Solicitations
› STATE, DEPARTMENT OF
Addition/Relocation of Potable Water and Sewer Lines Temporary, Bern, Switzerland
STATE, DEPARTMENT OF · Solicitation MPR0611888 · Unrestricted (full and open) · Closed
This solicitation has closed.
Responses were due 20 August 2026.
The record stays published because closed procurements are what a recompete is
built from — the follow-on is typically solicited 6–18 months before the
incumbent contract ends. Open solicitations like this one are linked below.
Solicitation details
| Solicitation number | MPR0611888 |
|---|
| Notice ID | f9ded114619e4160910a538a6e9d2d9e |
|---|
| Agency | STATE, DEPARTMENT OF |
|---|
| Sub-tier | STATE, DEPARTMENT OF |
|---|
| Contracting office | U.S. EMBASSY BERN |
|---|
| Set-aside | Unrestricted (full and open) |
|---|
| Notice type | Sources Sought |
|---|
| Posted | 07 August 2026 |
|---|
| Response deadline | 20 August 2026 (closed) |
|---|
| Place of performance | Bern, CHE |
|---|
Description
STATEMENT OF WORK 1. Utility Relocation Services Bern, Switzerland Aug 2026 2. STATEMENT OF WORK for RELOCATION AND EXTENSION OF POTABLE WATER AND SEWER LINES EAST OF CHANCERY United States Embassy Bern, Switzerland Aug 2026 3. 1.1 PROJECT DATA A. Project Title: Addition/Relocation of Potable Water and Sewer Lines East of Chancery, in Support of Temporary Construction Offices, Bern, Switzerland B. Project Location: Primary work location is the area east of the U.S. Embassy (Chancery Building) in Bern, where temporary construction offices will be sited during the related Selective Improvement Project (SIP) construction period. 4. 1.2 PROJECT SCOPE A. The U.S. Government leases the Chancery in Bern. The U.S. Government requires the addition and/or relocation of existing potable water lines and sanitary sewer lines to a new alignment east of the Chancery to serve temporary construction offices to be installed in that area in support of the Bern SIP construction effort to be carried out by the Department of State Bureau of Overseas Building Operations (OBO) using an American Contractor. B. Contractor is responsible for providing complete surveying, design, and installation/relocation services necessary to meet the requirements of this contract within established schedules. Services may include, but are not limited to: field survey, utility mapping, civil/site engineering, plumbing design, trenching and excavation coordination, pipe material specification, connection detailing, backflow prevention, and restoration of disturbed surfaces. Services must comply with Swiss, American, and International standards and codes as listed below. C. Contractor shall provide the following types of services: 1. Type A. Survey and Field Verification. Contractor shall conduct a field survey to verify existing conditions, including the location, depth, size, material, and condition of existing potable water and sewer lines in the vicinity of the Chancery. Contractor shall verify dimensions and required length of extension/relocation to reach the temporary construction office area east of the Chancery. Contractor shall document existing utility tie-in points, elevations, and any conflicts with other subsurface utilities or structures. Contractor shall prepare a survey report with findings, including a utility location plan (plan and profile drawings) and photographic documentation. 2. Type B. Design Services. In accordance with Swiss and American plumbing, civil, and life safety codes and standards, Contractor shall prepare design and construction documents (statements of work, drawings, and specifications) for the addition and/or relocation of potable water and sewer lines to the east Chancery temporary construction office location. Design shall include pipe sizing, material selection, slope/grade calculations for gravity sewer lines, pressure calculations for potable water lines, connection details to existing mains, and any required backflow prevention or cross-connection control devices. Design services may include preliminary conceptual sketches and final construction drawings following American Institute of Architects (AIA) standards, utilizing AutoCAD, with specifications written in the most recent Construction Specification Institute (CSI) format. Contractor shall develop construction cost estimates (materials, labor, and equipment) based on verified quantities and the extension length determined during survey. Contractor must verify existing site conditions prior to finalizing design. Contractor shall prepare documents for permit review and submission to the U.S. Department of State, OBO, and local Swiss authorities, if required by code. Contractor shall respond to permit review comments and revise design and construction documents based on review comments and requirements from the Facilities (FAC) office. 3. Type C. Construction/Installation Coordination. Contractor shall coordinate installation of the new/relocated potable water and sewer line segments, including excavation, pipe-laying, backfill, compaction, and surface restoration, ensuring minimal disruption to Chancery operations and existing site utilities. Contractor shall test all new potable water lines for pressure integrity and disinfect per applicable code prior to connection, and test sewer lines for proper flow and leak-tightness prior to backfilling. 5. 1.3 GENERAL REQUIREMENTS A. Building Codes 1. Design of this project is governed by Swiss and American construction, plumbing, and life safety codes and standards such as the Swiss Water and Sewer Code (RAS), Swiss Electrical Code (RETIE) where relevant to any conduit relocation, IBC (International Building Code), International Plumbing Code (IPC) principles, ASHRAE (American Society of Heating, Refrigerating and Air-conditioning Engineers), NFPA (National Fire Prevention Association), Americans with Disabilities Act of 1990 (ADA), Architectural Barriers Act of 1968 (ABA), and Department of State Bureau of Overseas Buildings Operations (OBO) design standards. 