FedSift Sign inSign up free

Solicitations › Department of Defense › Department of the Navy

K LOADER PARTS SUPPLY AT AL MINHAD AIRBASE, UNITED ARAB EMIRATES

Closed — responses were due 29 Sep 2026 · No Set aside used · Department of the Navy, DoD · Dubai · NAICS 333924 · Solicitation N4033926QD007

Following NAICS 333924? Get new solicitations in it by email as they post — no account needed.

Email me new ones

Solicitation details

Solicitation numberN4033926QD007
Notice IDe089e6e095eb4f018b219908b0a49442
AgencyDepartment of Defense (DoD)
Sub-agencyDepartment of the Navy
Contracting officeNAVSUP FLC BAHRAIN
NAICS code333924 — Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
Product / service code (PSC)3990
Set-asideNo Set aside used
Notice typeSolicitation
Posted25 September 2026
Response deadline29 September 2026 (closed)
Place of performanceDubai, ARE
CompetitionCompetitive

Description

STATEMENT OF WORK (K-Loader Repair Parts Al Minhad AB, U.A.E.) 1. Scope: This requirement is for the procurement and delivery of repair parts required to restore an inoperable K-Loader supporting the CTF-53 Minhad Air Cargo Team at Al Minhad Air Base, U.A.E. 2. Specific Requirements: Contractor shall: 2.1 Provide and deliver the following K-Loader repair parts: Pump, Hydraulic Part #623-8652 Qty: 1 Filter, High Pressure, 75 GPM Part #514-8245 Qty: 1 FK-E-Pump, Halvorsen Part #627-9669-050 Qty: 1 Joystick and Card, Convey Part #624-2917 Qty: 1 A-Manifold, Chassis Hydraulic Part #631-7559-003 Qty: 1 2.2 All parts shall be new, unused, serviceable, and compatible with the K-Loader for which they are intended. Equivalent or alternate parts are acceptable, provided they meet the exact specifications, form, fit, function, compatibility, and performance requirements of the parts identified in this SOW. Any proposed alternate part shall be fully compatible with the applicable K-Loader and meet or exceed the specifications of the listed JBT/Oshkosh AeroTech part number. For any proposed equivalent or alternate part, the Contractor shall provide sufficient technical documentation to enable Government technical review and verification of compliance with the requirements of this SOW. Documentation shall include, as applicable, the manufacturer/brand, model and part number, technical specifications, product data sheets, compatibility information, and any other supporting documentation necessary to demonstrate that the proposed part meets or exceeds the specifications, form, fit, function, compatibility, and performance requirements of the listed JBT/Oshkosh AeroTech part. 2.3 Shipping and Delivery: Contractor shall provide all packaging, handling, and outbound freight necessary to deliver the required parts to Al Minhad Air Base, U.A.E. Contractor shall provide shipment tracking information and applicable shipping documentation upon shipment. Based on the estimated lead time provided by the Original Equipment Manufacturer (OEM), and allowing additional time for order coordination, documentation, shipment, and final delivery to Al Minhad Air Base, all required parts shall be delivered no later than ninety (90) calendar days after receipt of order (ARO). Based on an anticipated receipt of order date of 30 September 2026, the required delivery date shall be no later than (NLT) 29 December 2026. 2.4 Inspection and Acceptance: The Government-designated receiving representative shall inspect delivered parts to verify correct part numbers, quantities, and condition. Any incorrect, damaged, defective, or otherwise nonconforming parts shall be replaced by the Contractor at no additional cost to the Government. 2.5 Delivery Documentation: Contractor shall provide a delivery receipt or packing list identifying the part description, part number, quantity, and date of delivery. The Government- designated receiving representative shall acknowledge receipt and acceptance of the delivered items. 2.6 Warranty: All parts shall be covered by the manufacturer's standard warranty, where applicable. The Contractor shall provide applicable warranty documentation with the delivered parts. 3. Period of Performance: The period of performance shall begin upon contract award and continue through final delivery and Government acceptance of all required parts. Delivery of all required parts shall occur within ninety (90) calendar days ARO, with an anticipated NLT delivery date of 29 December 2026 based on receipt of order on 30 September 2026.

Documents in the solicitation package

1 file is attached to this notice.

Download all 1 file as one ZIP Free account, no credit card.

Reading them for requirements? FedSift turns the package into a compliance matrix — every requirement with the page it came from, exportable to Excel.

Or download them one at a time from SAM.gov.

Go deeper on this solicitation

FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.

Open the AI analysis in FedSift →

Free forever plan — no credit card. Browse solicitations without an account; sign in for AI analysis and matching.

Market context: DoD and NAICS 333924

About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.

DoD contracts under NAICS 333924 →

Other open solicitations in NAICS 333924

All NAICS 333924 solicitations →

More from Department of Defense

All DoD solicitations →

Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.