Z1DA--630A4-26-102 GI RENOVATION PHASE III

Inactive on SAM.gov — responses were due 31 Mar 2026 · Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) · Department of Veterans Affairs (VA) · Brooklyn, NY · NAICS 236220 · Solicitation 36C24226R0018

Following NAICS 236220? Get new solicitations in it by email as they post — no account needed.

Email me new ones

A newer version of this notice has been posted. SAM.gov republished solicitation 36C24226R0018 on 28 April 2026. This page is kept because it is a real record, but the current requirement, dates and attachments are on the latest version. Read the latest version →

What happened next

SAM.gov marked this notice inactive — responses were due 31 March 2026.

No award notice on SAM.gov yet. Not every award is posted there, so this does not mean it went unawarded.

Email me when the award is announced. One email, when SAM.gov posts the award notice. Not every award is posted there; if none appears within six months we'll tell you and stop. No account needed.

Solicitation details

Solicitation number36C24226R0018
Notice ID060da376be164c27b198224ceb8b1926
AgencyDepartment of Veterans Affairs (VA)
Contracting office242-NETWORK CONTRACT OFFICE 02 (36C242)
NAICS code236220 — Commercial and Institutional Building Construction
Product / service code (PSC)Z1DA
Set-asideService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice typeSolicitation
Posted06 March 2026
Response deadline31 March 2026 (closed)
Place of performanceBrooklyn, NY, USA

Get new NAICS 236220 solicitations by email

This one has closed. We'll email you when new NAICS 236220 (Commercial and Institutional Building Construction) solicitations post — the first email lists what is open right now, then at most once a week, only when something new posts. No account needed; unsubscribe in a click.

