Solicitations
› TRANSPORTATION, DEPARTMENT OF
› NAICS 541511
Predicted Signal Phase and Timing for Blocked Crossing Mitigation Phase 1
TRANSPORTATION, DEPARTMENT OF · NAICS 541511 · No Set aside used · Closed
This solicitation has closed.
Responses were due 29 June 2026.
The record stays published because closed procurements are what a recompete is
built from — the follow-on is typically solicited 6–18 months before the
incumbent contract ends. Open solicitations like this one are linked below.
Solicitation details
| Notice ID | 9fcf9fc8a08d43f09d2a41d45190af5e |
|---|
| Agency | TRANSPORTATION, DEPARTMENT OF |
|---|
| Sub-tier | FEDERAL RAILROAD ADMINISTRATION |
|---|
| Contracting office | 693JJ6 FEDERAL RAILROAD ADMIN |
|---|
| NAICS code | 541511 |
|---|
| Product / service code (PSC) | AS11 |
|---|
| Set-aside | No Set aside used |
|---|
| Notice type | Special Notice |
|---|
| Posted | 10 June 2026 |
|---|
| Response deadline | 29 June 2026 (closed) |
|---|
| Place of performance | Cary, NC, USA |
|---|
Description
THIS IS A NOTICE OF INTENT (NOI) TO AWARD A SOLE SOURCE CONTRACT AND IS NOT A REQUEST FOR COMPETITIVE PROPOSALS. The Federal Railroad Administration (FRA) intends to award a sole?source, firm?fixed?price contract to Railinc Corporation to perform Predicted Signal Phase and Timing for Blocked Crossing Mitigation Phase 1. FRA s authority for this work is established under 49 USC 20108(a) and 49 CFR 1.88(b) and 1.89(f). This project is to support technology transfer of the FRA-developed C-V2X Predicted Signal Phase and Timing (SPaT) application. This will be accomplished through development and testing in a field operational environment with a US Class 1 railroad. Railroads are a vital component of the North American transportation network, yet at-grade crossings can present significant logistical challenges for local emergency services. Emergency response vehicles sometimes experience delays when crossings are encumbered by train movements. Currently, manual mitigation efforts exist; for example, Union Pacific Railroad (UPRR) maintains an agreement with the Harris County emergency call and dispatch center in Houston, TX, to indicate which local crossings are currently encumbered by trains. This information is then relayed via voice from dispatchers to drivers during dispatch, providing some situational awareness for route planning. To further reduce potential for vehicle delays, FRA R&D has developed a cloud-based application that can predict crossing encumbrances, including start times and durations. This centralized approach requires no additional wayside or roadside infrastructure and allows railroads to maintain strict control over data access. Making both current and predicted encumbrance data available will enable emergency responders to plan routes with less guesswork, leading to reduced response times and improved public safety. The primary goals of this phase 1 effort are to design, develop, test, and evaluate a cloud-based system that provides emergency communications centers (ECCs) with timely, predictive insight into grade crossing encumbrances. The solution will use rail data assets, operational integrations, and enterprise cloud infrastructure to minimize technical risk, accelerate deployment, and establish a scalable foundation for future expansion. Railinc Corp. is the only entity equipped to receive and process business competition sensitive data from US freight railroads to perform software-as-service functions. Railinc has standing data handling agreements with railroads and that will be necessary to complete the project. AUTHORITY This sole source action is conducted under the authority of FAR 6.302?1, implemented by 41 U.S.C. 3304(a)(1), Only One Responsible Source. No solicitation or request for quote is available. PERIOD OF PERFORMANCE The period of performance of the contract is 12 months from date of award. RESPONSE INSTRUCTIONS This Notice of Intent is not a request for competitive proposals; however, interested parties may submit a capability statement that clearly demonstrates the ability to perform the perform Predicted Signal Phase and Timing for Blocked Crossing Mitigation Phase 1without disruption, duplication of cost, or loss of program continuity. Capability statements must be received no later than 15 calendar days from the date of posting, by 2:00 PM Eastern Time. Oral communication will not be accepted. POINT OF CONTACT (POC) Akwasi Kankam Contract Specialist, Federal Railroad Administration Email: akwasi.kankam@dot.gov DISCLAIMER This Notice does not obligate the Government to award a contract or otherwise pay for information provided in response. No solicitation document exists.
Go deeper on this solicitation
FedSift reads the full solicitation package — every attachment — and pre-extracts
the compliance matrix, evaluation factors, key risks, win themes and
deal-breakers, each with a verbatim quote and the exact PDF page it came from. It
scores the opportunity against your company profile, tells you whether to bid as
prime or sub, and ranks teaming partners who could close your gaps.
Open the AI analysis in FedSift →
Free forever plan — no credit card.
Browse solicitations without an account; sign in for AI analysis and matching.
Other open solicitations in NAICS 541511
All NAICS 541511 solicitations →
More from TRANSPORTATION, DEPARTMENT OF
- Sources Sought for MT NP GLAC 14(5), Many Glacier Road LandslidesTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- ID ERFO FS 2022-1(1), Nez Perce-Clearwater Repairs 2022-1TRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Jacksonville Air Route Traffic Control Center (ARTCC) Chiller Repair ProjectTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Building refurbishment in Hutchinson, KS at the HTI ARSRTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Reattach Electrical Conduit, Denver Air Traffic Control Tower (DEN ATCT), 9800 Pe a Blvd, Denver, COTRANSPORTATION, DEPARTMENT OF · Due 14 September 2026
- Laboratory Analysis - Phase II Environmental Site Assessment - Fort DuPont, Delaware City, DETRANSPORTATION, DEPARTMENT OF · Due 15 September 2026
- Multi-Phase Study to Examine Long-Term Applicability and Transferability of Crash Modification Factors - Phase I: Feasibility Study and…TRANSPORTATION, DEPARTMENT OF · Due 15 September 2026
- Post-Construction Environmental Compliance Monitoring Services in support of MT FLAP BOR 2980(1) Sun River Bridge ReplacementTRANSPORTATION, DEPARTMENT OF · Due 15 September 2026
All TRANSPORTATION, DEPARTMENT OF solicitations →
Source: this notice on SAM.gov.
FedSift republishes public federal procurement data and is not affiliated with
the U.S. Government. Always confirm dates and requirements against SAM.gov
before responding.