J045--RFQ - BOILER REPAIR HUDSON VALLEY VAHCS - MONTROSE CAMPUS

Closed — responses were due 26 Aug 2026 · Small Business Set Aside - Total · Department of Veterans Affairs (VA) · Montrose, NY · NAICS 238220 · Solicitation 36C24226Q0816

Following NAICS 238220? Get new solicitations in it by email as they post — no account needed.

Email me new ones

A newer version of this notice has been posted. SAM.gov republished solicitation 36C24226Q0816 on 29 September 2026. This page is kept because it is a real record, but the current requirement, dates and attachments are on the latest version. Read the latest version →

What happened next

This solicitation has closed — responses were due 26 August 2026.

No award notice on SAM.gov yet. Not every award is posted there, so this does not mean it went unawarded.

Email me when the award is announced. One email, when SAM.gov posts the award notice. Not every award is posted there; if none appears within six months we'll tell you and stop. No account needed.

Solicitation details

Solicitation number36C24226Q0816
Notice ID0febc7b188e94c95927b20bc2bbeb759
AgencyDepartment of Veterans Affairs (VA)
Contracting office242-NETWORK CONTRACT OFFICE 02 (36C242)
NAICS code238220 — Plumbing, Heating, and Air-Conditioning Contractors
Product / service code (PSC)J045
Set-asideSmall Business Set Aside - Total
Notice typeCombined Synopsis/Solicitation
Posted21 August 2026
Response deadline26 August 2026 (closed)
Place of performanceMontrose, NY, USA

Get new NAICS 238220 solicitations by email

This one has closed. We'll email you when new NAICS 238220 (Plumbing, Heating, and Air-Conditioning Contractors) solicitations post — the first email lists what is open right now, then at most once a week, only when something new posts. No account needed; unsubscribe in a click.

