FedSift

Solicitations › Department of Defense › Department of the Army

140-ton 10-foot Hydraulic Press Brake

Closed — responses were due 17 Sep 2026 · Small Business Set Aside - Total · Department of the Army, DoD · Great Falls, MT · NAICS 333517 · Solicitation W50S7L-26-Q-A004

Solicitation details

Solicitation numberW50S7L-26-Q-A004
Notice IDd0376d1303b64fa2870fb98803fb46de
AgencyDepartment of Defense (DoD)
Sub-agencyDepartment of the Army
Contracting officeW7NK USPFO ACTIVITY MTANG 120
NAICS code333517 — Machine Tool Manufacturing
Product / service code (PSC)3441
Set-asideSmall Business Set Aside - Total
Notice typeCombined Synopsis/Solicitation
Posted13 September 2026
Response deadline17 September 2026 (closed)
Place of performanceGreat Falls, MT, USA

Description

Amendment 5 The purpose of this amendment is to provide answers to questions that have been received up to 9/13/2026 and to change the required delivery date on CLIN 0001/0002 to 31 January 2026. Does any wage determination, prevailing wage schedule, Service Contract Labor Standards requirement, certified payroll requirement, or contractor trade-license requirement apply to CLIN 0002? No, it does not apply The requirement calls for certified heavy machinery riggers, while Amendment 4 states that riggers will need Real ID for facility access. Is any specific rigger certification or license required in addition to the Real ID and EAL access requirements? No specific rigger certifications or licenses are required Our understanding of Amendment 4 is that the on-site installation electrician will perform the final electrical connection, and that the contractor/manufacturer should not include facility-side electrical wiring to the disconnect/panel. Please confirm. The on-site electrician will perform the final connection The solicitation pricing schedule lists CLIN 0002 as quantity 1, unit EACH, while the current notice description identifies CLIN 0002 as quantity 1 Job (JB). Which unit should quoters use on the completed pricing schedule? Each or Job is acceptable as long as the quantity is 1 (one) We have a machine option that meets the technical as well as DFAR requirements, however, the manufacturer is currently quoting approximately 14 16 weeks for delivery. Is November 30 a firm required delivery date, or would the Government consider an otherwise compliant offer with a delivery date beyond November 30 (approximately 1 month later)? The November 30 delivery date is the Government's preferred delivery target; however, it is not a mandatory pass/fail technical threshold. The Government will consider and evaluate technically compliant quotes that propose a firm delivery and installation completion date on or before December 31. Offerors must explicitly state their best realistic delivery lead time (in weeks after receipt of order) within their technical proposal, which will be binding upon contract award. End Amendment 5 Amendment 4 The purpose of this amendment is provide answers to questions that have been received up to 9/10/2026. The solicitation includes FAR 52.225-3/52.225-4 and provides for identification of Other Foreign End Products ; however, the solicitation also states that the offered machine must be manufactured in the United States, a DFARS qualifying country, or a TAA-compliant country. Please confirm whether an end product manufactured in China may be offered and evaluated under FAR 52.225-3, or whether Chinese-origin equipment is specifically excluded from consideration. Equipment manufactured in the People's Republic of China (or any other non-qualifying, non-TAA compliant country) is SPECIFICALLY EXCLUDED from consideration and will be evaluated as TECHNICALLY UNACCEPTABLE. Can you provide more details on the electrical run. Conduit type, for instance. Will it be overhead or along a wall? Is a scissor lift required for electrical install? In the RFQ, it stated that the government would wire to a disconnect and only the final connections would need to be made. The additional information provided, seems to contradict the RFQ by stating that the electrical would be run from the main panel? Conduit is in the floor, installation electrician is on site, electrical panel is 35-40 ft away. Does the electrician need special certifications to work onsite? Installation electrician is on site Also, for the riggers, do they need special certifications to work onsite? They will need a Real ID to get on base. Electrical Connection: Further clarification is needed. Please confirm that the Government/end user will provide the electrical drop, disconnect, and required electrical connection so that the machine can be connected and placed into service at installation. By law, the manufacturer or rigging contractor cannot perform electrical wiring. Installation Electrician will be on site to connect power Facility Access: Please advise what credentials or forms of identification will be required for the freight carrier, rigging crew, manufacturer s technician, and/or trainer to enter the facility. Real ID is required along with an EAL Offloading Equipment: Is there an onsite forklift of sufficient capacity available for use in offloading and positioning the machine, or should the rigging contractor provide all required forklift/crane equipment? Yes Startup/Test Bend: The solicitation requires a live test bend using Government-furnished material. Please confirm that the Government will have the appropriate material available onsite at the time of startup/commissioning and training. Yes, we will have material on-site Final Machine Placement: Please confirm that the final machine placement area is a flat, level concrete surface suitable for installation and anchoring of the approximately 14,000 16,000 lb press brake. Yes IUID: Please confirm if an IUID is required for this purchase. Yes End Amendment 4 Amendment 3 The purpose of this amendment is provide answers to questions that have been received up to 9/8/2026. Category 1: Tooling & Material Specifications Material Types & Thickness: What are all the material thicknesses you intend to form (from thinnest to thickest)? What are the specific types and grades of material you will be working with (e.g., A36 Mild Steel, 5052 Aluminum, 304 Stainless Steel)? 