Solicitations
› DEPT OF DEFENSE
› NAICS 332919
HOSE 1 1/4 HYD
DEPT OF DEFENSE · Solicitation N0010426QAB91 · NAICS 332919 · Total Small Business Set-Aside (FAR 19.5) · Closed
This solicitation has closed.
Responses were due 18 June 2026.
The record stays published because closed procurements are what a recompete is
built from — the follow-on is typically solicited 6–18 months before the
incumbent contract ends. Open solicitations like this one are linked below.
Solicitation details
| Solicitation number | N0010426QAB91 |
|---|
| Notice ID | 9b0c1c22095a450482731b664e327024 |
|---|
| Agency | DEPT OF DEFENSE |
|---|
| Sub-tier | DEPT OF THE NAVY |
|---|
| Contracting office | NAVSUP WEAPON SYSTEMS SUPPORT MECH |
|---|
| NAICS code | 332919 |
|---|
| Product / service code (PSC) | 4730 |
|---|
| Set-aside | Total Small Business Set-Aside (FAR 19.5) |
|---|
| Notice type | Solicitation |
|---|
| Posted | 03 June 2026 |
|---|
| Response deadline | 18 June 2026 (closed) |
|---|
Description
CONTACT INFORMATION|4|N97113|FE|771-229-0460|amanda.r.hayward.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| STOP-WORK ORDER (AUG 1989)|1|| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)|Inspection / Acceptance Point: Source|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|TBD|N/A|N/A|N/A|N/A| navsupwawf.wss.ftc@navy.mil| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| Note: These are shelf life items (Y UU). Please ensure your material can meet the requirement prior to quoting. Award will be based on award total, not individual line items. GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 IS REQUIRED. DELIVERY 90 DAYS. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture of the HOSE,M52X2,1220MM . 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Manufacturing and Design - The HOSE,M52X2,1220MM furnished under this contract/purchase order shall meet the material and physical requirements as specified ;PARKER HANNIFIN CUSTOM HOSE P/N: F787TCC96N-38-20-20-1220MM (HOSE 1220MM) MFG.PARKER HANNIFIN CAGE CODE (98441); SHELF-LIFE REQUIREMENT; . 3.2 Marking - Unless marking requirements are specified by a document or drawing cited in this solicitation all items delivered under this contract/purchase order shall be marked and identified in accordance with the applicable Military Standards and Specifications as follows: Mechanical Parts, Assemblies and Equipments - MIL-STD-130 Electrical and Electronic Parts - MIL-STD-1285, Method 1. Electrical and Electronic Parts and Assemblies not covered by MIL-STD-1285-use MIL-STD-130. Electronic Equipment - MIL-STD-454 Requirement Number 67. Electrical Equipment - MIL-P-15024/5 (SHIPS) 3.3 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.) 3.4 SHELF LIFE REQUIREMENT - The following is excerpts from DOD 4140.27-M Shelf Life Management Manual. This requirement is mandated by MIL-STD-129P and later and is required under the under the Preservation, Packing and Marking portion of this TDP. 2-12. 85 Percent SHELF-LIFE REMAINING REQUIREMENT APPLICABLE TO ACQUISITION/PROCUREMENT A. Acquisition/procurement documentation must specify that shelf-life items/material will have not less than 85 percent (allowing for rounding to whole months) of shelf-life remaining at time of receipt by the first Government activity. Any delivery from a contractor not having at least 85 percent shelf-life remaining must normally be considered non-conforming. Refer to Appendix E of this Manual to determine the amount of time that 85% equates to in terms of remaining shelf life for Type I or Type II shelf-life codes. B. In supporting imminent use or consumption, the 85% shelf-life remaining on receipt by first Government activity may be modified or adjusted as deemed prudent at the discretion of PMs and IMMs, when support alternative arrangements such as EC, PV, DVD or local purchase are effected. Use of support alternatives for shipment/delivery to storage facilities as stock will conform to the 85% rule. 2-13. CONTRACTOR MARKING. Shelf life items will be marked for identification and control. Markings, shown below the item identification data are required on all units, intermediate, and exterior packs or unpacked