2. In cases where the Host Country Code is more stringent, the Contractor shall submit a Request for Information (RFI) to the Contracting Officer's Representative (COR) and/or Government Technical Monitor (GTM) for resolution. B. The services provided are a multi-discipline effort requiring civil, plumbing, and surveying expertise. The Contractor shall provide the services of a fully trained and experienced team of professional surveyors and engineers to complete the requirements within this Statement of Work (SOW). C. The use of sub-consultants must be reviewed and approved in advance by the U.S. Government. The U.S. Government may review the qualifications of any proposed sub-consultant. D. Project Budget: Contractor shall provide services within the budget established in each task order. E. Drawing Format and CADD 1. All project documents shall be in "hard metric." 2. Computer-aided design and drafting (CADD), compatible with AutoCAD LT2018, is required for all portions of this project. 3. All drawings, specifications, cost estimates, and other portions of submittals shall be prepared in English. F. Meetings 1. The Contractor shall prepare a detailed written record of all conferences and meetings with the COR/GTM related to the Project. 2. Confirmation of telephone conversations in which decisions affecting the project are made shall also be prepared in writing. 3. Copies of these records shall be submitted to the COR/GTM within five calendar (5) days of the event. 4. The written format established by the Contractor for these records shall be subject to the approval of the COR/GTM. 5. Each record shall conclude with the following statement: "The matters reported in this document are considered by the (insert name of Contractor here) to be within the scope of this contract as presently priced, except for (Contractor to identify items or state 'none') as further described below." 6. 1.4 CONSTRUCTION AND DESIGN DOCUMENT REQUIREMENTS A. General Requirements 1. Design must be consistent with Embassy standards, materials, and design used in other offices and spaces of the compound when applicable. 2. The Contractor shall provide submittals for review prior to submission to authorities, and prior to any re-submission to authorities for final approval. 3. A minimum review time of two (2) weeks will be required after each of these submittals. The Contractor shall only proceed with design work during the review periods with written approval from the U.S. Government COR and/or GTM. 4. As required by City of Bern, a final construction permit document submittal shall be required that incorporates all the review comments from the previous submittals. OBO and American Embassy Bern will complete a backcheck review of the final construction documents. 5. Review Comments a. The Contractor shall incorporate all review comments into the design and return all annotated material with the next submission. b. Comments not accepted by the Contractor shall be brought to the attention of the Contracting Officer (CO) through the COR in writing immediately for resolution. Decisions of the CO with respect to incorporation of comments considered within the SOW of this contract will be final. Review comments recognized by OBO as requiring actions outside this SOW will require contract modification, and no work on them shall be initiated until a Notice To Proceed (NTP) is issued by the CO. The Contractor shall provide, in booklet form, one (1) copy of all comments and the actions taken in response to the comments. 6. Project Design Schedule a. Phase: Survey and Field Verification; Duration: two (2) weeks after Notice to Proceed; Due Date: To Be Determined. b. Phase: Initial Draft of Permit/Design Documents; Duration: two (2) weeks after completion of survey; Due Date: To Be Determined. c. Phase: Government Review; Duration: two (2) weeks after receipt of Initial Draft Permit Application Documents; Due…
Go deeper on this solicitation
FedSift reads the full solicitation package — every attachment — and pre-extracts
the compliance matrix, evaluation factors, key risks, win themes and
deal-breakers, each with a verbatim quote and the exact PDF page it came from. It
scores the opportunity against your company profile, tells you whether to bid as
prime or sub, and ranks teaming partners who could close your gaps.
Open the AI analysis in FedSift →
Free forever plan — no credit card.
Browse solicitations without an account; sign in for AI analysis and matching.
More from STATE, DEPARTMENT OF
- Supply Truck Cabin Chassis (suitable for 10,000-liter Water tanker)STATE, DEPARTMENT OF · Due 12 September 2026
- Guatemala - Semi-Permanent AwningSTATE, DEPARTMENT OF · Due 12 September 2026
- Praia - 2026 Toyota HiAce 2.8L GL High Roof or Equivalent - 19CV1026Q0009STATE, DEPARTMENT OF · Due 13 September 2026
- Residential Electrical Distribution and backup power system upgrade for U.S. Embassy Quito at Government Owned Residential compound ZibaSTATE, DEPARTMENT OF · Due 14 September 2026
- 3dB Labs Monarch Fly Away Kit, Software Licensing, Support/Maintenance, and Instructor-Led TrainingSTATE, DEPARTMENT OF · Due 14 September 2026
- Inspection and Repair of Fuel Tanks at the U.S. Embassy Baku, AzerbaijanSTATE, DEPARTMENT OF · Due 14 September 2026
- HAARP large scale blast testing and fragmentation characterizationSTATE, DEPARTMENT OF · Due 14 September 2026
- Supply of 1 LARGE CARGO VAN L3 - H3 in Rome, Italy.STATE, DEPARTMENT OF · Due 14 September 2026
All STATE, DEPARTMENT OF solicitations →
Source: this notice on SAM.gov.
FedSift republishes public federal procurement data and is not affiliated with
the U.S. Government. Always confirm dates and requirements against SAM.gov
before responding.