Closed — responses were due 1 Dec 2025 · No Set aside used · Department of the Air Force, DoD · Mountain Home AFB, ID · NAICS 236220 · Solicitation FA489725R0008
Following NAICS 236220? Get new solicitations in it by email as they post — no account needed.
A newer version of this notice has been posted. SAM.gov republished solicitation FA489725R0008 on 14 January 2026. This page is kept because it is a real record, but the current requirement, dates and attachments are on the latest version. Read the latest version →
What happened next
This solicitation has closed — responses were due 01 December 2025.
No award notice on SAM.gov yet. Not every award is posted there, so this does not mean it went unawarded.
Email me when the award is announced. One email, when SAM.gov posts the award notice. Not every award is posted there; if none appears within six months we'll tell you and stop. No account needed.
This one has closed. We'll email you when new NAICS 236220 (Commercial and Institutional Building Construction) solicitations post — the first email lists what is open right now, then at most once a week, only when something new posts. No account needed; unsubscribe in a click.
Description
Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance. Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system. It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out. Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc. See attachments below for all relevant documents. For the proposal, all "if applicable" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable. A site visit for any interested parties will be held on November 3rd, 2025 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after. Per the evaluation factors, Questions must be submitted no later than 3:00 PM local (Mountain), Nov 17, 2025. Proposals must be submitted no later than 3:00 PM local (Mountain), Dec 1, 2025. Questions shall be directed to both POCs.
Version history
SAM.gov has posted 10 notices under solicitation FA489725R0008, oldest first.
FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.
Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.