items, must be per MIL STD 129, MIL-STD-130, MIL STD 290 (FSC 9150 only), or FED STD 123, (references (m) through (p)) respectively, and will include the following: A. For Type I shelf life items: apply one, as appropriate; date manufactured, date cured (for elastomeric and rubber products only), date assembled, or date packed (subsistence only); and expiration date. B. For Type II shelf life items: apply one, as appropriate; date manufactured, date cured (for elastomeric and other rubber products only), date assembled, and date packed (subsistence only), and inspect/test date. C. For both Type I and Type II markings in subparagraphs A and B above: the date must be expressed by the numeric month and the last 2 digits of the calendar year; i.e., 06/95, with the day of that month being the last day. D. Different Dates on Identical Items. When two or more unit packs of identical items bear different dates of manufacture, dates of cure, dates of pack, or dates of assembly, the earliest date must be shown on the shipping container. E. For Type I drugs and biologicals: the expiration date only is required. The expiration date should be marked in accordance with FED-SPEC PPP C 186 (reference (q)). Manufacturer date must not be shown for medical items having expiration dates. F. For cure-dated items: shelf life markings on physical material are expressed by month or quarter and year designations (i.e., 11/2001,or 3Q2001). Shelf life periods end on the last day of the cited month or quarter. Appendix E SHELF LIFE CODES Required Number of Months/Quarters Remaining Upon Receipt by the first Government activity Type I Type II Months Quanters Shelf Life Period Non-Deteriorative 0 0 N/A N/A No Shelf-Life Applies (zero) (zero) 01 Month A N/A 25 DAYS N/A 02 Months B N/A 50 DAYS N/A 03 Months C 1 75 DAYS N/A 04 Months D N/A 3 1 05 Months E N/A 4 1 06 Months F 2 5 2 09 Months G 3 8 3 12 Months (1.00-Years) H 4 10 3 15 Months (1.25-Years) J N/A 13 4 18 Months (1.50-Years) K 5 15 5 21 Months (1.75-Years) L N/A 18 6 24 Months (2.00-Years) M 6 21 7 27 Months (2.25-Years) N N/A 23 8 30 Months (2.50-Years) P N/A 26 9 36 Months (3.00-Years) Q 7 31 10 48 Months (4.00-Years) R 8 41 14 60 Months (5.00-Years) S 9 51 17 72 Months (6.00-Years) I N/A 61 20 84 Months (7.00-Years) T N/A 71 24 96 Months (8.00-Years U N/A 82 27 Variable such as: V N/A 77, 113, 26, 38, 61 90, 132,216,228, etc. 184, 194 65, ETC. Months or any other ETC. Number of months not Specifically assigned. 120 Months (10-Years) W N/A 102 34 180 Months (15-Years) Y N/A 153 51 240 Months (20-Years) Z N/A 204 68 Shelf-Life Period Greater N/A X 85 percent 85 percent Than 60 Months for Type of number of number II Extendible Items months months 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit…
Go deeper on this solicitation
FedSift reads the full solicitation package — every attachment — and pre-extracts
the compliance matrix, evaluation factors, key risks, win themes and
deal-breakers, each with a verbatim quote and the exact PDF page it came from. It
scores the opportunity against your company profile, tells you whether to bid as
prime or sub, and ranks teaming partners who could close your gaps.
Open the AI analysis in FedSift →
Free forever plan — no credit card.
Browse solicitations without an account; sign in for AI analysis and matching.
Other open solicitations in NAICS 332919
- 42--NOZZLE,FIRE EQUIPMENTDEPT OF DEFENSE · Due 14 September 2026
- 42--NOZZLE,FIRE EQUIPMENTDEPT OF DEFENSE · Due 14 September 2026
- 48--VALVE,SAFETY RELIEFDEPT OF DEFENSE · Due 14 September 2026
- 47--COUPLING,PIPEDEPT OF DEFENSE · Due 14 September 2026
- 47--ELBOW,PIPEDEPT OF DEFENSE · Due 14 September 2026
- 47--ELBOW,PIPE TO TUBEDEPT OF DEFENSE · Due 14 September 2026
- 48--VALVE,LINEAR,DIRECT, IN REPAIR/MODIFICATION OFDEPT OF DEFENSE · Due 14 September 2026
- 47--CONNECTION,FLEXIBLEDEPT OF DEFENSE · Due 14 September 2026
All NAICS 332919 solicitations →
More from DEPT OF DEFENSE
All DEPT OF DEFENSE solicitations →
Source: this notice on SAM.gov.
FedSift republishes public federal procurement data and is not affiliated with
the U.S. Government. Always confirm dates and requirements against SAM.gov
before responding.