FedSift Sign inSign up free

Solicitations › Department of Veterans Affairs

Z1DA--554-26-106 Replace DW Valves.

Closed — responses were due 30 Sep 2026 · Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) · Department of Veterans Affairs (VA) · Aurora, CO · NAICS 238220 · Solicitation 36C25926R0057

Following NAICS 238220? Get new solicitations in it by email as they post — no account needed.

Email me new ones

Solicitation details

Solicitation number36C25926R0057
Notice IDb48cd3cd3bdd4fd289f14c78aa10197f
AgencyDepartment of Veterans Affairs (VA)
Contracting officeNETWORK CONTRACT OFFICE 19 (36C259)
NAICS code238220 — Plumbing, Heating, and Air-Conditioning Contractors
Product / service code (PSC)Z1DA
Set-asideService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice typeSolicitation
Posted15 September 2026
Response deadline30 September 2026 (closed)
Place of performanceAurora, CO, USA

Description

N AMENDMENT TO SOLICITATION 36C25926R0057 POSTED ON SEPTEMBER 15, 2026. The purpose of this amendment is to : To extend due date for proposals from September 16, 2026, to September 30, 2026, at 10 AM. MT. RFI s will be responded in a second amendment at later date before proposals due date. To post site visit documents : All offers please email them to Elia L Ruiz Manzo at Elia-Laritza.Ruiz-Manzo@va.gov. All other items and conditions remain the same. List of Attachments See attached document: Site Visit Meeting Doc. See attached document: Site Visit Attendance_FE. ---------------------------------------------------------------------------------------------------------------------------------------------------------- OBJECTIVE The Department of Veterans Affairs has a requirement to install valves on water supply lines to enable individual building isolation from the campus water supply at the Rocky Mountain Regional VA Medical Center. Facility Management Services has identified approximately 30 valves on domestic cold water, domestic hot water, and domestic hot water return that require valve installation or valve replacement. The intent of this contract is to install isolation shutoff valves on the domestic cold water (DCW), domestic hot water (DHW), and domestic hot water recirculation (DHWR) pipes at key points to allow facilities maintenance to control water flow to individual buildings. STATEMENT OF WORK In phase 1, the contractor shall: For Building A: Coordinate an 8 hour water shutoff with the COR. This shutdown will likely be scheduled weekday-overnight or weekend-daytime. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation scenario. Re-insulate installed pipe sections. Pipe, valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. For Building E: Coordinate an 8 hour water shutoff with the COR. This shutdown will likely be scheduled weekday-overnight or weekend-daytime. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation scenario. Re-insulate installed pipe sections. Pipe, valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. For Building G: Coordinate an 8 hour water shutoff with the COR. This shutdown will likely be scheduled on a Sunday. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation scenario. Re-insulate installed pipe sections. Pipe, valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. For Building D+F: Coordinate an 8 hour water shutoff with the COR. This shutdown shall be a double install with two crews to accomplish a shutdown and valve install happening simultaneously and will likely be scheduled weekday-overnight or weekend-daytime. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation scenario. Re-insulate installed pipe sections. Pipe, valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. For Building B: Coordinate an 8 hour water shutoff with the COR. This shutdown will likely be scheduled overnight. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation scenario. Re-insulate installed pipe sections. Pipe, valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. For Building H: Coordinate an 8 hour water shutoff with the COR. This shutdown will likely be scheduled overnight. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation scenario. Re-insulate installed pipe sections. Pipe, valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. For Building K: Coordinate an 8 hour water shutoff with the COR. This shutdown will likely be scheduled overnight. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation scenario. Re-insulate installed pipe sections. Pipe, valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. For Canteen: Coordinate an 8 hour water shutoff with the COR. This shutdown will likely be scheduled overnight. The DCW/DHW/DHWR shutoffs shall be accomplished using dual ice plugs on each pipeline. The contractor shall position the ice plugs such that a mid-section of pipe can be removed and replaced with a pre-built pipe section that includes a shutoff valve. Ensure the pre-built section and installation effort are conducted at an appropriate cleanliness level for domestic water supply. Install the pre-built pipe section and utilize pipe connections that are grooved coupling or flange as appropriate for the use-case and installation scenario. Re-insulate installed pipe sections. Pipe, valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. In Phase 2, the contractor shall: For Building L: Install a valve on the DCW B-feed . Existing valves on the pipe allow for isolation of this pipe without a campuswide shutdown. Coordinate an 8 hour campuswide water shutdown. Valves in Phase 1 shall be used to hold the buildings full during the shutdown. Install valves on the remaining DCW and DHW lines. Ensure the installation effort is conducted at an appropriate cleanliness level for domestic water supply. Valve, and connection/coupler material and sizes shall be appropriate for the use-case and installation scenario. Re-insulate affected pipes/valves. 3.0 GENERAL: All work performed under this contract shall conform to all VA drawings, specifications, standards, as well as OSHA, AIA Construction Guidelines, Joint Commission Environment of Care Standards, and other…

Version history

SAM.gov has posted 5 notices under solicitation 36C25926R0057, oldest first.

Documents in the solicitation package

10 files are attached to this notice.

Download all 10 files as one ZIP Free account, no credit card.

Reading them for requirements? FedSift turns the package into a compliance matrix — every requirement with the page it came from, exportable to Excel.

Or download them one at a time from SAM.gov.

Go deeper on this solicitation

FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.

Open the AI analysis in FedSift →

Free forever plan — no credit card. Browse solicitations without an account; sign in for AI analysis and matching.

Market context: VA and NAICS 238220

About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.

VA contracts under NAICS 238220 →

Other open solicitations in NAICS 238220

All NAICS 238220 solicitations →

More from Department of Veterans Affairs

All VA solicitations →

Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.