321 Stainless Steel 0.016 0.180 302 Stainless Steel 0.016 0.180 4901 Titanium 0.020 0.120 9046 Titanium 0.020 0.120 2024-T3 Aluminum 0.016 0.125 2024-T81 Aluminum 0.016 0.125 7075-O Aluminum 0.030 0.160 7075-T6 Aluminum 0.030 0.160 6061-O Aluminum Up To 0.125 (No other sizes are listed in our inventory) 7075-T651 Up to 0.250 (No other sizes are listed in our inventory) 5052-H43 0.020 0.375 Mild Steel 0.020 0.250 Tooling Configuration: For each material type and thickness, what is the required tooling configuration?. What are the required V-opening sizes for the Multi-V Bottom Die? Please provide specifics. Selecting the correct V-opening (V) depends heavily on your material thickness (T) and type. Mild Steel: formula: V = 8 T Stainless Steel (Harder): typically V = 10 T or 12 T Aluminum (Softer): Often uses V = 6 T for soft grades, or up to 10 T - 12 T for hard/T6 grades to prevent surface cracking. What are the required punch dimensions and angles for the Gooseneck Punch? Tip Working Angle: Ranges from 30 , 45 , 60 , 85 , 88 , to 90 . Springback Target Angle: Usually 88 or 86 for air-bending standard 90 parts. Outward Neck Angle: Ranges between 42 and 45 to provide relief clearance. Clamping Method: The solicitation specifies "quick-release clamping." Please clarify the preferred method: a) Hydraulic Clamping Category 2: Machine Configuration & CNC System CNC Gauging Axes: What is the required number of CNC gauging axes? CNC Control: 2-axis to 5-axis CNC with programmable sequences for repeatable bends Is there a specific back gauge configuration required? Back Gauge: Programmable back gauge for precise material positioning. Back Gauge Length: 23.6 25.6 in. Back Gauge Motor: hp Category 3: Facility, Installation & Rigging Installation Location: What is the building number and exact installation location for the press brake? Bldg 80 Aircraft Structural Maintenance shop Please confirm if "Building 60" is the final installation site or only the ship-to/receiving address. Only the ship-to/receiving address. Rigging & Placement Path: Can you provide photos or drawings of the entire delivery and rigging path? This should include: Exterior access points to the building. 12x12 ft Exterior overhead door / 2 ft grade Dimensions of overhead doors and interior doors/openings. 10x10 ft interior overhead door / 1ft grade Any changes in floor elevation or steps. No The total distance from the unloading point to the final placement spot. 100 yards Any overhead clearance or width restrictions along the path. No Category 4: Electrical & Power Requirements Power Connection: Will the facility provide the final power disconnect box near the press brake, or does this need to be included in the vendor's scope of work? If the vendor is to quote the connection, please provide: Details on the available power at the main electrical panel. 40A 208V 3 phase or 30A 40A 480V 3 phase The distance of the electrical run from the main panel to the press brake's location. 35-40 feet Photos of the main electrical panel and the proposed path for the electrical run. Path is already existing to another piece of equipment Category 5: General & Administrative Physical Constraints: Is the 156" (13-foot) maximum length/space constraint firm? One vendor (Accurpress) notes that their machine may fit, but the electrical cabinet door and optional safety systems could interfere with this limit. Please confirm if any flexibility is possible. 12-foot outside overhead door to bring…

Version history

SAM.gov has posted 10 notices under solicitation W50S7L-26-Q-A004, oldest first.

Documents in the solicitation package

1 file is attached to this notice.

Download them from SAM.gov, or open the solicitation in FedSift to read them with page-cited analysis.

Go deeper on this solicitation

FedSift reads the full solicitation package — every attachment — and pre-extracts the compliance matrix, evaluation factors, key risks, win themes and deal-breakers, each with a verbatim quote and the exact PDF page it came from. It scores the opportunity against your company profile, tells you whether to bid as prime or sub, and ranks teaming partners who could close your gaps.

Open the AI analysis in FedSift →

Free forever plan — no credit card. Browse solicitations without an account; sign in for AI analysis and matching.

Market context: DoD and NAICS 333517

About the buyer and the industry, not this specific solicitation. Source: USASpending.gov award data, updated nightly.

DoD contracts under NAICS 333517 →

Other open solicitations in NAICS 333517

All NAICS 333517 solicitations →

More from Department of Defense

All DoD solicitations →

Source: this notice on SAM.gov. FedSift republishes public federal procurement data and is not affiliated with the U.S. Government. Always confirm dates and requirements against SAM.gov before responding.