Closed — responses were due 6 Nov 2026 · No Set aside used · Defense Logistics Agency (DLA), DoD · Aberdeen Proving Ground, MD · NSN 6150-12-343-3731 · NAICS 335999 · Solicitation SPRBL1-27-R-A006
Following NAICS 335999? Get new solicitations in it by email as they post — no account needed.
A newer version of this notice has been posted. SAM.gov republished solicitation SPRBL1-27-R-A006 on 09 November 2026. This page is kept because it is a real record, but the current requirement, dates and attachments are on the latest version. Read the latest version →
What happened next
This solicitation has closed — responses were due 06 November 2026.
SAM.gov re-posted this solicitation and it is open again until 23 November 2026. Read the open version →
Email me when the award is announced. One email, when SAM.gov posts the award notice. Not every award is posted there; if none appears within six months we'll tell you and stop. No account needed.
This one has closed. We'll email you when new NAICS 335999 (All Other Miscellaneous Electrical Equipment and Component Manufacturing) solicitations post — the first email lists what is open right now, then at most once a week, only when something new posts. No account needed; unsubscribe in a click.
Description
This is a Request for Proposal (RFP) for a 5-Year Firm-Fixed Price (FFP), hardware, Indefinite Quantity (IDIQ) contract. This RFP is for the items listed below and total Best Estimated Quantity (BEQ): Hardware: NSN: 6150-12-343-3731 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0501, total BEQ: 27 NSN: 6150-12-343-3732 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0504, total BEQ: 12 NSN: 6150-12-343-3733 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0058, total BEQ: 36 NSN: 6150-12-343-3734 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0502, total BEQ: 25 NSN: 6150-12-343-3735 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0503, total BEQ: 21 NSN: 6150-12-343-3736 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0050, total BEQ: 21 NSN: 6150-12-343-3737 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0505, total BEQ: 195 NSN: 6150-12-343-3738 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0148, total BEQ: 150 NSN: 6150-12-343-3739 Nomenclature: Cable Assembly, Spec Part Number: 180-01-0149, total BEQ: 21 NSN: 5975-12-343-4086 Nomenclature: Conduit Assembly, Part Number: 115-02-0016, total BEQ: 13 NSN: 5975-12-343-4089 Nomenclature: Conduit Assembly, Part Number: 115-02-0010, total BEQ: 13 NSN: 8130-12-358-4625 Nomenclature: Reel Cable, Part Number: 480-02-0047, total BEQ: 17 NSN: 5945-01-577-2614 Nomenclature: Relay, Hybrid Part Number: 335-01-0040, total BEQ: 60 NSN: 5975-12-343-4088 Nomenclature: Conduit Assembly Part Number: 115-02-0006, total BEQ: Please reference attached solicitation along with the attachment, Exhibit A, for all guidance and processes needed for submission.. If you have any questions, please contact Matthew Crouch (443) 417-6972, or Matthew.crouch@dla.mil. Amendment 0001 was required to make the following changes as follows: 1. Amend the solicitation to correct the closing date. Also, to update the Packaging/packing shall be in accordance with MIL-STD-2073-1E w/ Chg 1 to MIL-STD-2073-1E w/ Chg4. Please reference attached amendment 0001 for both changes. 2. To provide the following Question and Answers as follows: Q&A: Section L permits identifying NSNs that cannot be bid, but states only one contract will be awarded. Can an otherwise compliant offer covering fewer than all 14 NSNs receive award? For a distributor supplying approved Vincorion CAGE 1VD61 parts, what manufacturer authorization/traceability evidence is required, and which quality-system obligations must be met by the reseller versus the manufacturer? It can be proposed to part or all of the solicitation (unless we state in the solicitation it is all or nothing) We will evaluate upon receipt. As to traceability, it would be the same for counterfeit part traceability and show what manufacturers are using to submit the cable some of those connectors are manufactured in Europe and not by Vincorian solely. Q&A: Section L discusses mandatory FAT plan, report and sample pricing, but Section B appears to contain production CLINs 1001–5014 and data ELINs A001/B001 under CLIN 9000, without corresponding FAT CLINs. Does FAT apply? If so, please provide quantities, schedule, pricing lines and waiver criteria. Should A001/B001 be separately priced or NSP, and how will their costs enter evaluation? There is no FAT plan for this requirement. For CLINs A001/B001, they should be NSP and then it would be evaluated inside of the price as a total. Q&A: The TRD references a CECOM G2 Antiterrorism/OPSEC/Security Cybersecurity Review Cover Sheet, which was not located in the two supplied files. Please provide it and confirm any applicable offeror CMMC requirement or assessment level, in addition to the incorporated NIST assessment provision. This is an internal Government documentation completed by our mission partner as reference. This is not part of the RFP.
Version history
SAM.gov has posted 3 notices under solicitation SPRBL1-27-R-A006, oldest first.
FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.
Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.