RFI - Mini-MUTES Transmitter Engineering and Obsolescence Study
Inactive on SAM.gov — responses were due 3 Jul 2026 · No Set aside used · Department of the Air Force, DoD · Hill Air Force Base, UT · NAICS 334511 · Solicitation FA8210-26-MMUTES
Following NAICS 334511? Get new solicitations in it by email as they post — no account needed.
A newer version of this notice has been posted. SAM.gov republished solicitation FA8210-26-MMUTES on 24 June 2026. This page is kept because it is a real record, but the current requirement, dates and attachments are on the latest version. Read the latest version →
What happened next
SAM.gov marked this notice inactive — responses were due 03 July 2026.
No award notice on SAM.gov yet. Not every award is posted there, so this does not mean it went unawarded.
Email me when the award is announced. One email, when SAM.gov posts the award notice. Not every award is posted there; if none appears within six months we'll tell you and stop. No account needed.
This one has closed. We'll email you when new NAICS 334511 (Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing) solicitations post — the first email lists what is open right now, then at most once a week, only when something new posts. No account needed; unsubscribe in a click.
Description
Miniature Multiple Threat System (Mini-MUTES) Transmitter Engineering and Obsolescence Study See attached RFI document for more information. Industry Question: Does the government already have a list of all the known obsolescent parts within the Mini-MUTES? Or is the government looking to industry to identify this as part of the engineering and obsolescence study? Government Answer: The Government does not have a list of known obsolescent parts within the Mini-MUTES transmitters. We are looking to industry to perform this as part of the engineering and obsolescence study. Industry Question: Is this anticipated work for the Mini-MUTES to study and replace the obsolete components while keeping the original core design in-tact? Or, is this effort envisioned to be a complete system redesign with modern components, yet still maintain interface interoperability with legacy systems? Government Answer: The engineering study would be to look at replacing or re-engineering the obsolete components while keeping the original core design in-tact. However, if a redesign with modern components, while maintaining interface interoperability and meeting the power output requirements is possible that would be a consideration as well.
Version history
SAM.gov has posted 3 notices under solicitation FA8210-26-MMUTES, oldest first.
FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.
Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.