Description

The purpose of this amendment to the solicitation is to: Extend response due date to 8/26/2026 Respond to questions. First set of questions: 1. Project Sequencing RFI 1 - Hydrostatic Test Sequence The Statement of Work requires hydrostatic testing of Boiler No. 2; however, the required timing of the test is not clearly defined. Establishing the condition of the boiler pressure boundary before burner work begins will reduce the risk of performing substantial work on a boiler that has not yet passed the required pressure test. Requested VA Response: Please confirm whether the hydrostatic test must be completed, witnessed, and accepted before burner replacement work or other irreversible modifications begin. If a different sequence is intended, please identify the required sequence. VA Response: The hydrostatic test must be completed, witnessed, and accepted before burner replacement work or other irreversible modifications begin. 2. Existing Safety and Equipment Conditions RFI 2 - Boiler No. 2 Main Steam Safety Valves The inspection information and field observations indicate that the two Boiler No. 2 main steam safety valves are leaking. Existing valve data also indicates that the valves are not properly sized under the VHA Boiler and Associated Plant Safety Device Testing Manual, 8th Edition (BEI) capacity criteria and are iron-bodied. The BEI 8th Edition calls for approximately 80% of boiler steam capacity at the lower set pressure and at least 100% at the higher set pressure; the proposed replacement valves are to have carbon-steel bodies. Requested VA Response: Please confirm whether the base contract is to include removal and replacement of both Boiler No. 2 main steam safety valves with properly sized carbon-steel, ASME-stamped and National Board-certified valves, including required installation and testing. If the work will be completed separately by the VA, please identify the required completion sequence. Please also confirm whether separate additive prices are requested for the same work on Boilers No. 1 and No. 3. Supporting Information: See Attachment A - Boiler No. 2 Main Steam Safety Valve Replacement. VA Response: The base contract does NOT include removal and replacement of both existing Boiler No. 2 main steam safety valves. This will be addressed on a separate contract. RFI 3 - Economizer Safety Relief Valves and Tube Leakage The available inspection information identifies deficiencies with the Boiler No. 2 economizer safety relief valves and leakage from the existing economizer tubes. These conditions may affect safe operation and final acceptance of the repaired boiler. Requested VA Response: Please confirm whether replacement of the economizer safety relief valves and repair of the leaking economizer tubes are included in the base contract or will be completed separately by the VA before Boiler No. 2 startup and acceptance testing. Supporting Information: See Attachment B - Boiler No. 2 Economizer Repair. VA Response: The base contract does NOT include the replacement of the economizer safety relief valves and repair of the leaking economizer tubes are included in the base contract. This will be addressed on a separate contract. The timeline of this repair is unknown at this time. If, by chance, the economizer repairs are NOT completed before Boiler No. 2 startup and acceptance testing, the required safety testing for the economizer in the VHA Boiler and Associated Plant Safety Device Testing Manual will be waived. RFI 4 - Forced Draft Motor Interlock Switches The existing Forced Draft Motor Interlock Switch (FDMIS) arrangement does not appear to satisfy the BEI 8th Edition testing requirements for independent current proving on all three motor phases and safe access for required functional testing. Requested VA Response: Please confirm whether correction of the Boiler No. 2 FDMIS deficiency is included in the base contract or will be completed separately by the VA before startup, commissioning, and BEI testing. Supporting Information: See Attachment C - Boiler No. 2 FDMIS Deficiency Correction VA Response: The base contract does NOT include the correction of the Boiler No. 2 FDMIS deficiency. 3. Propane and Controls Integration RFI 5 - Emergency Stop System Integration The new propane header must interface with the facility Emergency Stop system. The existing point of connection and E-stop controls cabinet could not be verified during the site visits, and the available drawings do not clearly identify the required interface. Requested VA Response: Please identify the existing E-stop system point of connection and provide any available control drawings. If no suitable point of connection exists, please confirm whether the contract is to include a new VA-compliant E-stop panel and all required system integration. Supporting Information: See Attachment D - Emergency Fuel Shutdown System. VA Response: There is no new E-Stop to be required to be installed on this contract. There are existing E-Stop buttons located in the plant (one in the control room, one on the Boiler Plant Master, and one on each boiler control panel) which will operate the propane valve. RFI 6 - Master Control Panel and SCADA Integration The propane header must interface with the existing Master Control Panel and SCADA system. During the walkthrough, MicroMod advised that the existing Master Control Panel has insufficient available I/O for the propane-system interface. MicroMod further advised that an upgraded Red Lion platform could be configured with the additional I/O and communications capability required for this integration. Requested VA Response: Please confirm whether the contract scope includes all required I/O hardware, Red Lion HMI or communications-platform upgrades, programming, graphics, and Master Control Panel/SCADA modifications necessary to provide a complete and operational propane-system interface. VA Response: Contractor shall furnish and install an electro mechanical gas shut off valve (Maxon or approved equal) upstream of the fuel pressure regulator and downstream of the gas filter/strainer to protect the downstream safety shut off valves. RFI 7 - Boiler No. 2 Human-Machine Interface During the recent walkthrough, it was observed that the Boiler No. 2 control cabinet no longer has a functional Human-Machine Interface (HMI). A working HMI is required to interface with the existing MicroMod loop controllers and to configure, monitor, start up, test, and commission the Boiler No. 2 combustion-control system. A direct hardware swap is not adequate because current Red Lion models do not duplicate the obsolete unit's side-button arrangement; the existing screens and graphics must be re-engineered and converted for the new display. Requested VA Response: Please confirm whether the contract scope will be revised to include furnishing, engineering, programming, graphics conversion, installation, integration, testing, and commissioning of a new Red Lion HMI compatible with the existing MicroMod loop controllers and associated boiler-control equipment. Supporting Information: See Attachment E - Boiler No. 2 HMI Replacement. VA Response: The VA will need more time to provide response 4. OEM Responsibilities RFI 8 - Victory Energy Scope Our interpretation is that Victory Energy's role is limited to OEM engineering support, interface review, refractory recommendations, and commissioning assistance, and does not include furnishing additional equipment or performing redesign services. Requested VA Response: Please confirm this interpretation or identify any additional equipment, engineering, onsite services, commissioning activities, or redesign responsibilities required from Victory Energy. VA Response: The Interpretation of Victory Energy s role is correct with the following clarifications (in bold). Victory Energy s role is limited to OEM engineering support, interface review and recommendations, refractory recommendations to include demolition and installation instructions and engineering details and shop drawings, and commissioning assistance, and does not include furnishing additional equipment or performing redesign services. Second set of questions: 1. Boiler #2 Touchscreen Item 1.f: The Boiler #2 touchscreen is currently missing. Please confirm whether a new touchscreen is required to be furnished and installed as part of the project scope. VA Response: A new touchscreen is NOT required to be furnished and installed as part of the project scope. 2. Combustion Tuning Item 1.e: Item 1.e states that the Contractor shall test all safety devices and tune the combustion on Boiler #2 using the testing methods specified in the VHA Boiler and Associated Safety Device Testing Manual, Eighth Edition. However, the Eighth Edition provides testing procedures for boiler safety devices but does not appear to prescribe methods or criteria for combustion tuning. Please clarify the required combustion tuning procedure, performance criteria, and…

