FedSift

Solicitations › Department of Veterans Affairs

H912--Sources Sought Fire Damper Testing POP 12/31/2026-12/30/2027

Open — responses due 6 Oct 2026 (closes within a day) · Unrestricted (full and open) · Department of Veterans Affairs (VA) · BILOXI · NAICS 541350 · Solicitation 36C25626Q1365

Solicitation details

Solicitation number36C25626Q1365
Notice IDc241dc02517e4f109bc3c8ef29ca4cf6
AgencyDepartment of Veterans Affairs (VA)
Contracting office256-NETWORK CONTRACT OFFICE 16 (36C256)
NAICS code541350 — Building Inspection Services
Product / service code (PSC)H912
Set-asideUnrestricted (full and open)
Notice typeSources Sought
Posted29 September 2026
Response deadline06 October 2026
Place of performanceBILOXI

Description

STATEMENT OF WORK FIRE DAMPER INSPECTION AND TESTING 1. Scope. The intent of this one-time service is to inspect and test multiple building s Fire Dampers (247 dampers) for regulatory compliance on the Biloxi VA Campus as described below within the 90 days following the Notice to Proceed. 2. Specifications/Characteristics: Minimum technical specs must be provided to meet the requirements of the GCVHCS. Campus Overview - The 247 Fire Dampers for inspection and testing are in the Patient Buildings of 3, 30, 14, 15, and 25 and the Non-Patient Buildings of 1, 2, 5, 19, and 28 on the Biloxi VAMC Campus. See Chart 1. These Fire Dampers assist fire prevention from the buildings and communicates with the current installed Fire Alarm System. See Table 1. All painted or damaged fusible links must be replaced with a link of same size, temperature, and load rating. The location of each fire damper and access panel to be verified on each drawing and then updated on each drawing in accordance with NFPA guidelines. All inspected fire dampers must have a visible label that corresponds to an Item number on the list, inspection date, condition, and inspector. Each building inspected will have its own inspection documentation with 2 pictures minimum per damper showing damper itself and general comments affecting damper operation. Each damper on the final report at a minimum shall state Pass / Fail. Contractor shall furnish within the 90 days, the red-lined AutoCAD 2000 / Adobe PDF drawing for each building on a CD and on 11 x 17 sheet. All pictures taken are to be labeled, organized by building and floor, and provided on a CD. Contractor shall furnish a formal Fire Damper Report on CD by building of all dampers inspected with inspectors signature. 3.0 Applicable Codes, Standards and Regulations 3.1. All work shall be done in accordance with the current National Fire Protection Agency (NFPA) Code requirements. 3.2. The Joint Commission, the latest applicable National Fire Protection Association (NFPA) standards, and Occupational Safety and Health Administration (OSHA) regulatory requirements. Testing is specific to 4 year frequency test for fire pump/smoke pump in facility. 3.2.1. NFPA 80 Standard for Fire Doors and Other Opening Protectives 3.2.2. NFPA 90A Standard for the Installation of Air Conditioning and Ventilating Systems 3.2.3. NFPA 101 Life Safety Code 3.2.4. NFPA 105 Standard for Smoke Door Assemblies and Other Opening Protectives 3.2.5. NFPA 5000 Building Construction & Safety Code 4. Comprehensive Fire/Smoke Damper Inspection Tasks Contractor shall: 4.1. Furnish all labor, tools, and equipment to inspect fire and smoke dampers at Biloxi VAMC Campus. 4.2. Use commercially reasonable efforts to locate and, once located, operate all dampers provided in list by Contracting Officer s Representative (COR) upon commencement of inspection. 4.3. Include documentation of all tested devices and must identify as a minimum which includes date inspected, unique device identification, device location, status (Pass or Fail), the type and quantity of devices tested in each building, and a consolidated deficiency finding list per building. 4.4. Coordinate with the COR, Air Conditioning Equipment Mechanic, Electronics Mechanic and notify local fire department that the fire alarm system is in test mode due to the inspection of the smoke and/or combination dampers. 4.5. Locate, access and survey area of dampers. 4.6. Clear each damper of any debris that would impede such dampers normal operation. 4.7. Check for penetrations. 4.8. Ensure no interference to operation due to: (rusted, bent, misaligned, or damaged frame or blades, or defective hinges or other moving parts). 4.9. Inspect all linkage and pivot points for freedom of movement and condition. 4.10. Manually activate actuators on electric smoke and/or combination dampers to verify proper operation. 4.11. Lubricate all moving parts on each damper. 4.12. Check operation of the latch if damper is provided with a latch. 4.13. Reset fusible links on fire dampers, to verify such fire damper fully closes and if necessary, replace any fusible link that is compromised (per NFPA code requirements). 4.14. Replace springs and/or access handles for the fire/smoke dampers as necessary. 4.15. Identify each unidentified unit location with a ceiling grid damper label. 