(FTG251) Maintenance Support Facility Ft Greely, AK
Inactive on SAM.gov — responses were due 10 Sep 2026 · Unrestricted (full and open) · Department of the Army, DoD · Fort Greely, AK · NAICS 236220 · Solicitation W911KB26RWP04
Following NAICS 236220? Get new solicitations in it by email as they post — no account needed.
SAM.gov marked this notice inactive — responses were due 10 September 2026.
No award notice on SAM.gov yet. Not every award is posted there, so this does not mean it went unawarded.
Email me when the award is announced. One email, when SAM.gov posts the award notice. Not every award is posted there; if none appears within six months we'll tell you and stop. No account needed.
This one has closed. We'll email you when new NAICS 236220 (Commercial and Institutional Building Construction) solicitations post — the first email lists what is open right now, then at most once a week, only when something new posts. No account needed; unsubscribe in a click.
Description
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE Notice: This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm s ability to submit a proposal should a formal solicitation be issued in the future. NAICS Code: 236220 Commercial and Institutional Building Construction (Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Alaska District, has a requirement for Maintenance Support Facility consists of a heated and ventilated, multipurpose maintenance facility separated into a vehicle storage area and maintenance area. The vehicle storage area includes warm storage capability for mission vehicles and a vehicle washing station. The maintenance area includes receiving/loading docks; environmentally controlled storage areas for interceptor equipment, tools and maintenance equipment, spares, forklift/s and hazardous material spill response materials, arctic clothes and equipment, and maintaining Facility Systems Operation and Maintenance manuals, drawings and other documentation; offices, workstations, and conference space for related management and administrative personnel; lockers, latrines and shower facilities; and breakroom. Construction includes a Fuel Station for organizational vehicle fueling. Cyber-security measures include Facility Related Control Systems for Electronic Security System, Building Automation System, Electric Power Management System, Lighting Control, and Fire Alarm / Mass Notification Systems. Construction to match nearby facilities on the Missile Defense Complex (MDC). Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Estimated Acquisition Magnitude: Between $75,000,000-$85,000,000. Planned Acquisition Strategy: Anticipated to utilize Progressive Design Build via Other Transaction Authority (OTA) The Alaska District is conducting market intelligence to assess industry capability and interest in supporting this effort utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. 2808a, Facility Construction or Repair: Transactions Other Than Contracts and Grants. This authority is distinct from the Department of Defense prototype OT authorities commonly associated with 10 U.S.C. 4021 and 4022. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction. The anticipated delivery method is Progressive Design Build. Phase 1: Design and Pre-Construction Services - The OT Awardee shall assist the Government collaboratively in achieving its goals with respect to the project s scope, constructability, budget, quality, schedule, and in coordination with the Designer of Record (DOR). Phase 2: Final Design and Construction - Upon reaching an agreed-upon level of design (e.g., 95 to 100%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the construct the facility via alternative methods. SUBMISSION INSTRUCTIONS: Please see the attached Market Intelligence Questionnaire pdf and email your response to Michelle Nelsen Michelle.Nelsen@usace.army.mil and Brittney Morrison at Brittney.morrison@usace.army.mil by 10 September 2026 at 14:00 Alaska Time. Any questions regarding the requirement or issues please reach out to Brittney Morrison at brittney.morrison@usace.army.mil and Michelle Nelsen at michelle.nelsen@usace.army.mil
Documents in the solicitation package
1 file is attached to this notice.
Market Research Intelligence Questionnaire FTG251.pdf
FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.
Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.