Inactive on SAM.gov — responses were due 14 Apr 2026 · Service-Disabled Veteran-Owned Small Business Set Aside · Department of Veterans Affairs (VA) · Queens, NY · NAICS 236220 · Solicitation 36C24226B0045
Following NAICS 236220? Get new solicitations in it by email as they post — no account needed.
A newer version of this notice has been posted. SAM.gov republished solicitation 36C24226B0045 on 15 April 2026. This page is kept because it is a real record, but the current requirement, dates and attachments are on the latest version. Read the latest version →
What happened next
SAM.gov marked this notice inactive — responses were due 14 April 2026.
No award notice on SAM.gov yet. Not every award is posted there, so this does not mean it went unawarded.
Email me when the award is announced. One email, when SAM.gov posts the award notice. Not every award is posted there; if none appears within six months we'll tell you and stop. No account needed.
This one has closed. We'll email you when new NAICS 236220 (Commercial and Institutional Building Construction) solicitations post — the first email lists what is open right now, then at most once a week, only when something new posts. No account needed; unsubscribe in a click.
Description
Project Number: 630A4-25-200 Project Title: Refurbish & upgrade the laundry ventilation system at St. Albans Scope of work Performance Period: 240 CALENDAR DAYS FROM NTP Description of Work: Provide refurbish and part equivalent replacement of existing four HV Units and 7 Exhaust fans serve the laundry operation and small capacity AC units for the staff breakrooms to support the laundry building 173 located at the Veterans Affairs Medical Center,179-00 Linden Blvd, Jamaica, NY 11425 in accordance with manufacturer specifications and VA specifications at http://www.cfm.va.gov/til/specs.asp. Work shall meet all VA design guidelines and requirements. This work shall include, but not be limited to, all necessary labor and Materials to perform all Mechanical, electrical, Plumbing, and other related trade work for a complete restoration and functional system. The contractor will perform a mandated walkthrough to verify the site condition and notify the Contractor Officer during the bidding process of any observations and comments not included in the following outlined SOW below: HV-1 Provide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements. Provide all necessary labor and materials to conduct full cleaning, repair, and/or replacement of the interior components and lubrication. Provide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper. Provide all necessary labor and materials to install new filters Provide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control. Provide all necessary labor and materials to install the new fire damper/automatic damper as required. Replace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD Provide and install a new digital local control system interlocked with the exhaust system and the space temperature. HV-2 Provide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements. Provide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication. Provide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper. Provide all necessary labor and materials to install new filters Provide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control. Provide all necessary labor and materials to install the new fire damper/automatic damper as required. Replace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD Provide and install a new digital local control system interlocked with the exhaust system and the space temperature. HV-3 Provide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may provide new fan array sections comprising a high-efficiency array with direct-drive motors and a VFD to reduce operating power while providing system redundancy and reduced maintenance requirements. Provide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication. Provide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper. Provide all necessary labor and materials to install new filters Provide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control. Provide all necessary labor and materials to install the new fire damper/automatic damper as required. Replace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD Provide and install a new digital local control system interlocked with the exhaust system and the space temperature. HV-4 Provide all necessary labor and material to replace the 30/40 HP motors and Fans with all necessary parts, frames, and accessories. The contractor may Provide new fan array sections consisting of high-efficiency, direct-drive motors and VFDs to reduce operating power while providing system redundancy and reduced maintenance requirements. Provide all necessary labor and materials to conduct full cleaning, replacement of the interior components, and lubrication. Provide all necessary labor and material to conduct a full cleaning and/ or replacement of the interior components and lubrication of the outside air damper. Provide all necessary labor and materials to install new filters Provide all necessary labor and materials to install a new preheat and reheat heating coils, control valve, and thermostat for space control. Provide all necessary labor and materials to install the new fire damper/automatic damper as required. Replace the main electrical breaker for the HV unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD Provide and install a new digital local control system interlocked with the exhaust system and the space temperature. Furnish and install new variable frequency drives (VFDs) for exhaust fans E- 1,2; GX-1,2,3,4, and 5. Exhaust fans GX 3,4, and 5 are located on the upper roof; exhaust fans GX 1 and 2 are located on the lower roof. Exhaust fan E-1 is in MER1, and Exhaust fan E-2 is in MER2. Exhaust Fans Refurbish existing exhaust fans, GX-1, 2, 3, 4, 5, E1 and E2. Replace existing motors with new NEMA premium-efficiency inverter-duty motors and install a new variable-speed drive. Replace bearings and seals. Install new sealant on the ductwork seams. Install new access doors. Install new motorized dampers. Replace filters on roof exhaust fans GX-1, 2, 3, 4, 5, and exhaust fans E1 and E2. Exhaust fans GX 3, 4, and 5 are located on the upper roof; GX 1 and 2 are located on the lower roof. Exhaust Fan E-1 is in MER1, and Exhaust Fan E-2 is in MER2. Replace the main electrical breaker for each unit at the MCC panel located in the same mechanical room, along with the unit breaker and the VFD Piping and devices Replace the existing steam PRV station (High to Mid) Replace the existing relief valve on the expansion/Flash Tank in MER 1. Replace all steam and condensate piping, fittings, valves, F&T traps, and all necessary items to connect to the new Steam coils. AC units Remove and replace AC 2 & ACCU1 with a new equivalent split system, including all necessary installation work, materials, and activation. Remove and replace AC 1 with a new equivalent package unit, including all the necessary installation work, materials, and activation Painting Sandblast and paint the structural steel for GX 1,2,3,4 and 5. Clean and epoxy paint the mechanical room floors. General Requirement: The Contractor shall furnish all labor, materials, tools, supervision, equipment, and safety necessary to perform the site preparation. At a minimum, the following shall be performed: The Contractor shall take all necessary precautions and safety measures to protect all patients and end users from all related activities. The Contractor shall repair all walls and interior damage related to the site preparation. The Contractor shall repair all demolition and openings necessitated to perform the repair. The Contractor shall test and verify all work to ensure proper operation. The Contractor must have OSHA training and specialized OSHA training. In the performance of all work, the workers must be incompliance with safety regulations governing worker safety (OSHA: 29 CFR 1926 Safety and Health Regulations for Construction; NFPA, Life Safety Codes, etc.). All work shall be done in accordance with NFPA, Life Safety, VA Standards and Regulations, VA Policy and requirements, OSHA regulations, and manufacturer specifications. The Contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation and repair will provide the capacities and characteristics specified. The contractor shall guarantee that if, during a period of one year from the date of the certificate of completion and acceptance of the…
Version history
SAM.gov has posted 3 notices under solicitation 36C24226B0045, oldest first.
FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.