FedSift

SolicitationsTRANSPORTATION, DEPARTMENT OFNAICS 541380

Laboratory Analysis - Phase II Environmental Site Assessment - Royal Electric Yard, Sykesville, MD

TRANSPORTATION, DEPARTMENT OF · Solicitation 6913G626Q300049 · NAICS 541380 · Unrestricted (full and open)

Solicitation details

Solicitation number6913G626Q300049
Notice IDe282447295144da185f60a93a3259907
AgencyTRANSPORTATION, DEPARTMENT OF
Sub-tierOFFICE OF THE SECRETARY
Contracting office6913G6 VOLPE NATL. TRANS. SYS CNTR
NAICS code541380
Product / service code (PSC)F999
Set-asideUnrestricted (full and open)
Notice typeAward Notice
Posted26 August 2026
Response deadlineNot stated
Place of performanceSaint Paul, MN, USA

Description

INTRODUCTION: Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the U.S. Environmental Protection Agency (EPA) Targeted Brownfields Assessments (TBA) Program. As part of this effort, a Phase II Environmental Site Assessment (ESA) that includes a requirement for laboratory analysis will be conducted at the Royal Electric Yard (the Site) located at 7512 Main St, Sykesville, Maryland 21784. BACKGROUND: The objective of this Phase II ESA is to determine if the historical activities have impacted soil at the Site. Laboratory analytical data from soil samples obtained through the advancement of test pits and soil borings will be compared to the Soil Residential Clean-up and Protection of Groundwater Standards established by Maryland Department of the Environment s Cleanup Standards for Soil and Groundwater Table 1 (October 2018). TASKS TO BE PERFORMED: The Phase II ESA investigation includes the Contractor tasks listed below. The Contractor shall conduct all work in accordance with Federal, State and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirements. 1) Sample Containers, Handling, and Delivery: The Contractor shall provide the appropriate sample containers, disposable volatiles samplers, preservatives, pre-printed labels, and analyte-free water required for the analyses listed below. These are to be delivered by the Contractor to the project site location. Sample collection and handling will be performed by Volpe personnel. The laboratory shall provide a daily local courier to transport the samples from the Site to the laboratory over an anticipated three days of sampling. Whenever possible, the Contractor shall minimize the number of sample containers by combining compatible analyses into a single container, as allowed by EPA methods and laboratory standard operating procedures. 2) Sample Analysis: The Contractor shall conduct analysis on samples for the parameters listed below in Table 1. The Contractor and any subcontracted laboratories must be certified by PADEP for each analytical method being performed.

Go deeper on this solicitation

FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.

Open the AI analysis in FedSift →

Free forever plan — no credit card. Browse solicitations without an account; sign in for AI analysis and matching.

Other open solicitations in NAICS 541380

All NAICS 541380 solicitations →

More from TRANSPORTATION, DEPARTMENT OF

All TRANSPORTATION, DEPARTMENT OF solicitations →

Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.