Parachutist Oxygen Delivery System (PODS) Prototype
Inactive on SAM.gov — responses were due 3 Aug 2026 · Unrestricted (full and open) · Department of the Army, DoD · Natick, MA · Solicitation W91CRB-Parachutist-Oxygen-Delivery-System-(PODS)-Prototype
A newer version of this notice has been posted. SAM.gov republished solicitation W91CRB-Parachutist-Oxygen-Delivery-System-(PODS)-Prototype on 31 July 2026. This page is kept because it is a real record, but the current requirement, dates and attachments are on the latest version. Read the latest version →
What happened next
SAM.gov marked this notice inactive — responses were due 03 August 2026.
No award notice on SAM.gov yet. Not every award is posted there, so this does not mean it went unawarded.
Email me when the award is announced. One email, when SAM.gov posts the award notice. Not every award is posted there; if none appears within six months we'll tell you and stop. No account needed.
PODS: Parachutist Oxygen Delivery System THIS IS NOT A SOLICITATION. IT IS A REQUEST FOR INFORMATION. In accordance with Federal Acquisition Regulations Part 10 responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Please respond by 26 June 2026 at 11:59 PM. Objective This Request for Project Preproposal (RPP) is issued to request preproposals (white papers) in accordance with Section III, B, 1 of the U.S. Army Combat Capabilities Development Command Soldier Center (DEVCOM SC) Broad Other Transaction Authority Announcement (BOTAA) 22-01 competitive announcement and is being issued for planning purposes only. It is not to be construed as a commitment by the Government to award an agreement, nor will the Government pay for the information solicited. Product Manager Soldier Clothing and Individual Equipment (PdM SCIE) is seeking information on the capabilities and willingness of private entities (non-profit and commercial) to provide a Parachutist Oxygen Delivery System (PODS) design that will support a prototype project, as defined on page 5 of the BOTAA. Background PdM SCIE is executing a project to evaluate prototype supplemental oxygen delivery systems. The PODS capability is intended to be single materiel solution that is suitable for Military Free Fall (MFF) operations utilizing the Advanced Ram Air Parachute System (RA-1). The PODS system is planned to support the U.S. Army s MFF community by addressing a capability gap to support all high-altitude parachutist mission profiles (e.g., High Altitude Low Opening (HALO) and High-Altitude High Opening (HAHO)) requiring supplemental oxygen. The PODS will comprise the following components: Parachutist Oxygen Mask (POM), Individual Oxygen Source (IOS), pre-breathing ports, transfer pump, and test stand. Included is a Non-traditional Defense Contractor Certification form to be filled out. Requirements The purpose of this RPP is to request preproposals to conduct Test and Evaluation (T&E) of systems that can meet PODS capability requirements. The proposed designs may be based on reusing, modifying, or enhancing existing designs. The preproposals shall address the full requirements of this RPP for a technology that is at or above Technology Readiness Level (TRL) six (6) as defined in the attached Technology Readiness Assessment Guidebook. Proposed solutions shall be fully compliant with the Berry Amendment, Defense Acquisition Regulation Supplement (DFARS) 252.225-7012, and the Buy American Act, DFARS 252.225-7001. PdM SCIE will conduct a phased T&E approach to select the best materiel solution for the Army. The T&E will include the following phases: Developmental Testing (DT) Phase 1, DT Phase 2, and Operational Testing (OT). The Government will make the final down-selection to one (1) candidate system at the conclusion of DT Phase 1 Live Jumps at 17,999ft Mean Sea Level (MSL). However, failure to meet performance criteria at any stage of DT Phase 1 may result in candidate systems being disqualified from continuing to the next stage. DT Phase 1 will include: Chamber test Environmental test Benchtop testing as required to verify KPPs, KSAs, and APAs Integration Assessment User Evaluations including Live Jumps up to 17,999ft MSL Following Live Jumps at 17,999ft MSL, the Government will down-select to one (1) candidate system to continue T&E. Selection will be based on best value. Life cycle costs, including initial procurement and sustainment based on the proposed maintenance concept, will be considered in addition to technical performance. DT Phase 1 will then conclude with the down-selected candidate system completing Live Jumps at 24,999ft MSL. DT Phase 2 will consist of a series of Live Jumps by Army Test and Evaluation Command (ATEC) test jumpers up to 24,999ft MSL. OT will consist of Live Jumps by the operational force to include various mission profiles including those outlined in the requirements. In addition, the test stand, console, and maintenance concepts will be evaluated. A Production OTA may be awarded to the down-selected vendor after successful completion of OT and obtaining