61--CONTROLLER,ELECTRIC, IN REPAIR/MODIFICATION OF
Open — responses due 23 Nov 2026 (28 days left) · Unrestricted (full and open) · Department of the Navy, DoD · NAICS 335312 · Solicitation N0038327QPA04
Get the compliance matrix for this solicitation. Every requirement an offer must meet, each cited to the page it came from. Free, no account.
FedSift reads every document in the package and lists every requirement an
offer must meet — submission instructions, certifications, deadlines, hard gates — each
cited to the page it came from. Free, no account.
Takes a few minutes for most packages — we can email it to you.
Building the matrix…
Email me when it's ready — no account needed. You can close this page.
AI read of this solicitation
Before you spend a day on this package: FedSift reads every document and pulls out
what is being bought, the deal-breakers and the key risks — each quoted from the page
it came from. Free, no account needed. The result is shared, so the next reader gets
it instantly. With a free account it also builds the full compliance matrix.
Reading the solicitation package…
this usually takes a few minutes. You can keep reading — it will appear here.
Track this solicitation
We'll email you if the response deadline moves, an amendment posts, or new documents are added. It closes 23 November 2026. No account needed — one email, unsubscribe in a click.
Description
CONTACT INFORMATION|4|N762.44|P2C|(771)229-0524|bridget.m.murphy6.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and receiving report combo type|Source|TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 MONTHS|60 DAYS AFTER DISCOVREY OF DEFECT||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: #550 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.3.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: CONTROLLER,ELECTRIC ;6110-01-703-0671; NSN , ;2056AS4000-G05; Part Number, Shall be performed IAW: CONTROLLER,ELECTRIC ;REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS. LATEST DRAWING.; Publication (s). 1.3.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;2056AS4000-G05; drawing number ( ;30003; ) ;LATEST REVISION; , Revision ;NAWCAD LKE DRAWING PACKAGE.; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=PL2056AS1080 |30003| F| |D| | | | DRAWING DATA=PL2056AS1590 |30003| | |D| | | | DRAWING DATA=PL2056AS2040 |30003| A| |D| | | | DRAWING DATA=PL2056AS2080 |30003| B| |D| | | | DRAWING DATA=PL2056AS3000 |30003| H| |D| | | | DRAWING DATA=PL2056AS3010 |30003| H| |D| | | | DRAWING DATA=PL2056AS3020 |30003| H| |D| | | | DRAWING DATA=PL2056AS3030 |30003| L| |D| | | | DRAWING DATA=PL2056AS3110 |30003| | |D| | | | DRAWING DATA=PL2056AS3200 |30003| E| |D| | | | DRAWING DATA=PL2056AS3210 |30003| C| |D| | | | DRAWING DATA=PL2056AS3220 |30003| A| |D| | | | DRAWING DATA=PL2056AS3240 |30003| B| |D| | | | DRAWING DATA=PL2056AS3260 |30003| A| |D| | | | DRAWING DATA=PL2056AS3270 |30003| | |D| | | | DRAWING DATA=PL2056AS3320 |30003| A| |D| | | | DRAWING DATA=PL2056AS3340 |30003| B| |D| | | | DRAWING DATA=PL2056AS4000 |30003|AB| |D| | | | DRAWING DATA=PL2056AS4001 |30003| A| |D| | | | DRAWING DATA=PL2056AS4010 |30003|AC| |D| | | | DRAWING DATA=PL2056AS4020 |30003| F| |D| | | | DRAWING DATA=2056AS1080-G01 |30003| F| |D| | | | DRAWING DATA=2056AS1130 |30003| M| |D| | | | DRAWING DATA=2056AS1210-G01 |30003| A| |D| | | | DRAWING DATA=2056AS1220-G01 |30003| E| |D| | | | DRAWING DATA=2056AS1240 |30003| J| |D| | | | DRAWING DATA=2056AS1250-G01 |30003| A| |D| | | | DRAWING DATA=2056AS1501 |30003| L| |D| | | | DRAWING DATA=2056AS1590-H01 |30003| | |D| | | | DRAWING DATA=2056AS1920-G01 |30003| C| |D| | | | DRAWING DATA=2056AS2040-G01 |30003| A| |D| | | | DRAWING DATA=2056AS2080-G01 |30003| B| |D| | | | DRAWING DATA=2056AS3000-G01 |30003| H| |D| | | | DRAWING DATA=2056AS3010-G01 |30003| H| |D| | | | DRAWING DATA=2056AS3020-G01 |30003| H| |D| | | | DRAWING DATA=2056AS3030-G01 |30003| L| |D| | | | DRAWING DATA=2056AS3040 |30003| A| |D| | | | DRAWING DATA=2056AS3060 |30003| C| |D| | | | DRAWING DATA=2056AS3100-H01 |30003| G| |D| | | | DRAWING DATA=2056AS3110-H01 |30003| | |D| | | | DRAWING DATA=2056AS3200-G01 |30003| E| |D| | | | DRAWING DATA=2056AS3210-G01 |30003| C| |D| | | | DRAWING…
Version history
SAM.gov has posted 2 notices under solicitation N0038327QPA04, oldest first.
FedSift reads the full solicitation package — every attachment — and pre-extracts
the compliance matrix, evaluation factors, key risks, win themes and
deal-breakers, each with a verbatim quote and the exact PDF page it came from. It
scores the opportunity against your company profile, tells you whether to bid as
prime or sub, and ranks teaming partners who could close your gaps.
Source: this notice on SAM.gov.
FedSift republishes public federal procurement data and is not affiliated with
the U.S. Government. Always confirm dates and requirements against SAM.gov
before responding.