Inactive on SAM.gov — responses were due 11 Sep 2026 · Small Business Set Aside - Total · Department of the Air Force, DoD · Offutt AFB, NE · NAICS 238390 · Solicitation FA460026Q0095
Following NAICS 238390? Get new solicitations in it by email as they post — no account needed.
SAM.gov marked this notice inactive — responses were due 11 September 2026.
No award notice on SAM.gov yet. Not every award is posted there, so this does not mean it went unawarded.
Email me when the award is announced. One email, when SAM.gov posts the award notice. Not every award is posted there; if none appears within six months we'll tell you and stop. No account needed.
This one has closed. We'll email you when new NAICS 238390 (Other Building Finishing Contractors) solicitations post — the first email lists what is open right now, then at most once a week, only when something new posts. No account needed; unsubscribe in a click.
Description
PRE-SOLICITATION OFFUTT AFB 2WS/557WW Demountable Walls 55 CONS/PKB - FA4600 106 PEACEKEEPER LN, STE 2N3, OFFUTT AFB, NE 68113 27 August 2026 Product/Service Code: N017 NAICS code: 238390 Place of Performance: Offutt AFB, Nebraska Proposed Set Aside: 100% Total Small Business Set-Aside DESCRIPTION 55CONS intends to award a sole source, firm-fixed-price contract to Encompass Corporation for the reconfiguration of Haworth Demountable Walls for the 2WS and the 557WW. This notice is not a request for competitive quotes; however, interested parties who believe they can meet the requirements listed below may submit capability statements for consideration. Please see the attached PWS's for further specifications of this requirement. Summary of Performance Work Statements: 2WS 4.1 Wall Modifications Rooms 1340 & 1342 Partition: Disassemble existing demountable wall panels dividing Rooms 1340 and 1342. Salvage, inspect, and reuse hardware to relocate and install the wall, completely enclosing Room 1342 as an independent space. Room 1332 Reconfiguration: Install new demountable partition walls to divide the current footprint into two (2) fully enclosed offices and a shared communal area, including all ceiling tracks, floor channels, acoustic seals, and trim. Room 1343 Deconstruction: Fully disassemble and remove demountable walls, door frames, and hardware from Room 1343 to restore it to an open-plan layout. Hand over salvaged components to the 557th WW Facility Manager (or legally dispose/recycle as directed). Rooms 1220, 1221, & 1222 Merger: Disassemble and remove the demountable partitions dividing Rooms 1220, 1221, and 1222 to merge them into a single, open-concept footprint. Patch and repair affected ceiling grids, floor surfaces, and adjacent walls. 4.2 Door Installations The Contractor shall install four (4) 40-inch demountable door panels configured to open inward at the following locations: Room 1342: One (1) door panel. Room 1332: Two (2) door panels (one for each of the newly constructed offices). Room 1332 (from Room 1320): One (1) door panel. 4.3 HVAC (Government Furnished Property/Work) Air Transfer Grilles: Install return air transfer grilles between Room 1340 and the new office space, and between the new offices within Room 1332 to balance static pressure and ensure proper airflow distribution. Note: This specific task (4.3) will be accomplished by the 557th Weather Wing Facilities office and is excluded from the contractor's performance requirements. B185 The contractor shall perform the following teardown, relocation, and installation tasks: Room L422 Relocation and Reconfiguration: Dismantle and move the L423 four (4) West wall panels to the East by approximately 8ft. Utilize the existing L422 door and glass panel to establish the new L422 door space. Room L423 Expansion and Reconfiguration: Reclaim and integrate existing L423 and legacy L422 demountable panels to expand the designated work area. Use on hand demountable wall stock to fill in existing wall gaps to complete the room (~25ft). Install double solid wood doors in the Southeast corner of the room, complete with appropriate framing and HAWORTH-compatible commercial hardware. Final door location determined at install (adjust as needed to accommodate install) Room L421 Configuration Use existing material stock to install new walls to close in Collaboration and training space. Approximately 25 linear feet of panels, configured as two intersecting runs of approximately 23 feet and 2 feet. Final adjustment allowed during install. Extract the legacy L423 door and associate hardware and re-install door to serve as the new entrance for Room L421. TBD during install (Adjustments allowed as needed) This requirement will be awarded using RFO part 12 Simplified Procedures. The award will be made prior to 30 September 2026. If you have any questions please reach out via email to A1C Hunter Hendrix (hunter.hendrix.1@us.af.mil) or TSgt Jennifer Prestridge (jennifer.prestridge.1@us.af.mil).
FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.
Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.