Solicitations
› DEPT OF DEFENSE
› NAICS 332919
ACTUATOR,ELECTRO-PH
DEPT OF DEFENSE · Solicitation N0010424QQD75 · NAICS 332919 · Unrestricted (full and open) · Responses due 16 October 2026
Solicitation details
| Solicitation number | N0010424QQD75 |
|---|
| Notice ID | cc78080c8478444793bed6e4b6167548 |
|---|
| Agency | DEPT OF DEFENSE |
|---|
| Sub-tier | DEPT OF THE NAVY |
|---|
| Contracting office | NAVSUP WEAPON SYSTEMS SUPPORT MECH |
|---|
| NAICS code | 332919 |
|---|
| Product / service code (PSC) | 4810 |
|---|
| Set-aside | Unrestricted (full and open) |
|---|
| Notice type | Solicitation |
|---|
| Posted | 09 September 2026 |
|---|
| Response deadline | 16 October 2026 |
|---|
Description
CONTACT INFORMATION|4|N7M2.9|BSH|N/A|JACOB.T.DAVIS18.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBINATION INVOICE AND RECEIVING||TO BE DETERMINED|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|SEE SCHEDULE||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| EQUAL OPPORTUNITY (SEP 2016)|2||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|332919|750 EMP|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||x| THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE SOLICITATION DUE DATE TO 27 MAR 2026. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. POC FOR THIS AMENDMENT IS JACOB DAVIS N7M2.9 AT JACOB.T.DAVIS18.CIV@US.NAVY.MIL. THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE SOLICITATION UNTIL 13 FEB 26. POC FOR THIS AMENDMENT IS JACOB DAVIS N7M2.9 JACOB.T.DAVIS18.CIV@US.NAVY.MIL.^^ THE PURPOSE OF THIS AMENDMENT IS TO INCREASE THE QUANITY BY THREE UNITS AS SHOWN ON THE SCHEDULE PAGE BELOW AND EXTEND THE OFFER DUE BY DATE. Accelerated delivery is encouraged and accepted before the delivery date(s) "All freight is FOB Origin. This RFQ is for repair. The resultant award of this solicitation will be issueThe Government is seeking a Repair Turnaround Time (RTAT) of: 190 days Government Source Inspection (GSI) is required. Please note freight is handled by the Navy as per the Commercial Asset VisibiliYour quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT): _______ days If your company is not quoting the Government's Required Repair Turnaround Time_________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Repair Turnaround Time (RTAT): the resultant contractual delivery requirement i Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___ Return Material Authorization # (RMA), if applicable:__________ Delivery Vehicle (if Delivery Order requested) (if your company has a current ^^^^^^^^^^^^^^^TESTING AND EVALUATION IF BEYOND REPAIR^^^^^^^^^^^^^^^ T&E fee/price (if asset is determined BR/BER): If an item is determined BR, a The T&E fee (if asset is determined BR/BER) was determined/computed based on:______________________________________. AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as ""awardee CAGE"": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same ^^^^^^^^^^^^^^^ IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW^^^^^^^^^^^^^^^ New unit price:__________ New unit delivery lead-time:__________ ""ALL PRICING IS FIRM. PLEASE CONSIDER THE FOLLOWING WHEN PROVIDING PRICE: Include repair price with all costs associated with receipt and complete repai"The Government intends to add an option quantity to the resultant contract. I""IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - aIn reference to the above important note, the contractor provides the following 1. SCOPE 1.1 This contract/purchase order contains the requirements for repair and the contract quality requirements for the ACTUATOR,ELECTRO-PH . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The ACTUATOR,ELECTRO-PH repaired under this contract/purchase order shall meet the operational and functional requirements as represented by the Cage Code(s) and reference number(s) listed below. All repair work shall be performed in accordance with the contractors repair/overhaul standard practices, manuals and directives including but not limited to drawings, technical orders, manufacturing operations, tooling instructions, approved repair standards and any other contractor or government approved documents developed to provide technical repair procedures. CAGE___Ref. No. ;53711 6769055 53711 2466-6A; 3.1.1 ;Item of supply known to meet the requirements of the drawing is CAGE 03972 P/N 2466-7. ; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 3.4 Electrostatic Discharge Control - The Contractor shall comply with the electrostatic discharge control requirements established in MIL-STD-1686. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 4.4 Inspection/Testing Repaired Items - The Contractor shall perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can…
Go deeper on this solicitation
FedSift reads the full solicitation package — every attachment — and pre-extracts
the compliance matrix, evaluation factors, key risks, win themes and
deal-breakers, each with a verbatim quote and the exact PDF page it came from. It
scores the opportunity against your company profile, tells you whether to bid as
prime or sub, and ranks teaming partners who could close your gaps.
Open the AI analysis in FedSift →
Free forever plan — no credit card.
Browse solicitations without an account; sign in for AI analysis and matching.
Other open solicitations in NAICS 332919
- 42--NOZZLE,FIRE EQUIPMENTDEPT OF DEFENSE · Due 14 September 2026
- 42--NOZZLE,FIRE EQUIPMENTDEPT OF DEFENSE · Due 14 September 2026
- 48--VALVE,SAFETY RELIEFDEPT OF DEFENSE · Due 14 September 2026
- 47--COUPLING,PIPEDEPT OF DEFENSE · Due 14 September 2026
- 47--ELBOW,PIPEDEPT OF DEFENSE · Due 14 September 2026
- 47--ELBOW,PIPE TO TUBEDEPT OF DEFENSE · Due 14 September 2026
- 48--VALVE,LINEAR,DIRECT, IN REPAIR/MODIFICATION OFDEPT OF DEFENSE · Due 14 September 2026
- 47--CONNECTION,FLEXIBLEDEPT OF DEFENSE · Due 14 September 2026
All NAICS 332919 solicitations →
More from DEPT OF DEFENSE
All DEPT OF DEFENSE solicitations →
Source: this notice on SAM.gov.
FedSift republishes public federal procurement data and is not affiliated with
the U.S. Government. Always confirm dates and requirements against SAM.gov
before responding.