Solicitations › Department of Defense › Department of the Army
10-foot Hydraulic Press Brake
Closed — responses were due 23 Sep 2026 · Small Business Set Aside - Total · Department of the Army, DoD · Great Falls, MT · NAICS 333517 · Solicitation W50S7L-26-Q-A004
This solicitation has closed.
Responses were due 23 September 2026.
The record stays published because closed procurements are what a recompete is
built from — the follow-on is typically solicited 6–18 months before the
incumbent contract ends. Open solicitations like this one are linked below.
Solicitation details
Description
Amendment 4 The purpose of this amendment is to extend the date to receive offers by 2 days, from 21 September 2026 10:00AM MST to 23 September 2026 10:00AM MST. This will also update a previous answer to the question below. Offloading Equipment: Is there an onsite forklift of sufficient capacity available for use in offloading and positioning the machine, or should the rigging contractor provide all required forklift/crane equipment? Yes, the installation has a forklift with sufficient capacity that will be available for use, 10k and 15k. End Amednment 4 Amednment 3 The purpose of this amendment is to extend the date to receive offers by 4 days, from 17 September 2026 10:00AM MST to 21 September 2026 10:00AM MST. This will also change the title description of the procurement. End Amednment 3 Update 5 The purpose of this amendment is to provide answers to questions that have been received up to 9/16/2026. 1. I can quote this but they need to give us specific information about multi-V bottom die set with quick-release clamping . They need to give specifics about the V die openings they want in the multi V and they need to specifically tell us all the material thicknesses (from thinnest to thickest) they want to form with this multi V die set. Please refer to question 1 under Amendment 3. End Update 5 Update 4 The purpose of this amendment is to provide answers to questions that have been received up to 9/15/2026. 1. I recommend the R-axis which can set the height of the back gauge fingers from the control or the program made by the operator This saves time and enhance factory safety Government prefers 4+1 Axis(Y1, Y2, X, R, and V for crowning. 2. You indicate that the bid is under the Buy American Act, but then you say it is set aside for 1009, Small Business Enterprise. We are a small business and would be offering a machine made in Turkey with the final assembly in the U.S. Before we spend a lot of time on this bid, please confirm if made in Turkey is acceptable. Yes, equipment from Turkey is acceptable. As a NATO ally, Turkey is a designated DFARS Qualifying Country (DFARS 225.872-1). Under DoD regulations (DFARS 252.225-7001), qualifying country end products are evaluated on an equal basis with domestic products under the Buy American Act. 3. In our many years of offering and delivering equipment to U.S. government, which we supply from our factories, we also prefer to work with the owner/bidding authority to get the name of local rigors and electricians. If you could provide this information, it would be helpful. We do not want to receive the PO and pick a sub for these activities with whom you may have had a bad experience. No, the Government cannot provide names or recommendations. Recommending specific private vendors violates federal procurement neutrality and ethics rules (FAR 3.101-1). Base electrician will perform connection services. 4. In your responses, you talk about what your material thicknesses are and what type of punches and dies you need. What are the required V opening sizes for the multi-V dies? Please provide specs. The required V-opening size for a multi-V die is generally calculated by multiplying the actual material thickness by 8 for standard mild steel, known as the "Rule of Eight". Multiplier Guidelines by Material Thin materials (? 3 mm): Multiply thickness by 6 to 8. Mid-range mild steel (3 mm to 12 mm): Multiply thickness by 8. Heavy plate (> 12 mm): Multiply thickness by 10 to 12. Aluminum: Multiply thickness by 5 to 6. Stainless steel: Multiply thickness by 10 to 12. High-strength steel: Multiply thickness by 12 to 15 5. You also have a question regarding punch dimensions. To me, your specs are not clear as to what specified tooling you require to be in the bid in a number of instances. As is the case with us, the manufacturer provides a punch and matching die, whether single opening or 4-way. This combination would not work for what you list. When you list specific tip working angles of 30..90 as a gooseneck punch, this is generally a special tool. With many specifications, we can certainly provide anything that is offered in the industry standards. Please provide clarification. Basically we are looking for the general tooling, we won t know what specifics we will need until we have the machine and start working material. End Update 4 Amendment 2 The purpose of this amendment is to provide answers to questions that have been received up to 9/13/2026 and to change the required delivery date on CLIN 0001/0002 to 31 January 2026. Does any wage determination, prevailing wage schedule, Service Contract Labor Standards requirement, certified payroll requirement, or contractor trade-license requirement apply to CLIN 0002? No, it does not apply The requirement calls for certified heavy machinery riggers, while Amendment 4 states that riggers will need Real ID for facility access. Is any specific rigger certification or license required in addition to the Real ID and EAL