Milestone C and Low-Rate Initial Production decisions. Production OTA award is contingent on availability of funds. PODS Performance Requirements The system performance requirements are given in Tables 1, 2, and 3 below. These tables provide both Threshold (T) and Objective (O) levels. The objective level is the performance goal, whereas the threshold level is the minimum acceptable level. PdM SCIE strongly prefers a solution that can meet objective levels of the PODS performance requirements. Table 1: Key Performance Parameters Key Performance Parameter (KPP) Production Threshold Production Objective KPP #1 Performance (POM). Shall be capable of delivering the parachutist with O2 during pre-breathe, jump and landing (T=O). T=O KPP #2 Performance (IOS). Shall provide parachutist with sufficient supply of O2 for minimum of 45 minute parachutist descent using a minimum 400 liter capacity utilizing the POM (T). Shall provide parachutist with sufficient supply of O2 for minimum 1 hour descent, plus provide sufficient O2 to support parachutist through pre-breathing phase of 75 minutes (O). KPP #3 Reliability and Confidence (IOS and POM). Shall have reliability of 0.95 @ 90 percent (90%) confidence level without occurrence of system abort or system failure (T). Shall have reliability of greater than (>) 0.95 at 90 percent (90%) confidence level without occurrence of system abort or system failure (O). Note on KPP#2 (O) allows for different capacity/size IOS than the stated minimum size in the (T) Table 2: Key System Attributes Key System Attribute (KSA) Production Threshold Production Objective KSA #1 - Performance (Pre-Breather Ports). Each shall be capable of providing 20-lpm of O2 for 75 minutes (T). Each shall be capable of providing a parachutist with 20-lpm for 2 hours (O). KSA #2 - Air Standardization (System) Use of Aviator s Breathing Oxygen (ABO) shall not degrade system, components or safety (T=O). T=O KSA #3 - Override System (Pre-Breather) Pre-Breather shall possess means to override IOS pressure when parachutist is connected to Pre-Breather port/station (T). Shall possess visual indicator to alert parachutist if oxygen from IOS is being consumed during pre-breathing operations (O). KSA #4 - Pressure Gauges (System) Transfer Pump, Pre-Breather, and IOS shall possess indicators and pressure gauges to verify functionality (T). Shall possess digital indicators readable in all light conditions and while wearing NVD and will be read by the parachutist (O). KSA #5 POM Shall have provision for communications, compatible with parachutist s organic devices (T=O). T=O Table 3: Additional Performance Attributes Additional Performance Attribute (APA) Production Threshold Production Objective APA 1 - Performance (Transfer Pump). Shall be capable of recharging 6 IOS simultaneously (T). Shall be capable of recharging 12 IOS simultaneously (O). APA 2 Connectors / Fittings / Valves (System) Connectors shall be self-sealing quick disconnect assemblies; Transfer Pump shall possess pressure bleed-off valves; Transfer Pump manifold shall possess individual shut off values and individual pressure relief values; all connectors shall provide protection for O2 fittings when not in use (T=O). T=O APA 3 - Compatibility (System) IOS shall be physically and functionally compatible with legacy POMs, Pre-Breathers and charging assemblies (T). Shall be capable of modification to incorporate new technologies (O). APA 4 - Hoses (POM and Pre- Breather) Shall possess self-sealing medium pressure (50 100) pounds per square inch (psi)) and withstand rigors of high altitude operations. Shall not impede parachutist s ability to locate and deploy main or reserve parachutes (T=O). T=O APA 5 - Environmental Conditions (IOS and POM) Shall operate at temperatures ranging from -45 degrees Fahrenheit (F) to 120 degrees F and humidity ranging from zero to 100 percent (100%) non-condensing, in non-cold soak environment (T). Shall remain operable in predominantly sand and dust environment without any additional support requirements beyond those for current O2 equipment. (T=O). Shall operate at temperatures ranging from -65 degrees Fahrenheit to 140 degrees F and humidity ranging from zero to 100 percent (100%) non-condensing, in non-cold soak environment (O). APA 6 - Carrier (IOS) Shall provide means to secure IOS to Type Classified (TC) and non-standard parachutes systems. Carrier shall not interfere with the performance of the parachute or parachutist (T). Shall be capable of accommodating all parachutist sizes and equipment worn (O). APA 7 - Size and Weight (IOS) Size and Weight (IOS). Shall not impede parachutist performance in all phases of the operation (T). Shall reduce weight and size while increasing capacity (O). APA 8 - Restraint Points (Pre- Breather) Shall be capable of…
Version history
SAM.gov has posted 4 notices under solicitation W91CRB-Parachutist-Oxygen-Delivery-System-(PODS)-Prototype, oldest first.
FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.
Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.