Z1DA--NRM CONST - 528A7-18-707 - Replace Boiler Stack Rome CBOC

Open — responses due 2 Dec 2026 (10 days left) · Unrestricted (full and open) · Department of Veterans Affairs (VA) · NAICS 238220 · Solicitation 36C24227R0008

Get the compliance matrix for this solicitation. Every requirement an offer must meet, each cited to the page it came from. Free, no account.

Build the compliance matrixor get the quick AI read of what is being bought and the deal-breakers

Solicitation details

Solicitation number36C24227R0008
Notice IDa4209158195e4eaaa69a73f455b90ed4
AgencyDepartment of Veterans Affairs (VA)
Contracting office242-NETWORK CONTRACT OFFICE 02 (36C242)
NAICS code238220 — Plumbing, Heating, and Air-Conditioning Contractors
Product / service code (PSC)Z1DA
Set-asideUnrestricted (full and open)
Notice typeSolicitation
Posted20 November 2026
Response deadline02 December 2026
CompetitionCompetitive

Get the compliance matrix for this solicitation

FedSift reads every document in the package and lists every requirement an offer must meet — submission instructions, certifications, deadlines, hard gates — each cited to the page it came from. Free, no account.

Takes a few minutes for most packages — we can email it to you.

AI read of this solicitation

Before you spend a day on this package: FedSift reads every document and pulls out what is being bought, the deal-breakers and the key risks — each quoted from the page it came from. Free, no account needed. The result is shared, so the next reader gets it instantly. With a free account it also builds the full compliance matrix.

Track this solicitation

We'll email you if the response deadline moves, an amendment posts, or new documents are added. It closes 02 December 2026. No account needed — one email, unsubscribe in a click.

Description

CONTINUATION OF SF 30 BLOCK 14 AMENDMENT DESCRIPTION 0002 AGAINST SOLICITATION NO. 36C24227R0008 1. This amendment answers the following vendor questions: Number of boiler vents: On M-101 (Boiler and Generator Exhaust Plan, Phase II), the new wall penetration/chase is labeled with two 14" I.D. pipes and one 12" I.D. pipe. Keynote 2 calls for a single "new 14" boiler double walled insulated vent stack," and the cutover notes describe that one vent connecting to Boiler #1 and continuing to within two feet of Boiler #2's vent, so one common 14" vent appears to serve both boilers. The solicitation description, however, refers to "two new steel boiler exhaust stacks." Please confirm whether the work is: (a) one 14" double-wall vent common to Boiler #1 and Boiler #2, plus the 12" generator exhaust, or (b) two separate 14" double-wall vents (one per boiler), plus the 12" generator exhaust. If (a), please confirm what the second 14" pipe shown at the penetration represents. Answer: Confirming: it is (b) two separate 14" double-wall vents (one per boiler), plus the 12" generator exhaust. b) Draft control or stack fan: No stack fan, draft inducer, or boiler-outlet draft control appears on the drawings. Section 23 51 00 (paragraph 2.2, Boiler Outlet Dampers and Accessories) refers to automatic draft control specified in Section 23 09 11, but Section 23 09 11 is not included in the solicitation. Please confirm whether: (a) the new boiler vent is intended to operate on natural draft (no fan or draft control required), or (b) a mechanical draft fan and/or barometric or motorized draft control is expected. If so, please issue Section 23 09 11 or identify the required equipment and control sequence. Answer: Confirming: it is (a) the new boiler vent is intended to operate on natural draft (no fan or draft control required). c) Design heating load and operating water temperatures: Please provide the building design heating load (or recent gas and oil usage or meter data), and the normal heating-water supply and return temperatures for the two existing Fulton Vantage boilers. Return-water temperature sets the flue-gas temperature, which governs the vent sizing and draft calculation. Please also confirm whether the two boilers operate as lead/standby (N+1) or are both required at design load. Answer: Replacing the boiler is not part of the contract. Boilers have inducer fans. There is no stack fan or boiler draft controls to be installed. d) Facility designation: Please confirm whether the Rome CBOC is designated mission-critical under VA Physical Security and Resiliency Design requirements, or otherwise required to keep heating on during a utility outage, as this affects the vent design for both fuels. Answer: Rome CBOC is NOT designated as a Critical/Mission Critical facility. CBOCs are generally outpatient facilities rather than hospitals with inpatient, emergency, surgical, or continuity-of-government functions. Therefore, absent a specific VA risk assessment or designation, the Rome CBOC would not ordinarily be assumed to be mission critical. e) Fuel oil and emergency power: Boiler #2 fires #2 fuel oil as a backup fuel. Please confirm (a) whether the vent must be designed for oil firing on Boiler #2 (and on Boiler #1, if applicable), (b) the size and required reserve of the existing #2 oil tank, and (c) whether the boilers and their associated vent or draft equipment are served by emergency power through an automatic transfer switch. Answer: The specified vent material (AL-29-4C) is compatible for operating the boilers on natural gas or #2 oil. This contract does not include altering the existing fuel oil tank, day tank, the boilers, or the generator. We are eliminating the existing exhaust stack and installing a new exhaust stack in a different location to serve the two existing boilers and existing emergency generator. All other terms and conditions remain unchanged.

Version history

SAM.gov has posted 6 notices under solicitation 36C24227R0008, oldest first.

Documents in the solicitation package

10 files are attached to this notice.

  • 36C24227R0008 0002.docx
  • Site visit sign-in sheet.pdf
  • 36C24227R0008 0001.docx
  • 52.225-9 Buy American Certificate.pdf
  • WD Oneida 5-18-2026.docx
  • boilerspec 1.pdf
  • Final_Specification of Repair Boiler Stack 528A7-18-707.pdf
  • 528A7-18-707_Perforated Screen Drawing.pdf
  • 528A7-18-707_Final Bid Drawings.pdf
  • 36C24227R0008_2.docx

Download all 10 files as one ZIPFree account, no credit card.

Build the compliance matrix from these 10 files

Every requirement, cited to the page it came from — free.

Or download them one at a time from SAM.gov.

Go deeper on this solicitation

FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.

Open the AI analysis in FedSift →

Free forever plan — no credit card. Browse solicitations without an account; sign in for AI analysis and matching.

Market context: VA and NAICS 238220

About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.

  • In fiscal year 2026, VA obligated $311.9M across 692 contract actions under NAICS 238220.
  • 318 contracts worth $478.7M in this category end within the next 18 months.

VA contracts under NAICS 238220 →

Other open solicitations in NAICS 238220

All NAICS 238220 solicitations →

More from Department of Veterans Affairs

All VA solicitations →

Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.

FedSift turns SAM.gov and USASpending data into federal BD intelligence — smart matches, recompete radar, cited AI solicitation analysis and compliance matrices.

Source data: SAM.gov (solicitations) and USASpending.gov (awards), refreshed nightly. FedSift is not affiliated with the U.S. Government.

Pricing · Privacy · Terms · support@fedsift.app