access requirements? No specific rigger certifications or licenses are required Our understanding of Amendment 4 is that the on-site installation electrician will perform the final electrical connection, and that the contractor/manufacturer should not include facility-side electrical wiring to the disconnect/panel. Please confirm. The on-site electrician will perform the final connection The solicitation pricing schedule lists CLIN 0002 as quantity 1, unit EACH, while the current notice description identifies CLIN 0002 as quantity 1 Job (JB). Which unit should quoters use on the completed pricing schedule? Each or Job is acceptable as long as the quantity is 1 (one) We have a machine option that meets the technical as well as DFAR requirements, however, the manufacturer is currently quoting approximately 14 16 weeks for delivery. Is November 30 a firm required delivery date, or would the Government consider an otherwise compliant offer with a delivery date beyond November 30 (approximately 1 month later)? The November 30 delivery date is the Government's preferred delivery target; however, it is not a mandatory pass/fail technical threshold. The Government will consider and evaluate technically compliant quotes that propose a firm delivery and installation completion date on or before December 31. Offerors must explicitly state their best realistic delivery lead time (in weeks after receipt of order) within their technical proposal, which will be binding upon contract award. End Amendment 2 Update 3 The purpose of this amendment is provide answers to questions that have been received up to 9/10/2026. The solicitation includes FAR 52.225-3/52.225-4 and provides for identification of Other Foreign End Products ; however, the solicitation also states that the offered machine must be manufactured in the United States, a DFARS qualifying country, or a TAA-compliant country. Please confirm whether an end product manufactured in China may be offered and evaluated under FAR 52.225-3, or whether Chinese-origin equipment is specifically excluded from consideration. Equipment manufactured in the People's Republic of China (or any other non-qualifying, non-TAA compliant country) is SPECIFICALLY EXCLUDED from consideration and will be evaluated as TECHNICALLY UNACCEPTABLE. Can you provide more details on the electrical run. Conduit type, for instance. Will it be overhead or along a wall? Is a scissor lift required for electrical install? In the RFQ, it stated that the government would wire to a disconnect and only the final connections would need to be made. The additional information provided, seems to contradict the RFQ by stating that the electrical would be run from the main panel? Conduit is in the floor, installation electrician is on site, electrical panel is 35-40 ft away. Does the electrician need special certifications to work onsite? Installation electrician is on site Also, for the riggers, do they need special certifications to work onsite? They will need a Real ID to get on base. Electrical Connection: Further clarification is needed. Please confirm that the Government/end user will provide the electrical drop, disconnect, and required electrical connection so that the machine can be connected and placed into service at installation. By law, the manufacturer or rigging contractor cannot perform electrical wiring. Installation Electrician will be on site to connect power Facility Access: Please advise what credentials or forms of identification will be required for the freight carrier, rigging crew, manufacturer s technician, and/or trainer to enter the facility. Real ID is required along with an EAL Offloading Equipment: Is there an onsite forklift of sufficient capacity available for use in offloading and positioning the machine, or should the rigging contractor provide all required forklift/crane equipment? Yes Startup/Test Bend: The solicitation requires a live test bend using Government-furnished material. Please confirm that the…
Version history
SAM.gov has posted 10 notices under solicitation W50S7L-26-Q-A004, oldest first.
Documents in the solicitation package
2 files are attached to this notice.
- Solicitation Amendment W50S7L26QA0040004 SF 30.pdf
- Solicitation Amendment - W50S7L26QA0040004.pdf
Download them from SAM.gov, or open the solicitation in FedSift to read them with page-cited analysis.
Go deeper on this solicitation
FedSift reads the full solicitation package — every attachment — and pre-extracts
the compliance matrix, evaluation factors, key risks, win themes and
deal-breakers, each with a verbatim quote and the exact PDF page it came from. It
scores the opportunity against your company profile, tells you whether to bid as
prime or sub, and ranks teaming partners who could close your gaps.
Open the AI analysis in FedSift →
Free forever plan — no credit card.
Browse solicitations without an account; sign in for AI analysis and matching.
Market context: DoD and NAICS 333517
About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.
- In fiscal year 2026, DoD obligated $135.2M across 209 contract actions under NAICS 333517.
- 62 contracts worth $160.9M in this category end within the next 18 months.
DoD contracts under NAICS 333517 →
Other open solicitations in NAICS 333517
All NAICS 333517 solicitations →
More from Department of Defense
All DoD solicitations →
Source: this notice on SAM.gov.
FedSift republishes public federal procurement data and is not affiliated with
the U.S. Government. Always confirm dates and requirements against SAM.gov
before responding.