4.16. Identify on drawings the location of each damper, along with placement of identification stickers on ceilings or other location to assist in future location of such dampers; 4.17. Authenticate compliance utilizing a customized Universal Product Code (UPC) label applied directly to all damper units, specifying reference number and inspection date. 4.18. Create a comprehensive inventory and repair list for all inspected damper locations. 4.19 Thoroughly clean all areas with a high-density high efficiency particulate air (HEPA) filtration system. 4.20. Complete all pertinent damper unit repairs as deemed necessary (linkage adjustments, damper unit mounts, flex installations). 4.21. Contractor shall be able to perform such repair or replacement if dampers are in need of either replacement or repair, the scope of repair or replacement shall be determined by the project manager and/or contractor technician. A list of defective dampers shall be generated by the contractor and provided to the COR and Contracting Officer for approval. 4.22. Provide a report on conclusion of performance of evidence of inspection, repair, or replacement to include a listing of the location of each damper, damper s VA established ID number, and whether such damper passed or failed; if a damper failed, a detailed explanation of such failure. 4.23. Repair exceptions pertain to access door installations and new damper unit installations as determined by Fire and Smoke Damper Inspection. 4.24. Summary of 4 year fire/smoke damper testing: a) Physically access each damper b) Remove fusible link in damper c) Cycle the damper to verify full closure d) Test smoke damper actuators e) Replace fusible link with new one f) Document pass/fail results 4.25. Purpose of testing ensures that each damper will close to stop fire/smoke from traveling through ducts or walls. 5. Repair Work 5.1. The contractor shall inspect and provide documentation of fire damper functionality. The contractor shall make any adjustments necessary to the fire damper linkages and brackets to correct operation of the damper. Replace any links found to be damaged, painted or otherwise compromised or unacceptable with a link of the same size, load and temperature rating. 5.2. Repairs beyond the scope of fusible links: If additional repairs are required to make a damper operational, provide the nature of the repair and a cost estimate in the inspection summary report. 5.3. Any work that will result in additional charges MUST be approved by the Contracting Officer, in writing, BEFORE such work begins. Any additional work performed by the Contractor without the prior, written approval of the Contracting Officer shall be at no additional 6. Delivery Gulf Coast Veterans Health Care System Warehouse Bldg 26 400 Veterans Ave Biloxi MS 39531 Mon-Fri 7:00am- 3:30pm 7. Period of Performance is 12/31/2026 12/30/2027. Table 1: Fire Dampers to be Inspected and Tested Building 1 Damper Number Department or Area Damper Location 1 BSMT Ex Duct by AHU 9 RM BAC 9 2 BSMT Outside of RM BC 101 1 1 1A135 3 1 1C114 11 1 1C114 12 1 1C114 4 2 Mech RM across from 2C115 22 2 2B104 23 2 2A108 24 2 2C109 25 2 2C109 26 2 2C109 27 2 2C109 28 2 2C113B 29 2 2C113B 1 Attic 2 AHU 3 Supply 2 Attic 2 AHU 3 4 Attic 2 AHU 4 5 Attic 2 AHU 4 6 Attic 2 AHU 4 7 Attic 2 AHU 4 Supply 8 Attic 2 AHU 4 9 Attic 2 AHU 4 10 Attic 2 AHU 4 11 Attic 2 AHU 4 12 Attic 2 AHU 4 13 Attic 2 AHU 4 14 Attic 2 AHU 2 Supply 15 Attic 2 AHU 2 16 Attic 2 AHU 2 17 Attic 2 AHU 1 Return 18 Attic 2 AHU 1 Return 19 Attic 2 AHU 1 20 Attic 2 AHU 1 Supply 22 Attic 2 Exhaust 13 23 Attic 2 AHU 11 24 Attic 2 AHU 11 25 Attic 2 AHU 11 26 Attic 2 AHU 11 27 Attic 2 EF-9 Building 2 Damper Number Floor Damper Location FD-1 1E 1B119 FD-2 1E 1B119 FD-3 1E 1B119 FD-4 1W 1A112 FD-5 1W 1A112 FD-6 1W 1A112 FD-7 2E 2B111 FD-8 2E 2B111 FD-9 2E 2B111 FD-10 2W 2A106 FD-11 2W 2A106 FD-12 2W 2A106 FD-13 3E 3B116 FD-14 3E 3B116 FD-15 3E 3B116 FD-16 3W 3A105 FD-17 3W 3A105 FD-18 3W 3A105 Building 3 / 30 Damper Number Floor Damper Location 12 2 AHU 2 Supply RM 2D140 1 1A 1H100 2 1A 1H100 3 1A 1H100 10 1G 1G116 11 1G 1G119 12 1G 1G121 13 1G 1G121 14 1G 1G128 15 1G 1G125 16 1G 1G125 17 1G 1G125 18 1G 1G125 19 1G 1G128 Hallway 20 1G 1G129 21 1G 1G132 22 1G 1G132 23 1G 1G132 24 1G 1G134 in chase 25 1G 1G134 in chase 26 1G 1G134 in chase 27 1G 1G140 28 1G 1G148 Double Doors 29 1G 1G143 30 1G 1G143 31 1G 1G143 32 1G 1G143 33 1G 1G135 in chase 1 1H 1H103 Main Corridor 2 1H 1H102 3 1H 1H102 4 1H 1H100 Hallway 6 1H 1H100 7 1H 1H100 1 1J C1-44 2 1J C1-44 3 1J C1-44 4 1J C1-44 5 1J C1-44 6 1J 1J141 7 1J 1J142 8 1J 1J143 9 1J…

Documents in the solicitation package

1 file is attached to this notice.

Download them from SAM.gov, or open the solicitation in FedSift to read them with page-cited analysis.

Go deeper on this solicitation

FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.

Open the AI analysis in FedSift →

Free forever plan — no credit card. Browse solicitations without an account; sign in for AI analysis and matching.

Market context: VA and NAICS 541350

About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.

VA contracts under NAICS 541350 →

Other open solicitations in NAICS 541350

All NAICS 541350 solicitations →

More from Department of Veterans Affairs

All VA solicitations →

Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.