Description

THIS AMENDMENT IS ISSUED TO CORRECT THE SITE-VISIT TIME FROM 1:00 AM TO 10:00 AM AND TO PROVIDE THE MOST CURRENT SF330. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. Work Statement Performance Period: 365 Calendar Days Description of Work: Provide turnkey services to include all labor, materials, tools, supervision, equipment, safety, and other necessary items to design and construct GI Renovation Phase III at the Brooklyn Veteran Affairs Medical Center, 800 Poly Place, Brooklyn, NY 11228, in accordance with VA drawings and specifications at http://www.cfm.va.gov/til/specs.asp. Work shall meet all VA design guidelines and requirements. Specific Requirement: Scope of Work: Project Summary: The VA Brooklyn Hospital plans to finalize construction of the referenced project under a new construction contract. To support this effort, the VA has directed Premier Engineering Group, Inc. to revise the existing contract documents and assemble a comprehensive construction bid package, titled Design-Build RFP, covering all remaining scope items. I. Design-Build Package The selected contractor shall retain Premier Engineering Group, Inc. (439 US-46, Rockaway, NJ 07866 | Tel: 973-586-3004) to develop the full Design-Build Package, including all drawings and specifications. Bidders must coordinate directly with Premier Engineering to obtain the associated A/E design fee, which must be included in their bid proposal. II. Phase 1 Area B (4th Floor) Area B construction is substantially complete, with only minor remaining work required across all trades. The scope includes installing scheduled furniture and equipment, completing architectural and MEP punch-list items, and integrating medical equipment. Notably, medical booms will be installed in four rooms, along with engineered ceiling support structures. AHU-1 has been installed, and the ductwork has been connected; the contractor is responsible for unit startup and performance verification in accordance with the design documents. Key tasks include: Temporary protection and infection control measures Installation of medical booms, ceiling support structures, and med gas piping Selective replacement of interior finishes New glass film finished in Room 4-100 Completion of MEP punch-list items Replacement of lighting fixtures in Room 4-115 with LEDs New roof-mounted exhaust fan and ductwork (with associated electrical) in Room 4-107 Airflow balancing of all supply diffusers and return/exhaust grilles Installation of reheat steam coils and temperature sensors for select CV boxes Replacement of outdated lighting controls to meet VA standards Provide and install additional power and data outlets Electrical wiring for medical booms Plumbing for missing or relocated fixtures Mechanical commissioning and final balancing for all existing equipment III. Phase 2 Area A (4th Floor) Phase 2 involves extensive interior construction across all disciplines. While demolition is mostly complete, much of the area remains in a rough-in condition, with exposed framing, unfinished finishes, and partially installed MEP systems. The AC-5 unit has not been installed; the contractor must provide and install the two missing sections. Major scope items include: Completion of partitions and gypsum board Installation of acoustic ceilings, lighting, doors, and hardware Millwork, painting, flooring, and other finishes New ductwork, grilles, diffusers, CV boxes, and controls Provide and install a new roof-mounted exhaust fan and ductwork (with associated electrical) serving Areas A & B Installation of new AC-5 ductwork Full electrical fit-out, including lights, controls, power, data, and fire alarm. Installation of new sprinkler heads and piping for all fixtures Plumbing piping for all new plumbing fixtures IV. Phase 2 Mechanical Room (5th Floor): The existing AC-5 unit shall be removed and replaced with a new unit. The contractor shall connect all steam, chilled water, drain piping, and electrical services, as well as modify or replace associated ductwork and controls. Additionally, new high-pressure steam lines shall be installed with PRV stations to convert to medium pressure, serving the existing 5th-floor air handling systems. Ensure the AHU 1 and AC-5 have cooled all year round for the off-season load. Tie in to both the 250-ton and the Primary chiller. Connect AHU-1 and AHU-5 to the 250-ton and Primary chiller, and provide details/design and design-build work to ensure year-round cooling. General Requirement: The Contractor shall furnish all labor, materials, tools, hardware, supervision, equipment, safety, drawing, rigging, permit, labelling, commissioning, and site visit necessary to perform the site preparation. At a minimum, the following shall be performed: Refer to the following attachment for detailed project information and requirements. Additional information can be found in the VA Technical Information Library (TIL) https://www.cfm.va.gov/til/spec.asp#26 : The Contractor shall furnish all labor, materials, tools, hardware, supervision, equipment, safety, drawings, rigging, permits, commissioning, and site visits necessary to perform the site preparation. At a minimum, the following shall be performed: The Contractor shall take all necessary precautions and safety measures to protect all patients and end users from all related activities. The Contractor, along with the facility, shall jointly lock out/tag out electrical power boxes that supply power to the unit. The Contract shall provide and install all electrical and piping connections by certified technicians in their trades. The Contractor shall test and verify all work to ensure proper operation. The Contractor must have OSHA training and specialized OSHA training. In the performance of all work, the workers must be in compliance with safety regulations governing worker safety (OSHA: 29 CFR 1926 Safety and Health Regulations for Construction; NFPA, Life Safety Codes, etc.). All work shall be done in accordance with NFPA, Life Safety, VA Standards and Regulations, VA Policy and requirements, OSHA regulations, and manufacturer specifications. The Contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation and repair will provide the capacities and characteristics specified. The contractor shall guarantee that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects shall be repaired by the contractor at his own cost. The Contractor shall, within that period, correct all defects in materials/workmanship within twenty-four (24) hours of being notified. The Contractor shall inform the government of any manufacturer s warranty that will exceed the one-year warranty the Contractor offers. A document shall have at a minimum the company, phone number, and the address where the government can obtain the manufacturer's information for an extended warranty. It is the responsibility of the contractor to verify all quantities, field conditions, and measurements prior to starting work. The contractor shall notify the CO/COR and VA Engineering Team of any differing site conditions prior to starting. The Contractor shall always provide an English-speaking working supervisor on-site when work is being performed and for the duration of this project. A supervisor must have a minimum of five (5) years of experience as a supervisor on five (5) projects like this. The Contractor shall provide his own storage for materials. The VA is not responsible for loss of tools, materials, equipment, etc. The Contractor shall post visible required warning signs and barriers prior to beginning any work. The Contractor shall be responsible for any damage caused by his employees. All damages shall be repaired and/or replaced at no additional cost to the government. The Contractor shall be responsible for the proper and safe removal and disposal of all debris. Contractors shall be required to provide tipping reports for the weights of construction waste recycled and landfilled. VA Directive 0063 requires 50% of waste to be prevented or recycled. The Contractor shall perform cleanup at any time when the work area becomes cluttered and/or restricts traffic. At a minimum, the Contractor shall clean the work area at the end of each work shift. The C&A requirements do not apply, and a Security Accreditation Package is not required. The Contractor is responsible for completing the VA Privacy and Information Security Awareness training. VA Patient Privacy and Network Infrastructure None of the equipment listed within this procurement package will access the VA Network or store any sensitive patient information. Any contractors who will come on-site for installation will not need access to the VA network. All contractors must comply with VA regulation and complete the following training: VA Privacy Training for Personnel without Access to VA Computer Systems or…

Version history

SAM.gov has posted 5 notices under solicitation 36C24226R0018, oldest first.

Go deeper on this solicitation

FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.

Open the AI analysis in FedSift →

Free forever plan — no credit card. Browse solicitations without an account; sign in for AI analysis and matching.

Market context: VA and NAICS 236220

About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.

  • In fiscal year 2026, VA obligated $3.2B across 1,174 contract actions under NAICS 236220.
  • 952 contracts worth $6.3B in this category end within the next 18 months.

VA contracts under NAICS 236220 →

Other open solicitations in NAICS 236220

All NAICS 236220 solicitations →

More from Department of Veterans Affairs

All VA solicitations →

Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.

FedSift turns SAM.gov and USASpending data into federal BD intelligence — smart matches, recompete radar, cited AI solicitation analysis and compliance matrices.

Source data: SAM.gov (solicitations) and USASpending.gov (awards), refreshed nightly. FedSift is not affiliated with the U.S. Government.

Pricing · Privacy · Terms · support@fedsift.app