. SLAC identifies that its AC power system encounters power factor issues at the point of connection (POC) with PG&E, where the power factor strays outside the contractual range (0.97 lag to 0.99 lead). This deviation stems from various factors, including reactive power imbalances, capacitive or inductive loads, etc. Consequently, suboptimal power factor conditions can result in increased power losses, reduced system efficiency, and involve potential penalties imposed by PG&E. To address this challenge, SLAC plans to implement power factor correction measures through the installation of two switched power factor correction (PFC) systems one on 12.47 kV Bus-1 and another on 12.47kV Bus-2 at the Master Substation (MSS). These PFC units will dynamically improve reactive power flow, compensating for system reactive power demand, and maintaining the overall power factor within the required range. Enhancing power factor correction in this manner will optimize energy utilization, reduce system losses, and ensure continued compliance with PG&E contractual requirements. Purpose: Prior to the installation of the new power factor correction equipment, it is necessary to demolish existing buildings (B308 and B311) with equipment inside them to create adequate space within the MSS Yard. This Statement of Work outlines the scope for the demolition, disassembly, and removal of existing assets, including metal buildings B308 and B311, a non-operational synchronous condenser, and the associated electrical equipment and cabling and wiring serving the condenser. All identified buildings and equipment are located in the SLAC MSS Yard. THIS IS FOR SOURCES SOUGHT ONLY, DO NOT SUMBIT BIDS. While the draft RFP package has been included with this post, the RFP has not been released. Interested vendors should express their interest by sending their capabilities statement to Doreen Agbayani at doreena@slac.stanford.edu.
Go deeper on this solicitation
FedSift reads the full solicitation package — every attachment — and pre-extracts
the compliance matrix, evaluation factors, key risks, win themes and
deal-breakers, each with a verbatim quote and the exact PDF page it came from. It
scores the opportunity against your company profile, tells you whether to bid as
prime or sub, and ranks teaming partners who could close your gaps.
Open the AI analysis in FedSift →
Free forever plan — no credit card.
Browse solicitations without an account; sign in for AI analysis and matching.
More from ENERGY, DEPARTMENT OF
All ENERGY, DEPARTMENT OF solicitations →
Source: this notice on SAM.gov.
FedSift republishes public federal procurement data and is not affiliated with
the U.S. Government. Always confirm dates and requirements against SAM.gov
before responding.