Notice of Sole Source-OBR Cooling Towers

Inactive on SAM.gov — responses were due 18 Aug 2026 · Unrestricted (full and open) · Department of the Army, DoD · Fort Huachuca, AZ · NAICS 238220

Following NAICS 238220? Get new solicitations in it by email as they post — no account needed.

Email me new ones

What happened next

SAM.gov marked this notice inactive — responses were due 18 August 2026.

No award notice on SAM.gov yet. Not every award is posted there, so this does not mean it went unawarded.

Email me when the award is announced. One email, when SAM.gov posts the award notice. Not every award is posted there; if none appears within six months we'll tell you and stop. No account needed.

Solicitation details

Notice IDb9c4ce339d134fbc8630f83a77dc3dfd
AgencyDepartment of Defense (DoD)
Sub-agencyDepartment of the Army
Contracting officeACC-APG
NAICS code238220 — Plumbing, Heating, and Air-Conditioning Contractors
Set-asideUnrestricted (full and open)
Notice typeSpecial Notice
Posted13 August 2026
Response deadline18 August 2026 (closed)
Place of performanceFort Huachuca, AZ, USA

Get new NAICS 238220 solicitations by email

This one has closed. We'll email you when new NAICS 238220 (Plumbing, Heating, and Air-Conditioning Contractors) solicitations post — the first email lists what is open right now, then at most once a week, only when something new posts. No account needed; unsubscribe in a click.

Description

NOTICE OF INTENET TO AWARD SOLE SOURCE Cooling Tower Refurbishment and Replacement Electronic Proving Ground Facility The Army Contracting Command-Aberdeen Proving Ground (ACC-APG), Fort Huachuca Division intends to award a sole-source contract under the authority 10 U.S.C. 3204(a)(1) and RFO FAR 6.103-1 - Only one responsible source and no other supplies or services will satisfy agency requirements to OBR Cooling Towers located at 3102 S 44th St, Phoenix, Arizona 85040. The requirement is for commercial fill replacement and service of two (2) cooling towers and replacement of tower a BAC tower and piping. The objective of this project is twofold: one cooling tower is improperly matched to the test chamber it supports, leading to contamination that actively damages vital tests, while three other towers are over 20 years old and have surpassed their optional service life. This creates a significant shortfall, as the current infrastructure cannot reliably of 11 climatic and dynamic test systems, and the tower for the RDT building is similarly past its service jeopardizing 4 agree systems. A failure of any of these cooling systems will cause an immediate shutdown of the associated test chambers, resulting in mission failure and significant downtime. meet the cooling demand required for testing. The tower removes and replaces the delta cooling tower and replace and retrofits all piping for new tower upgrade at the Electronic Proving Ground (EPG) laboratory facility. The contractor shall dismantle, remove and replace the cooling tower. Demolition and remove the existing tower, including all associated structural components, piping, and electrical connections. Supply a new 150-ton capacity, closed loop glycol cooling tower system. Design new system that must be fully automatic, and interlock with the supported test chamber. Maintain a constant water temperature. Must have hydrostatic testing of piping, fan balancing, thermal performance verification, and control system validation at the Electronic Proving Ground laboratory facility. This is to include, but may not be limited to the following: Water Distribution System: check spray patterns, pressure, and alignment. Remove scale, algae and debris from nozzles and headers, replacing any clogged or damaged components. Heat Transfer Section: inspect fill material for scaling fouling or damage. Fan and Mechanical System: test fan blade balance, tip clearance and pitch. Replace worn or damaged blades, hubs and bearings. Structure and Basin: check air inlet louvers for leaks, corrosion and flush and descale the sump. The contractor shall ensure: All design, materials, and installation shall comply with statement of work All wiring shall be installed in proper working order All work shall be coordinated to minimize disruption to ongoing testing operations Contractor shall provide project management, supervision, and close coordination with facility personnel The contract will consist of 180 calendar days from the point of award. The North American Industry Classification System (NAICS) code is 238220. This Notice of Intent to award a Sole Source Contract is not a request for competitive proposals. Any responses or inquiries to this notice must demonstrate clear and convincing evidence that competition will be advantageous to the Government. All information received from this notice shall be used for planning and market research purposes only. The determination to refrain from competing proposed contracts based on responses to this notice is solely within the discretion of the Government. The Government will not pay for the preparation of any information submitted or use of such information. Acknowledgement of receipt of responses will not be made, nor will respondents be notified of the evaluation of the information received. Interested parties may express interest and provide a capability statement no later than 18 August 2026, 09:00 AM MST (Arizona does not observe Daylight Saving Time). Responses should be addressed to rhonda.k.gill.civ@army.mil Place of Performance: Fort Huachuca, Arizona 85613

Go deeper on this solicitation

FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.

Open the AI analysis in FedSift →

Free forever plan — no credit card. Browse solicitations without an account; sign in for AI analysis and matching.

Market context: DoD and NAICS 238220

About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.

  • In fiscal year 2026, DoD obligated $337.8M across 644 contract actions under NAICS 238220.
  • 236 contracts worth $391.7M in this category end within the next 18 months.

DoD contracts under NAICS 238220 →

Other open solicitations in NAICS 238220

All NAICS 238220 solicitations →

More from Department of Defense

All DoD solicitations →

Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.

FedSift turns SAM.gov and USASpending data into federal BD intelligence — smart matches, recompete radar, cited AI solicitation analysis and compliance matrices.

Source data: SAM.gov (solicitations) and USASpending.gov (awards), refreshed nightly. FedSift is not affiliated with the U.S. Government.

Pricing · Privacy · Terms · support@fedsift.app