Version history

SAM.gov has posted 8 notices under solicitation 36C24226Q0816, oldest first.

Documents in the solicitation package

20 files are attached to this notice.

  • 36C24226Q0816 0003.docx
  • Site Visit Conference Agenda - 36C24226Q0816.docx
  • 36C24226Q0816 0002.docx
  • 36C24226Q0816 0001.docx
  • 23 52 33 Water Tube Boilers edited.pdf
  • 23 08 11 Demonstrations and Tests for Boiler Plant edited.pdf
  • 23 21 11-Boiler Plant Piping - Edited.pdf
  • 620-10-118 Replace Boilers at Montrose AS-BUILTS reduced size -2.pdf
  • 620-10-118 Replace Boilers at Montrose AS-BUILTS reduced size - 1.pdf
  • ATTACHMENT E Location for Propane Tank.pdf
  • Attachment D - Field Devices To Be Replaced on Boiler 2.pdf
  • Attachment C - SAMPLE of Combustion Calibration Test Report.pdf
  • Attachment B - VA Standard Detail SD 235239-04.pdf
  • ATTACHEMENT A 23 21 11-Boiler Plant Piping.pdf
  • Past Performance Evaluation Questionnaire - 36C24226Q0222 GSA RFQ1790902.docx
  • LIMITATIONS ON SUBCONTRACTING CERTIFICATION.docx
  • Service Contract Act WD - 2015-4187.pdf
  • Davis-Bacon Act WD - NY20260001.pdf
  • 620-26-203 Boiler 2 Repair - Statement of Work FINAL 2026_07_23.docx
  • 36C24226Q0816_1.docx

Download all 20 files as one ZIPFree account, no credit card.

Reading them for requirements? FedSift turns the package into a compliance matrix — every requirement with the page it came from, exportable to Excel.

Or download them one at a time from SAM.gov.

Go deeper on this solicitation

FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.

Open the AI analysis in FedSift →

Free forever plan — no credit card. Browse solicitations without an account; sign in for AI analysis and matching.

Market context: VA and NAICS 238220

About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.

  • In fiscal year 2026, VA obligated $311.6M across 692 contract actions under NAICS 238220.
  • 319 contracts worth $471.2M in this category end within the next 18 months.

VA contracts under NAICS 238220 →

Other open solicitations in NAICS 238220

All NAICS 238220 solicitations →

More from Department of Veterans Affairs

All VA solicitations →

Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.

FedSift turns SAM.gov and USASpending data into federal BD intelligence — smart matches, recompete radar, cited AI solicitation analysis and compliance matrices.

Source data: SAM.gov (solicitations) and USASpending.gov (awards), refreshed nightly. FedSift is not affiliated with the U.S. Government.

Pricing · Privacy · Terms · support@fedsift.app